1743 Fillmore Street
Bronx, NY 10460BBL 2-04029-0014Map
Owner of record: 1743 Fillmore Properties LLC
1743 Fillmore Street is a walk-up apartment building built in 1927 in Bronx, 10460. It has 6 residential units across 3 floors. The owner of record is 1743 Fillmore Properties LLC. HPD has recorded 160 housing violations here, most recently on December 6, 2025. 11 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 160
- DOB violations
- 15
- ECB violations
- 7
- HPD complaints
- 230
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 160
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door at public hall, 1st story
Dec 6, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 2, 2025
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temperature exceeding over 130 degrees at all fixtures at bathroom and in the kitchen located at apt 1f, 1st story, 1st apartment from east at south
Dec 2, 2025 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinge in the entrance located at apt 1f, 1st story, 1st apartment from east at south
Dec 2, 2025 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Dec 2, 2025 · Apt 1F
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance door (street to vestibule) at public hall, 1st story
Dec 26, 2024
Closed — Violation closed - CImmediately hazardous
Properly secure the loose 1st marble tread up from bottom (creating trip hazard) at public hall stairs, 1st story
Dec 26, 2024
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Dec 6, 2023
Open — Invalid certification - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from north located at apt 2f, 2nd story, 1st apartment from north at east
Dec 6, 2023 · Apt 2F
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair or replace the carbon monoxide detecting device(s). defective located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from north located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective ceramic floor in the bathroom located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .. in the entrance located at apt 1r, 1st story, 1st apartment from east at south
Jul 3, 2023 · Apt 1R
Closed — Violation closed - BHazardous
Properly repair the broken or defective base cabinet floor at sink in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Nov 23, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance upper sash 1st window from south at west wall in the 4th room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Nov 23, 2022 · Apt 3R
Closed — Violation dismissed - BHazardous
Properly repair the broken or defective spring balance upper sash 2nd window from south at west wall in the 4th room from east at south located at apt 3r, 3rd story, 1st apartment from south at west
Nov 23, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Replace with new the broken or defective inner glass pane upper sash 2nd window from east at south wall in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from south at west
Nov 23, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water temp exceeding 130 degrees in the entire apartment located at apt 3f, 3rd story, 1st apartment from west at north
Jan 24, 2022 · Apt 3F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water at temperature of 180 degrees at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Jan 23, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective air valve at steam radiator in the 4th room from east located at apt 3r, 3rd story, 1st apartment from south at west
Jan 23, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective air valve at steam radiator in the 3rd room from east located at apt 3r, 3rd story, 1st apartment from south at west
Jan 23, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Properly repair the broken or defective cabinet under sink in the kitchen located at apt 3r, 3rd story, 1st apartment from south at west
Jan 23, 2022 · Apt 3R
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3r, 3rd story, 1st apartment from south at west
Jan 23, 2022 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east at south located at apt 3f, 3rd story, 1st apartment from north at east
Jan 19, 2022 · Apt 3F
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 19, 2022
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water temperature exceding over 130 f at bathroom and in the kitchen in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Dec 11, 2020 · Apt 1F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water, hot water exceeding 130 degress farenheit at all hot water fixtures. in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Dec 1, 2019 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening electromagnetic lock device installed at door at building entrance , 1st story
Nov 19, 2019
Closed — Violation dismissed - BHazardous
Provide an acceptable heavy duty lock and latch set at entrance door to the building , 1st story
Nov 19, 2019
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Feb 22, 2019 · Apt 1F
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Feb 22, 2019 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum temperature of 130 degrees at all fixtures at bathroom andkitchen in the entire apartment located at apt 1f, 1st story, 1st apartment from east at south
Feb 22, 2019 · Apt 1F
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130f at kitchen & bathroom fixtures located at apt 2r, 2nd story, 1st apartment from east at south
Jan 9, 2019 · Apt 2R
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill on to 1st balcony at fire escape
Oct 10, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at basement at public hall
Aug 31, 2018
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall
Aug 31, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Aug 31, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. at public hall
Aug 31, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor ... at public hall
Aug 31, 2018
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3f, 3rd story, 1st apartment from north at east
Aug 31, 2018 · Apt 3F
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 2nd window from east at south at building front fire escape , 2nd story
Jul 9, 2018
Closed — Violation closed - CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at building rear fire escape , 1st story
Jul 9, 2018
Closed — Violation dismissed - BHazardous
Arrange and make self-closing the doors .. in the entrance located at apt 3f, 3rd story, 1st apartment from north at east
Jul 9, 2018 · Apt 3F
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the kitchen located at apt 3f, 3rd story, 1st apartment from north at east
Jul 9, 2018 · Apt 3F
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of scalding hot water exceeding 130 degrees in the entire apartment located at apt 3r, 3rd story, 1st apartment from south at west
Jul 9, 2018 · Apt 3R
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Feb 28, 2018
Closed — Violation closed
DOB building violations · 15
- Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 14, 2018
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 9, 2011
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Nov 9, 2010
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
Show 5 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Apr 23, 1993
Dob violation - dismissed
ECB violations · 7
- Class - 1
Failure to comply w/the comm's order contained in summons/vio#35244388y issued on 08/20/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Jan 3, 2019 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35244389x issued on 08-20-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to provide unobstructed exit passageway: note at exp#3
Nov 17, 2018
Resolve - Class - 1
Failure to comply with the commissioners order contained in summons/ violation #35244388y issued on 8/20/18 and to file a certificate of correction pursuant to28-201.1 and 1rcny 102-01.work without a permit
Nov 17, 2018 · Penalty $6,250
Resolve - Class - 2
Failure to comply w/the comm's order contained in summons/vio#35244389x issued on 08-20-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. remedy: comply w/comm's order &/or file a c of c.
Oct 3, 2018 · Penalty $625
Resolve - Class - 1
Work without a permit.noted:installation of new electrical wiring and outlets and plumbing lines for washer and dryer at cellar work is approx 60 percent complete.rem:stop all work at cellar and obtain permit
Aug 20, 2018 · Penalty $1,600
Resolve - Class - 1
Failure to provide unobstructed exit passageay noted:fire escape at rear of building fire passageway is obstructed with garbage bags construction material and refrigerator with doors still in place.rem:remove o
Aug 20, 2018 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code-complaint manner. noted: linter above 3rd fl window at front has failed several courses of brick have detached & fallen onto fire escape,a 5'x 5' section of parapet is
Nov 8, 2010 · Penalty $1,000
Resolve
Complaints
- Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 1F
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2025 · Apt 1F
Close - Heat/hot water
Apartment only
Nov 29, 2025 · Apt 1F
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Dec 9, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Dec 7, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Dec 3, 2024 · Apt 3R
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt 1R
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt 1F
Close - Heat/hot water
Entire building
Nov 29, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2023 · Apt BLDG
Close - Flooring/stairs
Floor
Jun 30, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 30, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 30, 2023 · Apt 1R
Close - Paint/plaster
Ceiling
Jun 30, 2023 · Apt 1R
Close - Plumbing
Radiator
Dec 2, 2022 · Apt 2R
Close - Heat/hot water
Entire building
Nov 28, 2022 · Apt BLDG
Close - General
Cabinet
Nov 16, 2022 · Apt 3R
Close - Door/window
Window frame
Nov 16, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Nov 16, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Feb 19, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Jan 28, 2022 · Apt 3F
Close - Heat/hot water
Entire building
Jan 20, 2022 · Apt 3F
Close - Electric
Power outage
Jan 19, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Jan 19, 2022 · Apt 3R
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 14, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 30, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 21, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Dec 7, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Nov 20, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Nov 17, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Nov 15, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Nov 14, 2020 · Apt 1F
Close - Heat/hot water
Entire building
Nov 19, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 22, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 21, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 19, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 11, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Feb 10, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Jan 25, 2019 · Apt 1F
Close - Heat/hot water
Apartment only
Jan 12, 2019 · Apt 1F
Close - Heat/hot water
Entire building
Jan 8, 2019 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2019 · Apt 1F
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C2)
- Year built
- 1927
- Floors
- 3
- Residential units
- 6
- Building area
- 4,860 ft²
- Lot area
- 2,375 ft²
- Zoning
- R5
- Community board
- 211
- Council district
- 13
- Block / lot
- 4029 / 14
- Assessed value
- $435,150
- Landmark / historic district
- No
HPD registration #206662, last renewed Aug 5, 2025.
Questions about 1743 Fillmore Street
Who owns 1743 Fillmore Street?
The owner of record in NYC Department of City Planning PLUTO data is 1743 Fillmore Properties LLC.
Does 1743 Fillmore Street have violations?
Yes. NYC HPD has recorded 160 housing violations at this property.
Is 1743 Fillmore Street rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1743 Fillmore Street built?
City records list 1927 as the year it was built.
How many apartments are in 1743 Fillmore Street?
It has 6 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.