1750 Van Buren Street
Bronx, NY 10460BBL 2-04019-0001Map
Owner of record: 1750-51 Vanburen 520 Morris Pk Etal
1750 Van Buren Street is a walk-up apartment building built in 1925 in Bronx, 10460. It has 22 residential units across 5 floors. The owner of record is 1750-51 Vanburen 520 Morris Pk Etal. HPD has recorded 57 housing violations here, most recently on September 14, 2026. 13 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 57
- DOB violations
- 1
- ECB violations
- 1
- HPD complaints
- 138
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 57
- BHazardous
Properly repair with similar material the broken or defective wood floor, in the 4th room from north located at apt 2b, 2nd story, 1st apartment from west at north
Sep 14, 2026 · Apt 2B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material all walls at bulkhead, at public hall, 5th story
Sep 14, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of bbq grill, walker, baby stroller, etc.. storage under staircase at public hall, 1st story
Sep 14, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective vestibule door , 1st story
Sep 25, 2024
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective fire retardant materials at south wall at public hall bulk head. , 5th story
Sep 25, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall at public hall bulkhead , 5th story
Sep 25, 2024
Closed — Violation dismissed - BHazardous
Properly secure the loose interior door knob in the entrance located at apt 2b, 2nd story, 1st apartment from west at north
Sep 25, 2024 · Apt 2B
Closed — Violation closed - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide at front of building at fire escape
Aug 17, 2023
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to repair = 0; wg to replace = 0; in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from east at south wall, south wall in the private hallway located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, 1st door frame from south at west wall in the 4th room from east located at apt 2c, 2nd story, 1st apartment from east at south
Feb 15, 2023 · Apt 2C
Open — Nov sent out - ANon-hazardous
Replace with new the broken or defective door at entrance in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and walls in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the private hallway located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings and all walls in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective fire proof door was not self closing. in the entrance located at apt 2c, 2nd story, 1st apartment from south at west
Dec 29, 2022 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective at bulkhead
Nov 15, 2022
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from south at west
Oct 22, 2022 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Oct 22, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 18, 2022
Closed — Violation dismissed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Dec 5, 2021
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the private hallway located at apt 4b, 4th story, 1st apartment from west at north
Oct 28, 2021 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 1st apartment from west at north
Oct 28, 2021 · Apt 4B
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 4b, 4th story, 1st apartment from west at north
Oct 28, 2021 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 5; located at apt 3d, 3rd story, 1st apartment from north at east
Aug 27, 2014 · Apt 3D
Closed — Violation closed - BHazardous
Provide adequate lighting at or near the outside of the front entranceway of the building and keep same burning from sunset every day to sunrise on the day following a minimum of 100 watts of incandescent light required. (light fixture present)
Apr 18, 2014
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of house items on the 4th sty balcony at stack on the south side of the building
Oct 7, 2013
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of house items on the 3rd sty balcony at stack on the south side of the building
Oct 7, 2013
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of house items on the 1st sty balcony at stack on the south side of the building
Oct 7, 2013
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of flower pots on the 5th sty balcony at stack on the north side of the building
Oct 7, 2013
Closed — Violation dismissed - ANon-hazardous
Section 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder at stack on the north side of the building
Oct 7, 2013
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the kitchen located at apt 5e, 5th story, 1st apartment from south at west
Aug 4, 2005 · Apt 5E
Open — Invalid certification - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 5e, 5th story, 1st apartment from south at west
Jul 29, 2005 · Apt 5E
Open — Invalid certification - ANon-hazardous
Properly repair the broken or defective intercom in the foyer located at apt 4b, 4th story, 1st apartment from west at north
Oct 4, 2000 · Apt 4B
Open — Nov sent out - ANon-hazardous
Properly repair the broken or defective mortise lock assembly in the entrance located at apt 4b, 4th story, 1st apartment from west at north
Oct 4, 2000 · Apt 4B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of odor menating from 3rd sty west apt 3c into pub hall. located at apt 3c
Sep 1, 1994 · Apt 3C
Open — Nov sent out - CImmediately hazardous
Cleanse and disinfect to the satisfaction of this department after removing the cat unirn & feces 3rd sty west apt 3c entire apt.
Sep 1, 1994
Open — Nov sent out - BHazardous
Properly repair the broken or defective spring balanced to bottom sash 2nd sty south apt 2c east room. , section '' ''
Jul 18, 1993 · Apt 2C
Open — False certification
DOB building violations · 1
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
ECB violations · 1
- Class - 3
Work without a permit.i observed at the above address blue awning withwhite lettering iglesia de jesucristo restauracion.the awning is approximately 24ft x 4ft.no permits filed at the dob for this install.rem:o
Mar 18, 2021 · Penalty $500
Active
Complaints
- Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2CAND2
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Feb 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt 2E
Close - Heat/hot water
Entire building
Dec 6, 2023 · Apt BLDG
Close - Paint/plaster
Ceiling
Feb 17, 2023 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 26, 2022 · Apt 1B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Dec 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2022 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 11, 2022 · Apt 3D
Close - Heat/hot water
Entire building
Oct 20, 2022 · Apt 4B
Close - Unsanitary condition
Garbage/recycling storage
Nov 9, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 3, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 2, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 29, 2021 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 28, 2021 · Apt 4B
Close - Water leak
Damp spot
Oct 28, 2021 · Apt 4B
Close - Heat/hot water
Apartment only
Oct 28, 2021 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 19, 2021 · Apt 4B
Close - Electric
Power outage
Jul 4, 2020 · Apt 5A
Close - Heat/hot water
Entire building
Nov 26, 2019 · Apt 4B
Close - Heat/hot water
Entire building
Nov 7, 2019 · Apt 4B
Close - Heat/hot water
Entire building
Nov 1, 2019 · Apt 4B
Close - Heat/hot water
Apartment only
Jan 15, 2019 · Apt 2C
Close - Heat/hot water
Entire building
Jan 7, 2019 · Apt 4B
Close - Heat/hot water
Entire building
Jan 6, 2019 · Apt 4B
Close - Heat/hot water
Apartment only
Dec 16, 2016 · Apt 3B
Close - Heat/hot water
Entire building
Dec 16, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 9, 2016 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 7, 2016 · Apt 1
Close - Water leak
Heavy flow
Oct 5, 2016 · Apt 1B
Close - Water leak
Slow leak
Oct 5, 2016 · Apt 1B
Close - Paint/plaster
Ceiling
Oct 5, 2016 · Apt 1B
Close - Heat/hot water
Entire building
Nov 13, 2015 · Apt 4B
Close - Heat/hot water
Apartment only
Oct 20, 2015 · Apt 3B
Close - Flooring/stairs
Floor
Feb 23, 2015 · Apt 3D
Close - Heat/hot water
Apartment only
Feb 7, 2015 · Apt 3D
Close - Unsanitary condition
Pests
Jan 2, 2015 · Apt 3D
Close - Door/window
Window frame
Aug 19, 2014 · Apt 3D
Close - Unsanitary condition
Garbage/recycling storage
Aug 19, 2014 · Apt 3D
Close - Flooring/stairs
Floor
Aug 19, 2014 · Apt 3D
Close - Paint/plaster
Wall
Aug 19, 2014 · Apt 3D
Close - Water leak
Slow leak
Aug 19, 2014 · Apt 3D
Close - Unsanitary condition
Mold
Aug 19, 2014 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1925
- Floors
- 5
- Residential units
- 22
- Building area
- 21,580 ft²
- Lot area
- 5,244 ft²
- Zoning
- R5
- Community board
- 211
- Council district
- 13
- Block / lot
- 4019 / 1
- Assessed value
- $398,250
- Landmark / historic district
- No
HPD registration #200842, last renewed Aug 27, 2025.
Questions about 1750 Van Buren Street
Who owns 1750 Van Buren Street?
The owner of record in NYC Department of City Planning PLUTO data is 1750-51 Vanburen 520 Morris Pk Etal.
Does 1750 Van Buren Street have violations?
Yes. NYC HPD has recorded 57 housing violations at this property.
Is 1750 Van Buren Street rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1750 Van Buren Street built?
City records list 1925 as the year it was built.
How many apartments are in 1750 Van Buren Street?
It has 22 residential units and 24 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.