roofy

1640 Overing Street

Bronx, NY 10461BBL 2-04002-0038Map

Owner of record: Overing Properties INC

1640 Overing Street is a walk-up apartment building built in 1913 in Bronx, 10461. It has 25 residential units across 5 floors. The owner of record is Overing Properties INC. HPD has recorded 87 housing violations here, most recently on September 2, 2026. 19 of the 50 most recent violations are still open. City tax records listed 25 rent-stabilized apartments here in 2024.

HPD violations
87
DOB violations
3
ECB violations
9
HPD complaints
129

What to know

Concern
8 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 2, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
25
About 100% of the building's 25 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 87

  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from south at west wall in the 1st room from north at west located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Violation will be reinspected
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from south at west wall in the bathroom located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Violation will be reinspected
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the foyer located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Violation will be reinspected
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at west located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective porcelain finish at bathtub in the bathroom located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at south wall in the foyer located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • A

    Paint metal in accordance with dept. regulation at 1st door from east at south wall, 1st door frame from east at south wall in the foyer located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling in the foyer located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the foyer located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at south wall, north wall, west wall in the bathroom located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
Show 40 more ↓
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the 1st room from north at west located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from south at west wall, west wall in the 1st room from north at west located at apt 42, 4th story, 1st apartment from west at north

    Sep 2, 2026 · Apt 42

    Open — Civ14 mailed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 2, 2026

    Open — Nov certified on time
  • A

    Paint with light colored paint to the satisfaction of this department at north wall in the intermediate landing , 4th story

    May 7, 2024

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at north wall in the intermediate landing , 4th story

    May 7, 2024

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 53, 5th story, 2nd apartment from west at north

    Apr 23, 2024 · Apt 53

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 53, 5th story, 2nd apartment from west at north

    Apr 23, 2024 · Apt 53

    Closed — Violation dismissed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Apr 23, 2024

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at roof door at 1st public hall bulkhead from north, 5th story

    Apr 23, 2024

    Closed — Violation closed
  • C

    Remove the illegal fastening consisting of a panic bar installed on roof door that does not allowed re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story

    Apr 23, 2024

    Closed — Violation dismissed
  • C

    Properly secure the loose 18th marble tread at from bottom (creating trip hazard) leadind to roof at 1st public hall bulkhead from north, 5th story

    Apr 23, 2024

    Closed — Violation dismissed
  • B

    Provide an unlockable slide bolt or hook on roof door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 5th story

    Apr 23, 2024

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Open — First no access to re- inspect violation
  • C

    Trace and repair the source and abate the visible mold condition... approx (35) sq ft at north wall in the 2nd room from east located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Open — First no access to re- inspect violation
  • B

    Trace and repair the source and abate the visible mold condition... approx (10) sq ft at east wall in the 2nd room from east located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Open — First no access to re- inspect violation
  • C

    Trace and repair the source and abate the visible mold condition... approx (35) sq ft at north wall in the 1st room from east located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Open — First no access to re- inspect violation
  • C

    Trace and repair the source and abate the visible mold condition... approx (30) sq ft at west wall in the bathroom located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Open — First no access to re- inspect violation
  • C

    Trace and repair the source and abate the visible mold condition... approx (35) sq ft at north wall in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Open — First no access to re- inspect violation
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the 1st room from east, the 2nd room from east, the bathroom located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Closed — Violation dismissed
  • B

    Repair the roof so that it will not leak at ceiling in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from south at west wall in the kitchen located at apt 53, 5th story, 2nd apartment from west at north

    Feb 7, 2024 · Apt 53

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, east wall, and north wall in the 1st room from east located at apt 30, 3rd story, 1st apartment from north at east

    Feb 1, 2024 · Apt 30

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 30, 3rd story, 1st apartment from north at east

    Feb 1, 2024 · Apt 30

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Jan 8, 2024

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 21, 2nd story, 1st apartment from south at west

    Jan 8, 2024 · Apt 21

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 21, 2nd story, 1st apartment from south at west

    Jan 8, 2024 · Apt 21

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 21, 2nd story, 1st apartment from south at west

    Jan 8, 2024 · Apt 21

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish at bathtub by method of reglazing in the bathroom located at apt 21, 2nd story, 1st apartment from south at west

    Jan 8, 2024 · Apt 21

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 21, 2nd story, 1st apartment from south at west

    Jan 8, 2024 · Apt 21

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 1st story, 1st apartment from east at south

    Dec 24, 2023 · Apt 10

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Dec 24, 2023

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 10, 1st story, 1st apartment from east at south

    Dec 24, 2023 · Apt 10

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 10, 1st story, 1st apartment from east at south

    Dec 24, 2023 · Apt 10

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective building entrance door lock and assembly from street at public hall, 1st story

    Dec 24, 2023

    Closed — Violation dismissed
  • I

    And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.

    Nov 16, 2023

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 54, 5th story, 1st apartment from west at north

    Jun 29, 2023 · Apt 54

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective porcelain enamel finish by method of reglazing in the bathroom located at apt 54, 5th story, 1st apartment from west at north

    Jun 29, 2023 · Apt 54

    Closed — Violation dismissed

DOB building violations · 3

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 9

  • Class - 1

    At time of inspection observed electromagnetic locking mechanism requiring motion activation to allow door lock to release and exit premises. remedy: repair and/or replace.

    Aug 19, 2026 · Penalty $2,500

    Active
  • Class - 2

    Observed in commercial space where puppies are sold there is no active sprinkler system in place. fire alarm system key pad is not working and not active at time of inspection., provide a system of automatic sp

    Apr 23, 2024 · Penalty $1,250

    Active
  • Non-hazardous

    Having installed awnings w/out a permit. 4 awnings. 1.rino hair salon. 1. flower connection. 1. 200-rama inc. 1- tri country pest control. remedy: remove illegal work awnings

    May 9, 2003 · Penalty $400

    Active
  • Non-hazardous

    Having awning signage not limited to the name and address of the establishment. having awning signage w/a surface area exceeding 12 sq ft. (tri country pest control) remedy: remove illegal signage

    May 9, 2003 · Penalty $400

    Active
  • Non-hazardous

    Having an illuminated awning sign. having awning signage not limited to the name and address of the establishment. having awning signage w/ a surface area exceeding 12 sq ft. having awning signage w/letters hig

    May 9, 2003 · Penalty $400

    Active
  • Non-hazardous

    Having awning signage not limited to the name and address of the establishment. having awning signage w/a surface area exceeding 12 sq ft. having awning signage w/letters higher than 12 in. remedy: remove illeg

    May 9, 2003 · Penalty $400

    Active
  • Non-hazardous

    Having awning signage not limited to the name and address of the establishment. having awning signage w/a surface area exceeding 12 sq ft. remedy: remove illegal work/signage.

    May 9, 2003 · Penalty $400

    Active
  • Non-hazardous

    Having an illuminated sign larger than 8 sq ft in a windows in c district. remedy: remove illegal work/signage

    May 9, 2003 · Penalty $400

    Active
  • Non-hazardous

    Work does not conforms to apprved plans.non conforming work noted;appl#200240097(alt).exhault duct that commences from front of bldg and ends at rear court yard thru exterior wall with a louver.approved plans s

    Jan 10, 1995

    Resolve

Complaints

  • Appliance

    Refrigerator

    Aug 24, 2026 · Apt 42

    Close
  • Paint/plaster

    Ceiling

    Aug 24, 2026 · Apt 42

    Close
  • Unsanitary condition

    Mold

    Aug 24, 2026 · Apt 42

    Close
  • Appliance

    Electric/gas range

    Aug 24, 2026 · Apt 42

    Close
  • Plumbing

    Bathtub/shower

    Aug 24, 2026 · Apt 42

    Close
  • Unsanitary condition

    Pests

    Mar 29, 2026 · Apt 20

    Close
  • Paint/plaster

    Wall

    Mar 29, 2026 · Apt 20

    Close
  • Plumbing

    Toilet

    Aug 23, 2025 · Apt 23

    Close
  • Plumbing

    Basin/sink

    Aug 23, 2025 · Apt 23

    Close
  • Heat/hot water

    Apartment only

    Feb 6, 2025 · Apt 54

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Dec 18, 2024 · Apt 50

    Close
  • Paint/plaster

    Ceiling

    Dec 18, 2024 · Apt 50

    Close
  • Door/window

    Window frame

    Dec 18, 2024 · Apt 50

    Close
  • Unsanitary condition

    Mold

    Dec 18, 2024 · Apt 50

    Close
  • Unsanitary condition

    Mold

    May 22, 2024 · Apt 30

    Close
  • Water leak

    Heavy flow

    May 22, 2024 · Apt 30

    Close
  • Paint/plaster

    Ceiling

    Jan 29, 2024 · Apt 30

    Close
  • Heat/hot water

    Apartment only

    Jan 29, 2024 · Apt 30

    Close
  • Paint/plaster

    Ceiling

    Jan 29, 2024 · Apt 30

    Close
  • Heat/hot water

    Entire building

    Jan 28, 2024 · Apt 30

    Close
  • Water leak

    Damp spot

    Jan 28, 2024 · Apt 30

    Close
  • Unsanitary condition

    Mold

    Jan 28, 2024 · Apt 30

    Close
  • Paint/plaster

    Ceiling

    Jan 28, 2024 · Apt 30

    Close
  • Flooring/stairs

    Floor

    Jan 27, 2024 · Apt 53

    Close
  • Flooring/stairs

    Floor

    Jan 27, 2024 · Apt 53

    Close
  • Paint/plaster

    Wall

    Jan 27, 2024 · Apt 53

    Close
  • Door/window

    Window frame

    Jan 27, 2024 · Apt 53

    Close
  • Paint/plaster

    Wall

    Jan 27, 2024 · Apt 53

    Close
  • Unsanitary condition

    Mold

    Jan 27, 2024 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 6, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 27, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 26, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 21, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2023 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Jun 22, 2023 · Apt 54

    Close
  • Plumbing

    Bathtub/shower

    Jun 22, 2023 · Apt 54

    Close
  • Unsanitary condition

    Mold

    Jun 22, 2023 · Apt 54

    Close
  • Water leak

    Heavy flow

    Jan 2, 2023 · Apt 10

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 15, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 12, 2022 · Apt 54

    Close
  • General

    Mailbox

    Nov 29, 2022 · Apt 10

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1913
Floors
5
Residential units
25
Building area
20,985 ft²
Lot area
4,341 ft²
Zoning
R6
Community board
210
Council district
18
Block / lot
4002 / 38
Assessed value
$577,800
Landmark / historic district
No

HPD registration #202340, last renewed Jul 18, 2025.

Questions about 1640 Overing Street

Who owns 1640 Overing Street?

The owner of record in NYC Department of City Planning PLUTO data is Overing Properties INC.

Does 1640 Overing Street have violations?

Yes. NYC HPD has recorded 87 housing violations at this property.

Is 1640 Overing Street rent stabilized?

NYC Department of Finance tax bills listed 25 rent-stabilized units here in 2024 (about 100% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1640 Overing Street built?

City records list 1913 as the year it was built.

How many apartments are in 1640 Overing Street?

It has 25 residential units and 31 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.