roofy

63 Metropolitan Oval

Bronx, NY 10462BBL 2-03929-7501Map

Owner of record: Parkchester South Condominium Assoc

63 Metropolitan Oval is a condominium built in 1941 in Bronx, 10462. It has 128 residential units across 9 floors. The owner of record is Parkchester South Condominium Assoc. HPD has recorded 588 housing violations here, most recently on October 4, 2026. 33 of the 50 most recent violations are still open. City tax records listed 18 rent-stabilized apartments here in 2024.

HPD violations
588
DOB violations
34
ECB violations
22
HPD complaints
1,223

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 4, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
18
About 14% of the building's 128 apartments
Down from 24 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 588

  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft observed at ceiling at closet at south wall in the 1st room from north located at apt 7e, 8th story, 3rd apartment from north at east

    Oct 4, 2026 · Apt 7E

    Open — Notice of issuance sent to tenant
  • C

    Properly repair with similar material the broken or defective hardwood floor in the 3rd room from north located at apt 7e, 8th story, 3rd apartment from north at east

    Oct 4, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and closet at west wall in the private hallway located at apt 7e, 8th story, 3rd apartment from north at east

    Oct 4, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak at ceiling at closet at west wall in the private hallway located at apt 7e, 8th story, 3rd apartment from north at east

    Oct 4, 2026 · Apt 7E

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective bell buzzer intercom system from building vestibule door to the panel at west wall in the foyer located at apt 7e, 8th story, 3rd apartment from north at east

    Oct 4, 2026 · Apt 7E

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft observed east wall in the bathroom located at apt 7e, 8th story, 3rd apartment from north at east

    Oct 4, 2026 · Apt 7E

    Open — Notice of issuance sent to tenant
  • B

    Properly repair with similar material the broken or defective wood floor in the foyer located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective window lower sash spring balance in the kitchen located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color closet ceiling in the private hallway located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
Show 40 more ↓
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at east wall in the bathroom located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective base cabinet at south wall in the kitchen located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling at closet in the 4th room from east at south located at apt 7e, 7th story, 2nd apartment from north at east

    Sep 18, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Abate the infestation consisting of bedbugs in the entire apartment located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Civ14 mailed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, wall at west, wall at south in the private hallway located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • A

    Paint metal in accordance with dept. regulation radiator at north in the 2nd room from east located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, wall at west in the 2nd room from east located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Civ14 mailed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, wall at north, wall at south in the 3rd room from east at north located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective porcelain finish in bathtub in the bathroom located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at ceiling, north wall, 1st door from north at east, and 1st window frame from south at west in the bathroom located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Notice of issuance sent to tenant
  • A

    Cleanse to the satisfaction of this department the mold at tiled/grouted surfaces at south wall, west wall, north wall in the bathroom located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color wall at south in the foyer located at apt 5i, 6th story, 1st apartment from west at north

    Sep 10, 2026 · Apt 5I

    Open — Nov sent out
  • B

    Repair the roof so that it will not leak the ceiling inside the closet at west wall in the private hallway located at apt 7e, 8th story, 3rd apartment from north at east

    Aug 8, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 7e, 8th story, 3rd apartment from north at east

    Aug 8, 2026 · Apt 7E

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling inside the closet at west wall in the private hallway located at apt 7e, 8th story, 3rd apartment from north at east

    Aug 8, 2026 · Apt 7E

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 1st room from north at west located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak north wall, west wall, east wall and ceiling in the bathroom located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 3rd room from north located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Open — First no access to re- inspect violation
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from south at west wall in the 3rd room from north located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer , the private hallway located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Open — First no access to re- inspect violation
  • B

    Properly repair the source and abate the evidence of a water leak at west wall, south wall and ceiling in the 1st room from north at west located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective concrete at north wall in the bathroom located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • A

    Refit door at east in the 1st room from north at west located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 7, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • B

    Replace with new the missing ceramic tiles at floor in the kitchen located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from south at west wall in the 3rd room from north located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Open — Civ14 mailed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 3rd room from north located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective wood floor in the 3rd room from north located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Open — Nov sent out
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl : in the bathroom located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • A

    Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4b, 5th story, 1st apartment from west at north

    Jun 23, 2026 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south

    Jun 21, 2026 · Apt 4B

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south

    Jun 21, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south

    Jun 21, 2026 · Apt 4B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south

    Jun 21, 2026 · Apt 4B

    Closed — Violation dismissed
  • B

    Refit door in the 1st room from north located at apt 4b, 5th story, 1st apartment from east at south

    Jun 21, 2026 · Apt 4B

    Closed — Violation dismissed

DOB building violations · 34

  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2024

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2023

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 5, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 30, 2019

    Dob violation - resolved
  • Construction other optional

    C-construction other optional

    Oct 1, 2018

    Vp*-violation unserved ecb- dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 18, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 31, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 31, 2017

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
Show 24 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 30, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 30, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 3, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 9, 2012

    Dob violation - resolved
  • Facade facade optional

    Local law unsafe report was filed

    Feb 17, 2012

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 26, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 27, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 27, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 19, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 19, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 13, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 28, 2006

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 27, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 27, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 27, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 5, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 5, 2004

    Dob violation - resolved

ECB violations · 22

  • Class - 2

    At the time of inspection of a 8-story building, i observed sidewalk shed in place, during my inspection i noticed sidewalk shed has no building information panel. this create a hazardous situation for first re

    Aug 31, 2026 · Penalty $1,250

    Active
  • Class - 2

    Failure to maintain building in code-compliant manner. inspection time, observed, bedroom's portion of celling collapsed & inside rebar is exposed due to water damage of the wall in 7e apart. at 7th floor. also

    Feb 18, 2022

    Resolve
  • Class - 2

    Work without a permit: at time of inspection observed structural (frame) work, approximately 8ft in length by 6ft in width, in apt #7e living room ceiling with new plywood and 5 c channel beams note: job # 2206

    Oct 13, 2020 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #39002852m issued on 05-10-2019 and to file a certficiate of correction pursuant to 28-201.1 and 1rcny 102-01(d)(2). an acceptible c

    Apr 2, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Work does not conform to approved const docs &/or amendments.premises under alt2 job #220680136 loc folder.@time of insp found:approved planindicates grab bar @propsed new handicapped bathroom.observed grab bar

    Dec 26, 2019

    Resolve
  • Class - 2

    At the time of inspection noted horizontal cracks at premises apartment # 7e livingroom walls. , repair and/or replace

    May 10, 2019 · Penalty $625

    Resolve
  • Class - 1

    Improper storage on sidewalk shed. at the time of inspection observed a 8story existing building under facade and roof replacement work in progress. some worker was working.a lso observed piles of debris was

    Oct 1, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Electrical work without a permit.observed installed in basement of 1309 one new meter pan & one service disconnect switch complete with new wiring and conduits with fittings. remedy:obtain permit.

    Dec 26, 2017 · Penalty $800

    Resolve
  • Class - 2

    40p07,23x10,70o02 (23)hall button station not displayed and indicative floor of elevator

    Nov 23, 2016 · Penalty $2,500

    Resolve
  • Class - 2

    39o02,56y13,71x10,71q03,68b07: 68b07;provide updated maintenance log.

    Sep 4, 2012 · Penalty $2,500

    Resolve
Show 12 more ↓
  • Class - 2

    Approved place of assembly plans not available for insp pa #1/74 remedy: provide approved pa plans

    Sep 20, 2008 · Penalty $250

    Resolve
  • Non-hazardous

    Work w/o a permit. at cellar level a wood frame structure approx 16' x12' x 10' w/sheetrock on inside & vinyl siding on exterior is erected w/o permits. remedy: obtain permit or restore to legal condition.

    Mar 23, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    Approved p.a. plans not available for inspection p.a. #1/74 for 97 people permit expiring 6/12/08 premises d/b/a step-in restaurant/lounge. remedy: provide approved p.a. plans for inspection.

    Nov 4, 2007 · Penalty $200

    Resolve
  • Hazardous

    Licensed rigger failed to name a designated foreman or an unqualified foreman.no designated foreman on site @ time of inspection.cd-5"notification of use" & approved plans/drawings not on site/available for in

    Sep 5, 2007 · Penalty $750

    Resolve
  • Non-hazardous

    Work without a permit.created an opening kitchen and bar.rem:obtain a permit if feasible or restore premises to prior legal condition.

    Dec 11, 2000 · Penalty $500

    Resolve
  • Non-hazardous

    02b,75u,37r,29b,50h, 37-remove car button jumper 8cb-cby 29-excessive runby on cwt 50-gland packing.

    Sep 3, 1997 · Penalty $100

    Resolve
  • Non-hazardous

    20b 39h 46h 35# 54r 35 guardrail missing replace with another

    Oct 21, 1993 · Penalty $100

    Resolve
  • Non-hazardous

    73restore elevato to service

    Jul 14, 1993

    Resolve
  • Non-hazardous

    14m 57o 73x 74l 73 restore elevator to service 74 repair leak hydro system

    Jul 14, 1993

    Resolve
  • Non-hazardous

    08v;13m;

    Jun 7, 1991

    Resolve
  • Non-hazardous

    08v;28v;

    Jun 7, 1991

    Resolve
  • Non-hazardous

    Failure to obtain equipment use permit.unit mounted by east front rooflevel.1-inst. remedy:file plans and obtain approval and permit.

    Apr 8, 1991

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Sep 29, 2026 · Apt 7A

    Close
  • Flooring/stairs

    Floor

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Water leak

    Slow leak

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Appliance

    Refrigerator

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Door/window

    Window frame

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Plumbing

    Basin/sink

    Sep 26, 2026 · Apt 7EON7T

    Close
  • General

    Bell/buzzer/intercom

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Appliance

    Electric/gas range

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Unsanitary condition

    Mold

    Sep 26, 2026 · Apt 7EON7T

    Close
  • Plumbing

    Water supply

    Aug 31, 2026 · Apt 7E

    Close
Show 40 more ↓
  • Plumbing

    Basin/sink

    Aug 31, 2026 · Apt 7E

    Close
  • Water leak

    Slow leak

    Aug 31, 2026 · Apt 7E

    Close
  • Door/window

    Window frame

    Aug 31, 2026 · Apt 7E

    Close
  • Unsanitary condition

    Mold

    Aug 31, 2026 · Apt 7E

    Close
  • Paint/plaster

    Wall

    Aug 31, 2026 · Apt 7E

    Close
  • Paint/plaster

    Cabinet

    Aug 31, 2026 · Apt 7E

    Close
  • Appliance

    Electric/gas range

    Aug 31, 2026 · Apt 7E

    Close
  • Paint/plaster

    Wall

    Aug 31, 2026 · Apt 7E

    Close
  • Heat/hot water

    Entire building

    Aug 27, 2026 · Apt 7H

    Close
  • Flooring/stairs

    Floor

    Aug 24, 2026 · Apt 7E

    Close
  • Unsanitary condition

    Mold

    Aug 24, 2026 · Apt 7E

    Close
  • Door/window

    Door

    Aug 24, 2026 · Apt 7E

    Close
  • Water leak

    Heavy flow

    Aug 24, 2026 · Apt 7E

    Close
  • Appliance

    Electric/gas range

    Aug 24, 2026 · Apt 7E

    Close
  • Door/window

    Window pane

    Aug 24, 2026 · Apt 7E

    Close
  • General

    Cabinet

    Aug 24, 2026 · Apt 7E

    Close
  • Flooring/stairs

    Floor

    Aug 24, 2026 · Apt 7E

    Close
  • Paint/plaster

    Window/frame

    Aug 24, 2026 · Apt 7E

    Close
  • Unsanitary condition

    Mold

    Aug 24, 2026 · Apt 7E

    Close
  • Heat/hot water

    Entire building

    Aug 17, 2026 · Apt 5I

    Close
  • Unsanitary condition

    Pests

    Aug 14, 2026 · Apt 5I

    Close
  • Heat/hot water

    Apartment only

    Aug 14, 2026 · Apt 5I

    Close
  • Unsanitary condition

    Mold

    Aug 14, 2026 · Apt 5I

    Close
  • Paint/plaster

    Wall

    Aug 14, 2026 · Apt 5I

    Close
  • Paint/plaster

    Wall

    Aug 14, 2026 · Apt 5I

    Close
  • Appliance

    Refrigerator

    Aug 8, 2026 · Apt 7E

    Close
  • General

    Cabinet

    Aug 8, 2026 · Apt 7E

    Close
  • Safety

    Window guard broken/missing

    Aug 8, 2026 · Apt 7E

    Close
  • Water leak

    Slow leak

    Aug 8, 2026 · Apt 7E

    Close
  • Paint/plaster

    Window/frame

    Aug 8, 2026 · Apt 7E

    Close
  • Unsanitary condition

    Mold

    Aug 8, 2026 · Apt 7E

    Close
  • Plumbing

    Basin/sink

    Aug 8, 2026 · Apt 7E

    Close
  • Appliance

    Electric/gas range

    Aug 8, 2026 · Apt 7E

    Close
  • Unsanitary condition

    Mold

    Jul 16, 2026 · Apt 7E

    Close
  • Door/window

    Window frame

    Jul 16, 2026 · Apt 7E

    Close
  • Appliance

    Refrigerator

    Jul 16, 2026 · Apt 7E

    Close
  • Door/window

    Window frame

    Jul 16, 2026 · Apt 7E

    Close
  • Flooring/stairs

    Floor

    Jul 16, 2026 · Apt 7E

    Close
  • Water leak

    Slow leak

    Jul 16, 2026 · Apt 7E

    Close
  • Plumbing

    Bathtub/shower

    Jul 16, 2026 · Apt 7E

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Condominium (RM)
Year built
1941
Floors
9
Residential units
128
Building area
112,848 ft²
Lot area
3,309,242 ft²
Zoning
R6
Community board
209
Council district
18
Block / lot
3929 / 7501
Assessed value
$8,250,062
Landmark / historic district
No

HPD registration #223969, last renewed Nov 18, 2025.

Questions about 63 Metropolitan Oval

Who owns 63 Metropolitan Oval?

The owner of record in NYC Department of City Planning PLUTO data is Parkchester South Condominium Assoc.

Does 63 Metropolitan Oval have violations?

Yes. NYC HPD has recorded 588 housing violations at this property.

Is 63 Metropolitan Oval rent stabilized?

NYC Department of Finance tax bills listed 18 rent-stabilized units here in 2024 (about 14% of its 128 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 63 Metropolitan Oval built?

City records list 1941 as the year it was built.

How many apartments are in 63 Metropolitan Oval?

It has 128 residential units and 136 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.