1453 Williamsbridge Road
Bronx, NY 10461BBL 2-04077-0052Map
Owner of record: 73 Maple Holdings Corp.
1453 Williamsbridge Road is a mixed residential and retail building built in 1925 in Bronx, 10461. It has 6 residential units across 3 floors. The owner of record is 73 Maple Holdings Corp.. HPD has recorded 177 housing violations here, most recently on September 2, 2025. 26 of the 50 most recent violations are still open. City tax records listed 5 rent-stabilized apartments here in 2023.
- HPD violations
- 177
- DOB violations
- 10
- ECB violations
- 5
- HPD complaints
- 268
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 177
- ANon-hazardous
Properly repair or replace the broken or defective broken mail box for apt. 1f , 1st story
Sep 2, 2025
Closed — Violation dismissed - ANon-hazardous
Provide sufficient,proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 17, 2025
Closed — Violation dismissed - BHazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Aug 17, 2025 · Apt 1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the bathroom located at apt 2l, 2nd story, 1st apartment from north at east
Apr 22, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Apr 22, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Provide escucheon plate at upper riser in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Apr 17, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at light fixture at ceiling (outside apt 2l 2nd story) at public hall at , 2nd story
Apr 17, 2025
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of pests. evidence of observed rat droppings in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Apr 17, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from north at east
Apr 17, 2025 · Apt 2L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2l, 2nd story, 1st apartment from north at east
Apr 17, 2025 · Apt 2L
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latchset at lobby, 1st story
Apr 17, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mailbox lock for apt 2l at vestibule , 1st story
Apr 17, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at window in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Apr 2, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light switch at north wall in the 3rd room from north at west located at apt 2l, 2nd story, 1st apartment from east at south
Apr 2, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical outlet at west wall in the 3rd room from north at west located at apt 2l, 2nd story, 1st apartment from east at south
Apr 2, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Apr 2, 2025 · Apt 2L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 2l, 2nd story, 1st apartment from north at east
Mar 13, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the 2nd room from east located at apt 2l, 2nd story, 1st apartment from north at east
Mar 13, 2025 · Apt 2L
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective sink base cabinet in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Mar 4, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Provide stove knob safety covers or permanent stove safety knobs with integrated locking mechanisms for the gas stove top in the kitchen located at apt 2l, 2nd story, 1st apartment from north at east
Mar 4, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2025 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective upper window sash springs balance, window at east wall in the 2nd room from north located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2025 · Apt 1
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective bell /buzzer intercom system leading from building front entrance door to east wall at public hall, 1st story
Feb 26, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Feb 26, 2025 · Apt 1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the 1st room from east at north located at apt 2l, 2nd story, 1st apartment from north at east
Jan 30, 2025 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from east at north located at apt 2l, 2nd story, 1st apartment from north at east
Jan 30, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, west wall in the 3rd room from north at west located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from east at south wall, 1st window frame from south at west wall in the 3rd room from north at west located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame in the foyer located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, south wall, east wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, south wall, west wall, 1st window frame from south at west wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 3rd room from north at east located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall, 1st window frame from east at south wall in the 3rd room from north at east located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Certification postponment denied - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door, 2nd closet from north at east wall door frame in the foyer located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at south wall in the 3rd room from north at east located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the bathroom located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2l, 2nd story, 1st apartment from east at south
Jan 17, 2025 · Apt 2L
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3f, 2nd story, 1st apartment from north at east
Jan 15, 2025 · Apt 3F
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3f, 2nd story, 1st apartment from north at east
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3f, 2nd story, 1st apartment from north at east
Jan 15, 2025 · Apt 3F
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material at public hall, 2nd story
Jan 15, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of construction material at public hall, 1st story
Jan 15, 2025
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding 130 degrees at faucets in the kitchen located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2l, 2nd story, 1st apartment from south at west
Jan 15, 2025 · Apt 2L
Open — Invalid certification
DOB building violations · 10
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Construction other optional
Observed vertical & horizontal crack with separation at left side front exterior wall.
Apr 29, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 5
- Class - 1
Failure to maintain building wall(s) or appurtenances; noted: observed a vertical & horizontal crack with separation at the left side front exterior facade wall plus a hole opening at the middle section of the
Apr 29, 2025 · Penalty $5,000
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons #39093227n issued on 08/23/2023, and failure to file a certificate of correction pursuant to 28.201.1 and 1 rcny 102-01(d)(2). an acceptable cert
Jan 29, 2025 · Penalty $1,250
Active - Class - 2
Found crown boiler model #bsi380en, not registered with dob, pull permit bring job up to current code and call for inspection for sign off.
Apr 29, 2024 · Penalty $3,125
Active - Class - 1
Electrical work without a permit. observed at exposure#2 a newly installed exterior a/c unit attached to the wall and hardwired to an electrical box, obtain permit; obtain permt
Aug 23, 2023
Resolve - Class - 2
Work without permit. observed an illuminated business accessory sign at facade above ground level commercial space. approx. 16'lx4'hx2'd metal frame box; sign reads "zaza" in blue color text on a black backgrou
Aug 23, 2023
Resolve
Complaints
- Unsanitary condition
Pests
May 31, 2025 · Apt 1
Close - Door/window
Door
May 17, 2025 · Apt 2L
Close - General
Mailbox
May 17, 2025 · Apt 2L
Close - Electric
Wiring
May 17, 2025 · Apt 2L
Close - Electric
Outlet/switch
May 17, 2025 · Apt 2L
Close - Plumbing
Bathtub/shower
May 17, 2025 · Apt 2L
Close - Appliance
Electric/gas range
May 17, 2025 · Apt 2L
Close - Appliance
Refrigerator
May 17, 2025 · Apt 2L
Close - Paint/plaster
Ceiling
May 17, 2025 · Apt 2L
Close - Unsanitary condition
Pests
May 17, 2025 · Apt 2L
Close
Show 40 more ↓
- Electric
Power outage
Apr 19, 2025 · Apt 2L
Close - General
Ventilation system
Apr 9, 2025 · Apt 2L
Close - Appliance
Refrigerator
Apr 9, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Apr 9, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Apr 9, 2025 · Apt 2L
Close - General
Bell/buzzer/intercom
Apr 9, 2025 · Apt 2L
Close - General
Mailbox
Apr 9, 2025 · Apt 2L
Close - Electric
Wiring
Apr 9, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Apr 9, 2025 · Apt 2L
Close - Door/window
Door
Apr 9, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Apr 9, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 5, 2025 · Apt BLDG
Close - Plumbing
Bathtub/shower
Apr 3, 2025 · Apt 2L
Close - Electric
Wiring
Apr 3, 2025 · Apt 2L
Close - Electric
Outlet/switch
Apr 3, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Apr 2, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Apr 2, 2025 · Apt 2L
Close - Safety
Window guard broken/missing
Mar 28, 2025 · Apt 2L
Close - Plumbing
Bathtub/shower
Mar 28, 2025 · Apt 2L
Close - Unsanitary condition
Mold
Mar 28, 2025 · Apt 2L
Close - Electric
Outlet/switch
Mar 28, 2025 · Apt 2L
Close - Plumbing
Radiator
Mar 28, 2025 · Apt 2L
Close - Electric
No lighting
Mar 28, 2025 · Apt 2L
Close - Unsanitary condition
Pests
Mar 28, 2025 · Apt 2L
Close - Electric
Lighting
Mar 28, 2025 · Apt 2L
Close - Door/window
Window frame
Mar 28, 2025 · Apt 2L
Close - General
Mailbox
Mar 28, 2025 · Apt 2L
Close - Door/window
Door
Mar 28, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Mar 3, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2025 · Apt BLDG
Close - General
Bell/buzzer/intercom
Feb 26, 2025 · Apt 2L
Close - Heat/hot water
Entire building
Feb 26, 2025 · Apt 2L
Close - Flooring/stairs
Floor
Feb 26, 2025 · Apt 2L
Close - Electric
Outlet/switch
Feb 26, 2025 · Apt 2L
Close - Electric
No lighting
Feb 26, 2025 · Apt 2L
Close - General
Cabinet
Feb 26, 2025 · Apt 2L
Close - Unsanitary condition
Mold
Feb 26, 2025 · Apt 2L
Close - Door/window
Window frame
Feb 26, 2025 · Apt 2L
Close - Door/window
Door
Feb 26, 2025 · Apt 2L
Close - Heat/hot water
Apartment only
Feb 26, 2025 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1925
- Floors
- 3
- Residential units
- 6
- Building area
- 7,600 ft²
- Lot area
- 3,123 ft²
- Zoning
- R6
- Community board
- 210
- Council district
- 18
- Block / lot
- 4077 / 52
- Assessed value
- $542,700
- Landmark / historic district
- No
HPD registration #206080, last renewed Jul 1, 2025.
Questions about 1453 Williamsbridge Road
Who owns 1453 Williamsbridge Road?
The owner of record in NYC Department of City Planning PLUTO data is 73 Maple Holdings Corp..
Does 1453 Williamsbridge Road have violations?
Yes. NYC HPD has recorded 177 housing violations at this property.
Is 1453 Williamsbridge Road rent stabilized?
NYC Department of Finance tax bills listed 5 rent-stabilized units here in 2023 (about 83% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1453 Williamsbridge Road built?
City records list 1925 as the year it was built.
How many apartments are in 1453 Williamsbridge Road?
It has 6 residential units and 10 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.