2450 Fuller Street
Bronx, NY 10461BBL 2-03996-0038Map
Owner of record: 2450 Fuller LLC
2450 Fuller Street is a walk-up apartment building built in 1927 in Bronx, 10461. It has 16 residential units across 4 floors. The owner of record is 2450 Fuller LLC. HPD has recorded 130 housing violations here, most recently on July 1, 2026. 47 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 130
- DOB violations
- 3
- ECB violations
- 0
- HPD complaints
- 142
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 130
- CImmediately hazardous
Properly repair or replace the broken or defective latch aad assembly at door (leading to 1st story public hall from vestibule) , 1st story
Jul 1, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door (leading to 1st story public hall from vestibule) , 1st story
Jul 1, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement flashing at south exterior wall
Jul 1, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the 2nd room from east located at apt 4a, 4th story, 1st apartment from south at west
Jun 22, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the private hallway located at apt 4a, 4th story, 1st apartment from south at west
Jun 22, 2026 · Apt 4A
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 1st fire escape from east at north, 3rd story
Jun 19, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west
Jun 19, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 3rd and 4th story balconies at north exterior wall building front (flower pots) at fire escape
Jun 7, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch at building entrance door at public hall, 1st story
Jun 7, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall in the foyer located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than (10) sq ft at south wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall in the 2nd room from north located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the kitchen located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the foyer located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, 1st closet from west at north wall door frame, north wall, south wall, east wall, west wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash glass at the 1st window from east at south in the bathroom located at apt .4a, 4th story
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash spring balance at the 2nd window from north at east in the 2nd room from north located at apt .4a, 4th story
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, 1st window frame from south at west wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame in the private hallway located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, north wall, west wall, 1st window frame from east at south wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the private hallway located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, west wall in the 2nd room from north located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt .4a, 4th story
Oct 24, 2025 · Apt .4A
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south
Oct 24, 2025 · Apt .4A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.
Oct 20, 2025
Closed — Violation closed - BHazardous
Remove the illegal fastening consisting of a panic bar installed at roof door that does not allow re-entry from roof to public hall at 1st public hall bulkhead from north, 4th story
Oct 20, 2025
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken vinyl floor tiles in the private hallway located at apt 4a, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken vinyl floor tiles in the 2nd room from east located at apt 4a, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 4A
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of broken vinyl floor tiles in the foyer located at apt 4a, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Oct 20, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Provide an unlockable slidebolt or hook on roof door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 4th story
Oct 20, 2025
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Sep 15, 2025 · Apt 4A
Open — Violation will be reinspected - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls and ceiling throughout in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Sep 15, 2025 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all trims and doors throughout in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west
Sep 15, 2025 · Apt 4A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2d, 2nd story, 1st apartment from north at east
Jul 10, 2025 · Apt 2D
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3a, 3rd story, 1st apartment from east at south
Jul 10, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 3rd story, 1st apartment from north at east
Jul 10, 2025 · Apt 3D
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
May 20, 2025
Open — Nov sent out
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Paint/plaster
Ceiling
Jun 15, 2026 · Apt 4A
Close - Paint/plaster
Wall
Jun 15, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Jun 15, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Apr 20, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Apr 20, 2025 · Apt 4A
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt 4B
Close - Paint/plaster
Wall
Jul 8, 2024 · Apt 1B
Close - Flooring/stairs
Floor
Jul 8, 2024 · Apt 1B
Close - Unsanitary condition
Mold
Jul 8, 2024 · Apt 1B
Close
Show 40 more ↓
- Door/window
Window frame
Jul 8, 2024 · Apt 1B
Close - Heat/hot water
Apartment only
Jul 8, 2024 · Apt 1B
Close - Heat/hot water
Apartment only
Jun 20, 2024 · Apt 1B
Close - Heat/hot water
Apartment only
Jun 3, 2024 · Apt 1B
Close - Appliance
Electric/gas range
May 24, 2024 · Apt 1B
Close - Door/window
Window frame
May 24, 2024 · Apt 1B
Close - Paint/plaster
Wall
May 24, 2024 · Apt 1B
Close - Unsanitary condition
Mold
May 24, 2024 · Apt 1B
Close - Flooring/stairs
Floor
May 24, 2024 · Apt 1B
Close - Appliance
Electric/gas range
Feb 1, 2024 · Apt 1B
Close - Paint/plaster
Wall
Jan 20, 2024 · Apt 1B
Close - Door/window
Window frame
Jan 20, 2024 · Apt 1B
Close - Heat/hot water
Entire building
Jan 13, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2023 · Apt 4A
Close - Heat/hot water
Entire building
Dec 26, 2023 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 24, 2023 · Apt 4B
Close - Heat/hot water
Entire building
Dec 23, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 24, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 9, 2023 · Apt BLDG
Close - Unsanitary condition
Pests
May 16, 2023 · Apt 3C
Close - Paint/plaster
Wall
May 16, 2023 · Apt 3C
Close - Electric
Outlet/switch
May 16, 2023 · Apt 3C
Close - Plumbing
Bathtub/shower
May 16, 2023 · Apt 3C
Close - Flooring/stairs
Floor
May 16, 2023 · Apt 3C
Close - Paint/plaster
Window/frame
May 16, 2023 · Apt 3C
Close - Safety
Fire escape
May 16, 2023 · Apt 3C
Close - Paint/plaster
Wall
May 16, 2023 · Apt 3C
Close - Unsanitary condition
Mold
May 16, 2023 · Apt 3C
Close - Water leak
Heavy flow
May 16, 2023 · Apt 3C
Close - Door/window
Window frame
May 16, 2023 · Apt 3C
Close - Plumbing
Toilet
Dec 19, 2022 · Apt 2B
Close - Heat/hot water
Apartment only
Dec 19, 2022 · Apt 2B
Close - Paint/plaster
Wall
Dec 13, 2022 · Apt 4A
Close - Water leak
Heavy flow
Dec 13, 2022 · Apt 4A
Close - Heat/hot water
Apartment only
Dec 13, 2022 · Apt 4A
Close - Heat/hot water
Apartment only
Nov 15, 2022 · Apt 4A
Close - Water leak
Heavy flow
Aug 22, 2021 · Apt 4A
Close - Water leak
Slow leak
Jul 16, 2020 · Apt 4B
Close - Heat/hot water
Entire building
Dec 10, 2018 · Apt 4B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 16
- Building area
- 13,680 ft²
- Lot area
- 3,245 ft²
- Zoning
- R6
- Community board
- 210
- Council district
- 18
- Block / lot
- 3996 / 38
- Assessed value
- $435,600
- Landmark / historic district
- No
HPD registration #207418, last renewed Aug 24, 2025.
Questions about 2450 Fuller Street
Who owns 2450 Fuller Street?
The owner of record in NYC Department of City Planning PLUTO data is 2450 Fuller LLC.
Does 2450 Fuller Street have violations?
Yes. NYC HPD has recorded 130 housing violations at this property.
Is 2450 Fuller Street rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2450 Fuller Street built?
City records list 1927 as the year it was built.
How many apartments are in 2450 Fuller Street?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.