roofy

2450 Fuller Street

Bronx, NY 10461BBL 2-03996-0038Map

Owner of record: 2450 Fuller LLC

2450 Fuller Street is a walk-up apartment building built in 1927 in Bronx, 10461. It has 16 residential units across 4 floors. The owner of record is 2450 Fuller LLC. HPD has recorded 130 housing violations here, most recently on July 1, 2026. 47 of the 50 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.

HPD violations
130
DOB violations
3
ECB violations
0
HPD complaints
142

What to know

Concern
17 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 1, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
16
About 100% of the building's 16 apartments
Up from 15 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 130

  • C

    Properly repair or replace the broken or defective latch aad assembly at door (leading to 1st story public hall from vestibule) , 1st story

    Jul 1, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door (leading to 1st story public hall from vestibule) , 1st story

    Jul 1, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective cement flashing at south exterior wall

    Jul 1, 2026

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the 2nd room from east located at apt 4a, 4th story, 1st apartment from south at west

    Jun 22, 2026 · Apt 4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the private hallway located at apt 4a, 4th story, 1st apartment from south at west

    Jun 22, 2026 · Apt 4A

    Open — Nov sent out
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes consisting of household items at 1st fire escape from east at north, 3rd story

    Jun 19, 2026

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling in the bathroom located at apt 4a, 4th story, 1st apartment from south at west

    Jun 19, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes 3rd and 4th story balconies at north exterior wall building front (flower pots) at fire escape

    Jun 7, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch at building entrance door at public hall, 1st story

    Jun 7, 2026

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the foyer located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall in the foyer located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... more than (10) sq ft at south wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the private hallway located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall in the 2nd room from north located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the kitchen located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) west wall in the foyer located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall in the foyer located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at east wall, 1st closet from west at north wall door frame, north wall, south wall, east wall, west wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective upper sash glass at the 1st window from east at south in the bathroom located at apt .4a, 4th story

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective upper sash spring balance at the 2nd window from north at east in the 2nd room from north located at apt .4a, 4th story

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st radiator from east at south wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from east at south wall, 1st window frame from south at west wall in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the private hallway located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st closet from north at east wall door frame in the private hallway located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department at 1st window frame from north at east wall, 2nd window frame from north at east wall in the 2nd room from north located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation at 1st riser from north at east wall in the kitchen located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, north wall, west wall, 1st window frame from east at south wall in the bathroom located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, west wall in the private hallway located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, west wall in the 2nd room from north located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt .4a, 4th story

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling in the 3rd room from north at west located at apt .4a, 4th story, 1st apartment from east at south

    Oct 24, 2025 · Apt .4A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) throughout the public areas in accordance with the specifications of the new york city health code section 24 rcny chapter 12.

    Oct 20, 2025

    Closed — Violation closed
  • B

    Remove the illegal fastening consisting of a panic bar installed at roof door that does not allow re-entry from roof to public hall at 1st public hall bulkhead from north, 4th story

    Oct 20, 2025

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of broken vinyl floor tiles in the private hallway located at apt 4a, 4th story, 1st apartment from south at west

    Oct 20, 2025 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of broken vinyl floor tiles in the 2nd room from east located at apt 4a, 4th story, 1st apartment from south at west

    Oct 20, 2025 · Apt 4A

    Open — Nov sent out
  • B

    M/d law abate the nuisance consisting of broken vinyl floor tiles in the foyer located at apt 4a, 4th story, 1st apartment from south at west

    Oct 20, 2025 · Apt 4A

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Oct 20, 2025 · Apt 4A

    Open — Nov sent out
  • B

    Provide an unlockable slidebolt or hook on roof door that allows re-entry from roof to public hall at 1st public hall bulkhead from north, 4th story

    Oct 20, 2025

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Sep 15, 2025 · Apt 4A

    Open — Violation will be reinspected
  • A

    Paint with light colored paint to the satisfaction of this department at all walls and ceiling throughout in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Sep 15, 2025 · Apt 4A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all trims and doors throughout in the entire apartment located at apt 4a, 4th story, 1st apartment from south at west

    Sep 15, 2025 · Apt 4A

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2d, 2nd story, 1st apartment from north at east

    Jul 10, 2025 · Apt 2D

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3a, 3rd story, 1st apartment from east at south

    Jul 10, 2025 · Apt 3A

    Open — Nov sent out
  • B

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 3d, 3rd story, 1st apartment from north at east

    Jul 10, 2025 · Apt 3D

    Open — Nov sent out
  • C

    Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.

    May 20, 2025

    Open — Nov sent out

DOB building violations · 3

  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 13, 2004

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed

ECB violations · 0

No ECB violations on record

Complaints

  • Paint/plaster

    Ceiling

    Jun 15, 2026 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Jun 15, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Jun 15, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Apr 20, 2025 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Apr 20, 2025 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jan 22, 2025 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Dec 4, 2024 · Apt 4B

    Close
  • Paint/plaster

    Wall

    Jul 8, 2024 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    Jul 8, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    Jul 8, 2024 · Apt 1B

    Close
Show 40 more ↓
  • Door/window

    Window frame

    Jul 8, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jul 8, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jun 20, 2024 · Apt 1B

    Close
  • Heat/hot water

    Apartment only

    Jun 3, 2024 · Apt 1B

    Close
  • Appliance

    Electric/gas range

    May 24, 2024 · Apt 1B

    Close
  • Door/window

    Window frame

    May 24, 2024 · Apt 1B

    Close
  • Paint/plaster

    Wall

    May 24, 2024 · Apt 1B

    Close
  • Unsanitary condition

    Mold

    May 24, 2024 · Apt 1B

    Close
  • Flooring/stairs

    Floor

    May 24, 2024 · Apt 1B

    Close
  • Appliance

    Electric/gas range

    Feb 1, 2024 · Apt 1B

    Close
  • Paint/plaster

    Wall

    Jan 20, 2024 · Apt 1B

    Close
  • Door/window

    Window frame

    Jan 20, 2024 · Apt 1B

    Close
  • Heat/hot water

    Entire building

    Jan 13, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2023 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Dec 24, 2023 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jun 9, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    May 16, 2023 · Apt 3C

    Close
  • Paint/plaster

    Wall

    May 16, 2023 · Apt 3C

    Close
  • Electric

    Outlet/switch

    May 16, 2023 · Apt 3C

    Close
  • Plumbing

    Bathtub/shower

    May 16, 2023 · Apt 3C

    Close
  • Flooring/stairs

    Floor

    May 16, 2023 · Apt 3C

    Close
  • Paint/plaster

    Window/frame

    May 16, 2023 · Apt 3C

    Close
  • Safety

    Fire escape

    May 16, 2023 · Apt 3C

    Close
  • Paint/plaster

    Wall

    May 16, 2023 · Apt 3C

    Close
  • Unsanitary condition

    Mold

    May 16, 2023 · Apt 3C

    Close
  • Water leak

    Heavy flow

    May 16, 2023 · Apt 3C

    Close
  • Door/window

    Window frame

    May 16, 2023 · Apt 3C

    Close
  • Plumbing

    Toilet

    Dec 19, 2022 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2022 · Apt 2B

    Close
  • Paint/plaster

    Wall

    Dec 13, 2022 · Apt 4A

    Close
  • Water leak

    Heavy flow

    Dec 13, 2022 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2022 · Apt 4A

    Close
  • Heat/hot water

    Apartment only

    Nov 15, 2022 · Apt 4A

    Close
  • Water leak

    Heavy flow

    Aug 22, 2021 · Apt 4A

    Close
  • Water leak

    Slow leak

    Jul 16, 2020 · Apt 4B

    Close
  • Heat/hot water

    Entire building

    Dec 10, 2018 · Apt 4B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1927
Floors
4
Residential units
16
Building area
13,680 ft²
Lot area
3,245 ft²
Zoning
R6
Community board
210
Council district
18
Block / lot
3996 / 38
Assessed value
$435,600
Landmark / historic district
No

HPD registration #207418, last renewed Aug 24, 2025.

Questions about 2450 Fuller Street

Who owns 2450 Fuller Street?

The owner of record in NYC Department of City Planning PLUTO data is 2450 Fuller LLC.

Does 2450 Fuller Street have violations?

Yes. NYC HPD has recorded 130 housing violations at this property.

Is 2450 Fuller Street rent stabilized?

NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2450 Fuller Street built?

City records list 1927 as the year it was built.

How many apartments are in 2450 Fuller Street?

It has 16 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.