2225 Holland Avenue
Bronx, NY 10467BBL 2-04344-0042Map
Owner of record: Pelham Homes Associat Limited Partnershi P
2225 Holland Avenue is an elevator apartment building built in 1957 in Bronx, 10467. It has 61 residential units across 6 floors. The owner of record is Pelham Homes Associat Limited Partnershi P. HPD has recorded 297 housing violations here, most recently on April 21, 2026. 38 of the 50 most recent violations are still open. City tax records listed 61 rent-stabilized apartments here in 2024.
- HPD violations
- 297
- DOB violations
- 56
- ECB violations
- 20
- HPD complaints
- 333
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 297
- BHazardous
Properly repair or replace the broken or defective latch at door at public hall, 3rd story
Apr 21, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at public hall, 3rd story
Apr 21, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling, north wall and east wall at building entrance level at public hall
Apr 9, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 2nd room from east at south located at apt 1j, 1st story, 2nd apartment from south at west
Apr 9, 2026 · Apt 1J
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the bathroom located at apt 1j, 1st story, 2nd apartment from south at west
Apr 9, 2026 · Apt 1J
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1j, 1st story, 2nd apartment from south at west
Apr 9, 2026 · Apt 1J
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, east wall and north wall at building entrance level at public hall
Apr 9, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Apr 9, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1j, 1st story, 2nd apartment from south at west
Apr 9, 2026 · Apt 1J
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1j, 1st story, 2nd apartment from south at west
Apr 9, 2026 · Apt 1J
Open — Nov sent out
Show 40 more ↓
- BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 1j, 1st story, 2nd apartment from south at west
Apr 9, 2026 · Apt 1J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall and north wall at building entrance level at public hall
Apr 5, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at east wall and north wall at building entrance level at public hall
Apr 5, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1j, 1st story, 2nd apartment from south at west
Apr 5, 2026 · Apt 1J
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1j, 1st story, 2nd apartment from south at west
Apr 5, 2026 · Apt 1J
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 3rd room from east at south located at apt 1j, 1st story, 2nd apartment from south at west
Apr 5, 2026 · Apt 1J
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at bathtub in the bathroom located at apt 1j, 1st story, 2nd apartment from south at west
Apr 5, 2026 · Apt 1J
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Apr 5, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 1j, 1st story, 2nd apartment from south at west
Apr 5, 2026 · Apt 1J
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4j, 5th story, 2nd apartment from south at west , section ''north''
Jan 6, 2026 · Apt 4J
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4j, 5th story, 2nd apartment from south at west , section ''north''
Jan 6, 2026 · Apt 4J
Open — Nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 6g, 6th story, 1st apartment from east at south
Nov 2, 2025 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets at the sink in the kitchen located at apt 6g, 6th story, 1st apartment from east at south
Nov 2, 2025 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 6g, 6th story, 1st apartment from east at south
Nov 2, 2025 · Apt 6G
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 6g, 6th story, 1st apartment from east at south
Nov 2, 2025 · Apt 6G
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 6g, 6th story, 1st apartment from east at south
Nov 2, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Provide glass in place of plexiglass installed at all panes at building entrance (street to vestibule) at public hall, 1st story
Oct 1, 2025
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at all panes at building entrance (street to vestibule) at public hall, 1st story
Oct 1, 2025
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective wood floor in the 4th room from north at west located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north at west located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 4th room from north at west located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the 2nd room from north at east located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from north at east located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 6g, 6th story, 1st apartment from east at south
Aug 18, 2025 · Apt 6G
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jul 19, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling and east wall, '' north section'' at public hall, 6th story
May 22, 2025
Open — Not complied with - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall '' north section '' at public hall, 6th story
May 22, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling, ''north section'' at public hall, 6th story
May 22, 2025
Closed — Violation closed - BHazardous
Provide adequate lighting for electric ceiling light fixture '' north -3 '' south section'' at public hall, 6th story
May 22, 2025
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser pipe at west in the bathroom located at apt 3c, 3rd story, 1st apartment from west at north , section ''north''
May 10, 2025 · Apt 3C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling and east wall in the bathroom located at apt 3c, 3rd story, 1st apartment from west at north , section ''north''
May 10, 2025 · Apt 3C
Open — Defect letter issued - BHazardous
Repair the leaky and/or defective faucets hot and cold at bath tub in the bathroom located at apt 3c, 3rd story, 1st apartment from west at north , section ''north''
May 10, 2025 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from west at north , section ''north''
May 10, 2025 · Apt 3C
Closed — Violation dismissed
DOB building violations · 56
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 5, 2025
Dob violation - active - Immediate emergency anythingoptional
Immediately install 200' linear feet on expo #1 east elevation (holland ave) including the entrance courtyard of sidewalk shed as per 1 rcny 103.04
Nov 7, 2024
Dob violation - active - Construction other optional
Emergency work order due to loose/hanging metal from in wall a/c unit sleeve, 4fl ne end. cracked/broken glass windows multo loc @ exp#1 eas conditions pose imminent danger to public. remedy: immediately take & provide safe meas to secure & prote pub & install public protection under the supervision of a nys licensed professional
Oct 29, 2024
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2023)
Jun 23, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - active
Show 40 more ↓
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 11, 2020
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 29, 2020
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 9, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2019
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 16, 2019
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2018
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 10, 2017
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2017
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2017
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2017
Dob violation - active - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Oct 17, 2016
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2016
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2016
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years(2015)
Jun 1, 2016
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Feb 2, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 18, 2015
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Nov 2, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2015
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2015
Dob violation - active - Failure to submit eer none
Failure to submit an energy efficiency report in 2014 per ad. code sec. 28-308.4
Dec 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 29, 2014
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - active - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst
May 30, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 11, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 1, 2011
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active
ECB violations · 20
- Class - 1
Failure to maintain building exterior facade and/or appurtenances. at time of inspection step cracks, deteriorated mortar joints and crackedwindow were observed at exposure 1(east elevation). at exposure 3(west
Jun 27, 2025 · Penalty $5,000
Active - Class - 1
Failure to maintain exterior building walls and appurtenances. as noted: at time of inspection i observed appurtenances. as noted: at time of inspection on exposure #1 east elevation ac inadequately supported a
Dec 17, 2024 · Penalty $12,500
Active - Class - 1
Failure to maintain building exterior facade and appurtenances. note: at time of inspection, i observed, (1)cracked/spalling brick/mortar joints exp #1 east, #2 south. (2)cracked/broken window glass, 3 at exp #
Oct 29, 2024 · Penalty $12,500
Active - Class - 1
Failure to provide unobstructed exit passwageway. note: at time of inspection, i observed at exp #1 east, #3 west, #4 north objects on fire escapes multi loc obstructing emergency exit passageway. remedy: remov
Oct 29, 2024 · Penalty $6,250
Active - Class - 3
Work w/o permit.i observed new partition wall w/door,installed in living rm of apt1h,creating 2nd bedrm.partition wall consist of sheetrock board&interior framing&secured to outer walls of apt.inner wall aprx8'
Nov 23, 2022 · Penalty $250
Resolve - Class - 1
No door lock monitoring installed in this controller as per 3.10.12 of appendix k3 of the 2014 nycbc. remedy; install dlm and perform and file test with nycdob.
Jun 21, 2021 · Penalty $1,250
Resolve - Class - 2
Found discharge pipes on safety relief valves to proper height from floor and not properly supported, body drains also missing. belt cover on pump set missing. no lights in boiler room.
Oct 28, 2019 · Penalty $3,125
Active - Class - 2
Found raypak boiler model# w1-0514a, not in operation and in poor condition. gas and electricity still connected, unit to be totally disconnected or removed.
Oct 28, 2019 · Penalty $3,125
Active - Class - 2
56y10,59b01,74o02,71x10,75i10,52o02,14m07,64m07,15m07. 56y-repair oil leak; 59b-provide permanent mark on tag; 74o-clean; 71x-repair pit light; 75i-repair; 52o-clean hoistway rope; 14m-provide and install
Jul 29, 2019 · Penalty $3,125
Active - Class - 2
B254,32a,50,50a,50b,50c,50d,50e,50f. 50-incorrect, gauge of metal flue pipe installed on federal boiler; 50a-poor flame from burner, co2 combustion test required;50b-condensate tank vent reduced and not pipe
Jul 31, 2015 · Penalty $2,500
Active
Show 10 more ↓
- Class - 2
B254,6a,24b,50. 50-pipes corroded and leaking at boiler, and circulator.
Jul 21, 2015 · Penalty $2,500
Active - Class - 2
7/h/11,16/b/10,16/d/6,16/h/11,17/d/6,39/d/6,40/p/16,78/h/10,34/o/02/16-b-10-hoistway doors not self closing l,3,6 flrs/16-d-6-5 flr rolley base assembly/16-h-11-release roller were need it.17/d/6-4flr door gibs
Aug 18, 2010 · Penalty $2,500
Active - Class - 2
2x10.5e10.14m7.17b10.34y2.40p16.53b14.71x10.78e10.97e10.17b10 hositway doors not self closing 97e10 car rubbing in hoistway
Dec 12, 2008 · Penalty $500
Active - Non-hazardous
S 2x10/s 10h11/7j1/14m7/25w6/28l10/31h1/86u5. 2-x-10-repair alarm system. 10-h-11-install 2 gibs cab door. have only one. 7-j-1-adjust safety edge blade goes to for before activate. 28-l-10-cab door slammed
Jul 5, 2006 · Penalty $880
Resolve - Non-hazardous
2b10,84h11,39d7,66o2. 84-car door saddle,2 alarm bell not working.
Jun 13, 2006 · Penalty $2,500
Resolve - Non-hazardous
2x10/5j1/17h11/21q3/27o2/33o2/41b10. z-repair alarm, provide alarm button in car station also repair stop button alarm in car station. 5-adjust cab door to much gap went close. 17-provide missing hoistway door
Apr 18, 2006 · Penalty $2,500
Resolve - Hazardous
Cease use. 51k10/51o02/52o02/44h10/43h08/14hm07/03r10/72e10/02l10/44b07. 51k- 10-02 evident of rouge 44h- bushing 44bb- gov. missing up electric switch 03r- cab fan covered w/new ceiling, no ventilation 02l- bu
Mar 9, 2006 · Penalty $2,500
Resolve - Hazardous
Occupancy contrary to that allowed by bldg. dept. records from storagerm. to illegal use as a fam rm. to illegal use as a fam rm w/gas stove. remedy: discontinue illegal use -or- amend the c of o.
Jan 4, 2006 · Penalty $2,500
Active - Non-hazardous
85bb05/41g07/40t07. 85-bb-05-5 yr. test tag expired 9/84. 41-g-07-fusejump out on controller. 40-t-07-provide sign on elevator motor room door.
Jul 25, 2005 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior wall. defect is : (1) missing concrete coping under railing (2) brickwork is missing mortar location : front 1st floor balconly remedy : make all necessary repair
Feb 11, 2003 · Penalty $2,500
Active
Complaints
- Paint/plaster
Ceiling
Apr 8, 2026 · Apt 1J
Close - Plumbing
Basin/sink
Apr 8, 2026 · Apt 1J
Close - Unsanitary condition
Mold
Apr 8, 2026 · Apt 1J
Close - Plumbing
Bathtub/shower
Apr 8, 2026 · Apt 1J
Close - Water leak
Slow leak
Mar 27, 2026 · Apt 1J
Close - Paint/plaster
Ceiling
Mar 27, 2026 · Apt 1J
Close - Paint/plaster
Ceiling
Feb 24, 2026 · Apt 1J
Close - Water leak
Slow leak
Feb 24, 2026 · Apt 1J
Close - Paint/plaster
Ceiling
Feb 17, 2026 · Apt 1J
Close - Plumbing
Basin/sink
Feb 17, 2026 · Apt 1J
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Feb 17, 2026 · Apt 1J
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BUILDI
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 2G
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt 6G
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 2, 2026 · Apt 3G
Close - Heat/hot water
Apartment only
Jan 2, 2026 · Apt 4J
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Nov 1, 2025 · Apt 6G
Close - Plumbing
Steam pipe/riser
Nov 1, 2025 · Apt 6G
Close - Paint/plaster
Ceiling
Nov 1, 2025 · Apt 6G
Close - Heat/hot water
Apartment only
Nov 1, 2025 · Apt 6G
Close - Heat/hot water
Entire building
Aug 22, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Aug 13, 2025 · Apt 6G
Close - Heat/hot water
Entire building
Aug 13, 2025 · Apt 6G
Close - Water leak
Slow leak
Aug 13, 2025 · Apt 6G
Close - Electric
Power outage
Aug 13, 2025 · Apt 6G
Close - Water leak
Heavy flow
Aug 13, 2025 · Apt 6G
Close - Electric
Power outage
Aug 13, 2025 · Apt 6G
Close - Plumbing
Basin/sink
Aug 13, 2025 · Apt 6G
Close - Heat/hot water
Apartment only
Aug 13, 2025 · Apt 6G
Close - Heat/hot water
Entire building
May 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
May 4, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
May 2, 2025 · Apt 3C
Close - Unsanitary condition
Pests
May 2, 2025 · Apt 3C
Close - Flooring/stairs
Floor
May 2, 2025 · Apt 3C
Close - Plumbing
Bathtub/shower
May 2, 2025 · Apt 3C
Close - Heat/hot water
Entire building
Apr 27, 2025 · Apt 4J
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1957
- Floors
- 6
- Residential units
- 61
- Building area
- 73,500 ft²
- Lot area
- 17,500 ft²
- Zoning
- R6
- Community board
- 211
- Council district
- 13
- Block / lot
- 4344 / 42
- Assessed value
- $1,197,450
- Landmark / historic district
- No
HPD registration #215671, last renewed Jan 13, 2026.
Questions about 2225 Holland Avenue
Who owns 2225 Holland Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Pelham Homes Associat Limited Partnershi P.
Does 2225 Holland Avenue have violations?
Yes. NYC HPD has recorded 297 housing violations at this property.
Is 2225 Holland Avenue rent stabilized?
NYC Department of Finance tax bills listed 61 rent-stabilized units here in 2024 (about 100% of its 61 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2225 Holland Avenue built?
City records list 1957 as the year it was built.
How many apartments are in 2225 Holland Avenue?
It has 61 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.