1160 Lebanon Street
Bronx, NY 10460BBL 2-04007-7501Map
Owner of record: Unavailable Owner
1160 Lebanon Street is a condominium built in 2013 in Bronx, 10460. It has 105 residential units across 8 floors. The owner of record is Unavailable Owner. HPD has recorded 33 housing violations here, most recently on August 21, 2026. 9 of the 33 most recent violations are still open. City tax records listed 105 rent-stabilized apartments here in 2024.
- HPD violations
- 33
- DOB violations
- 5
- ECB violations
- 9
- HPD complaints
- 151
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 33
- BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling and north wall in the 1st room from north located at apt 9c, 9th story, 3rd apartment from west at north
Aug 21, 2026 · Apt 9C
Open — Violation will be reinspected - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 1st room from north located at apt 9c, 9th story, 3rd apartment from west at north
Aug 21, 2026 · Apt 9C
Open — Violation will be reinspected - BHazardous
M/d law abate the nuisance consisting of vinyl floor tiles(lifting)creating potential hazard in the 1st room from east at north located at apt 6a, 6th story, 1st apartment from west at north
Feb 28, 2026 · Apt 6A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective electrical light switch at north wall in the private hallway located at apt 6a, 6th story, 1st apartment from west at north
Feb 28, 2026 · Apt 6A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at fire door (''a'' stair) at public hall, 1st story
Feb 11, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at fire door (''a'' stair) at public hall, 1st story
Feb 11, 2026
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door (''a'' stair) at public hall, 6th story
Dec 9, 2025
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at fire door (''b'' stair) at public hall, 6th story
Dec 9, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective mechanical air vent at ceiling in the kitchen located at apt 2f, 2nd story, 2nd apartment from west at north
Nov 11, 2024 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical air vent at ceiling in the bathroom located at apt 2f, 2nd story, 2nd apartment from west at north
Nov 11, 2024 · Apt 2F
Open — Nov sent out
Show 23 more ↓
- ANon-hazardous
Cleanse to the satisfaction of this department the floor at public hall, 5th story
Aug 30, 2024
Closed — Violation closed - ANon-hazardous
Cleanse to the satisfaction of this department the floor at compactor closet, 5th story
Aug 30, 2024
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 5th story
Aug 30, 2024
Open — Defect letter issued - ANon-hazardous
Properly repair the broken or defective bell/buzzer/intercom return system from building front to apartment 1a in the entire apartment located at apt 1a, 401st story, 1st apartment from south at west
Oct 1, 2022 · Apt 1A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 8d, 8th story, 4th apartment from east at south
Apr 27, 2022 · Apt 8D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 2nd room from east located at apt 8d, 8th story, 4th apartment from east at south
Apr 27, 2022 · Apt 8D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 8d, 8th story, 4th apartment from east at south
Apr 27, 2022 · Apt 8D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the 4th room from east located at apt 8d, 8th story, 4th apartment from east at south
Apr 27, 2022 · Apt 8D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8d, 8th story, 4th apartment from east at south
Apr 27, 2022 · Apt 8D
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors .. in the entrance located at apt 5d, 5th story, 3rd apartment from east at south
Jul 2, 2019 · Apt 5D
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 26, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame is too high and inaccessible to inspector at lobby, 1st story
May 7, 2018
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 7g, 7th story, 1st apartment from south at west
Jul 18, 2017 · Apt 7G
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above the ceiling in the 1st room from north located at apt 7g, 7th story, 1st apartment from south at west
Jul 18, 2017 · Apt 7G
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north located at apt 7g, 7th story, 1st apartment from south at west
Jul 18, 2017 · Apt 7G
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak above the ceiling in the 2nd room from north located at apt 7g, 7th story, 1st apartment from south at west
Jul 18, 2017 · Apt 7G
Closed — Violation closed - BHazardous
Properly repair the broken or defective counter balance at window lower sash in the 1st room from east at south located at apt 5d, 5th story, 3rd apartment from east at south
Jun 27, 2017 · Apt 5D
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of a double cyclinder lock at exit door to rear yard at public hall, 1st story
Jun 27, 2017
Closed — Violation closed - ANon-hazardous
Replace with new the missing safety electtrical outlet covers at all stories at public hall
Jun 27, 2017
Closed — Violation closed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system ... missing at public hall, 1st story
Jun 27, 2017
Closed — Violation closed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Jun 27, 2017
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jun 4, 2015
Closed — Violation dismissed
DOB building violations · 5
- Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 16, 2023
Dob violation - active - Hazardous condition (facade) facade required
Cycle 9b unsafe report filed
Feb 16, 2023
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Mar 16, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed
ECB violations · 9
- Class - 2
Failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28-302.5 for control #918581. agg1: prior nov 37026795z under 28-302
Apr 20, 2026 · Penalty $10,000
Active - Class - 2
Pedestrian protection does not meet code specifications. noted: observed sidewalk shed missing two parapet panels. panels fell off of shed injuring pedestrian, pedestrian was taken to local hospital by ems., co
Oct 24, 2024
Resolve - Class - 2
Pedestrican protection does not meet code specifications. noted: overhead protection/sidewalk shed not erected as per sidewalk causing resulting in 2 parapet panels dislodged and fallen onto sidewalk causing an
Oct 24, 2024
Resolve - Class - 2
Failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28.302.5 for control #918581. remedy: file acceptable report.
Jan 16, 2024 · Penalty $1,250
Active - Class - 2
Failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28.302.5 for control #917633. remedy: file acceptable report.
Jan 16, 2024 · Penalty $6,250
Active - Class - 2
Failure to maintain exterior bldg facade & appurtenances. note: at time of inspection observed at exp#1&2 loss metal coping. exp#4 cracked horizontal concrete bands. sidewalk shed observed at exp#1,did not have
Feb 7, 2022 · Penalty $3,125
Resolve - Class - 1
Failure to take required measures to secure public safety-unsafe facade.note:qewi stated that unsafe conditions were discovered on exterior walls on his unsafe notification filing917633-9b-001.shed in place on
Dec 13, 2021 · Penalty $12,500
Resolve - Class - 2
Failure to comply with the commisisoners order contained in summons.violtaion #39005955z issued on 07-19-2019 and to file a certification of correction pursuant to 28-201.1 and 1rcny 102-01 comply with commissi
Jan 2, 2020
Resolve - Class - 1
Failure to provide unobstructed exit passageway. at time of inspection observed a rear of building door leading to safe refuge and exit for 2 stairwells found key locked with building actively occupied., remove
Jul 19, 2019
Resolve
Complaints
- Heat/hot water
Apartment only
Oct 23, 2026 · Apt 2F
Open - Unsanitary condition
Pests
Oct 11, 2026 · Apt 6F
Open - Heat/hot water
Entire building
Aug 24, 2026 · Apt BLDG
Close - Water leak
Slow leak
Aug 23, 2026 · Apt 10H
Close - Heat/hot water
Apartment only
Aug 21, 2026 · Apt 9C
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 9C
Close - Heat/hot water
Entire building
Jun 5, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 5, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 6A
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Apartment only
Mar 2, 2026 · Apt 9C
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 6A
Close - Electric
Power outage
Feb 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 26, 2026 · Apt 9C
Close - Heat/hot water
Apartment only
Feb 24, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 2F
Close - Plumbing
Radiator
Feb 10, 2026 · Apt 2F
Close - Plumbing
Radiator
Feb 8, 2026 · Apt 2F
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt 2F
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Appliance
Refrigerator
Jan 7, 2026 · Apt 6A
Close - Flooring/stairs
Floor
Jan 7, 2026 · Apt 6A
Close - Door/window
Window frame
Jan 7, 2026 · Apt 6A
Close - Water leak
Heavy flow
Jan 7, 2026 · Apt 6A
Close - Paint/plaster
Wall
Jan 7, 2026 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 9C
Close - Door/window
Window frame
Dec 5, 2025 · Apt 6A
Close - Door/window
Window frame
Dec 5, 2025 · Apt 6A
Close - Appliance
Refrigerator
Dec 5, 2025 · Apt 6A
Close - Flooring/stairs
Floor
Dec 5, 2025 · Apt 6A
Close - Flooring/stairs
Floor
Dec 3, 2025 · Apt 6A
Close - Appliance
Refrigerator
Dec 3, 2025 · Apt 6A
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 19, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Oct 19, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Oct 18, 2025 · Apt 2F
Close - Heat/hot water
Apartment only
Oct 17, 2025 · Apt 2F
Close - Heat/hot water
Entire building
Oct 17, 2025 · Apt 6G
Close - Unsanitary condition
Garbage/recycling storage
Aug 17, 2025 · Apt BLDG
Close - General
Signage missing
Aug 17, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2025 · Apt 6A
Close - Flooring/stairs
Floor
Jul 2, 2025 · Apt 6A
Close - Paint/plaster
Wall
Jul 2, 2025 · Apt 6A
Close - Door/window
Door
Jul 2, 2025 · Apt 6A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Condominium (RM)
- Year built
- 2013
- Floors
- 8
- Residential units
- 105
- Building area
- 138,883 ft²
- Lot area
- 25,213 ft²
- Zoning
- M1-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 4007 / 7501
- Assessed value
- $6,550,200
- Landmark / historic district
- No
HPD registration #227237, last renewed Mar 5, 2026.
Questions about 1160 Lebanon Street
Who owns 1160 Lebanon Street?
The owner of record in NYC Department of City Planning PLUTO data is Unavailable Owner.
Does 1160 Lebanon Street have violations?
Yes. NYC HPD has recorded 33 housing violations at this property.
Is 1160 Lebanon Street rent stabilized?
NYC Department of Finance tax bills listed 105 rent-stabilized units here in 2024 (about 100% of its 105 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1160 Lebanon Street built?
City records list 2013 as the year it was built.
How many apartments are in 1160 Lebanon Street?
It has 105 residential units and 106 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.