1225 Stratford Avenue
Bronx, NY 10472BBL 2-03776-0066Map
Owner of record: Ann-Gur Rlty Cp
1225 Stratford Avenue is a walk-up apartment building built in 1927 in Bronx, 10472. It has 38 residential units across 4 floors. The owner of record is Ann-Gur Rlty Cp. HPD has recorded 437 housing violations here, most recently on September 11, 2026. 29 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.
- HPD violations
- 437
- DOB violations
- 2
- ECB violations
- 1
- HPD complaints
- 500
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 437
- CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage can recycle stored court
Sep 11, 2026
Open — Nov certified on time - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 11, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls in the kitchen located at apt 1a, 1st story, 1st apartment from north at east
Sep 2, 2026 · Apt 1A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling at private hallway, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall at 1st room from east at north, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ... at entrance, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at ... at entire apartment, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at west wall at bathroom, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash window glass pane at 1st room from east at north, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall at bathroom, 1st story, apartment
Sep 2, 2026 · Apt 1A
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the private hallway located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at north wall, 1st door frame from south at west wall in the foyer located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from east at south wall door, 1st closet from east at south wall door frame, 2nd closet from east at south wall door, 2nd closet from east at south wall door frame in the foyer located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from north at east located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at south wall in the 1st room from north at east located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, 1st closet from south at west wall door, 1st closet from south at west wall door frame, 2nd closet from south at west wall door frame, north wall, south wall, 1st window frame from north at east wall, 2nd window frame from north at east wall in the 1st room from north at east located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the private hallway located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective window pane at lower sash of 2nd window from north at east in the 1st room from north at east located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at ... in the entire apartment located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the private hallway located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, west wall, east wall, south wall, north wall in the foyer located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall, west wall in the 1st room from north at east located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at west wall in the private hallway located at apt a, 1st story, 1st apartment from north at east
Aug 21, 2026 · Apt A
Open — Certification postponment granted - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the rear yard
Jul 8, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door from street to public hall at public hall, 1st story
Jul 8, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch an it's assembily at door from street to vestibule at public hall, 1st story
Jul 8, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st story
Jun 26, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east , section ''north''
Jan 22, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 2nd room from east located at apt 1b, 2nd story, 1st apartment from north at east , section ''north''
Jan 22, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective rotted wood floor in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east , section ''north''
Jan 22, 2026 · Apt 1B
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east , section ''north''
Jan 22, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east , section ''north''
Jan 22, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 2nd story, 1st apartment from north at east , section ''north''
Jan 22, 2026 · Apt 1B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system boiler room door locked at boiler room
Dec 6, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective the hinges at door in the entrance located at apt 3e, 4th story, 1st apartment from south at west , section at north
Dec 6, 2025 · Apt 3E
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assemblies at room door in the 3rd room from east located at apt 3e, 4th story, 1st apartment from south at west , section at north
Dec 6, 2025 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Remove all obstructions and repair all defects in at waste drain at wash basin in the bathroom located at apt 3e, 4th story, 1st apartment from south at west , section at north
Dec 6, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sqft and less than 30sqft at ceiling in the bathroom located at apt 3e, 4th story, 1st apartment from south at west , section at north
Dec 6, 2025 · Apt 3E
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3e, 4th story, 1st apartment from south at west , section at north
Dec 6, 2025 · Apt 3E
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 18, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt a, 1st story, 1st apartment from north at east , section ''north''
Nov 13, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch in the entrance located at apt a, 1st story, 1st apartment from north at east , section ''north''
Nov 13, 2025 · Apt A
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub faucet in the bathroom located at apt a, 1st story, 1st apartment from north at east , section ''north''
Nov 13, 2025 · Apt A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and assemblies in the entrance located at apt a, 1st story, 1st apartment from north at east , section ''north''
Nov 13, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at rat droppings observed in the entire apartment located at apt a, 1st story, 1st apartment from north at east , section ''north''
Nov 13, 2025 · Apt A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt a, 1st story, 1st apartment from north at east , section ''north''
Nov 13, 2025 · Apt A
Closed — Violation dismissed
DOB building violations · 2
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active
ECB violations · 1
- Class - 2
Failure to maintain building walls or appurtenances.at the time of inspection i observed a piece of decorative concrete missing above 5th floor windows,building front exposure #1 walls.rem:maintain exterior bui
Mar 22, 2018 · Penalty $620
Resolve
Complaints
- Paint/plaster
Wall
Sep 1, 2026 · Apt 1A
Close - Door/window
Door
Sep 1, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Sep 1, 2026 · Apt 1A
Close - Paint/plaster
Ceiling
Sep 1, 2026 · Apt 1A
Close - Unsanitary condition
Garbage/recycling storage
Sep 1, 2026 · Apt 1A
Close - Door/window
Window frame
Sep 1, 2026 · Apt 1A
Close - Door/window
Door
Sep 1, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Aug 11, 2026 · Apt A
Close - Unsanitary condition
Pests
Aug 11, 2026 · Apt A
Close - Water leak
Slow leak
Aug 11, 2026 · Apt A
Close
Show 40 more ↓
- Unsanitary condition
Pests
Jul 21, 2026 · Apt A
Close - Paint/plaster
Wall
Jul 21, 2026 · Apt A
Close - Door/window
Door
Jul 21, 2026 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Jul 21, 2026 · Apt A
Close - Door/window
Window frame
Jul 21, 2026 · Apt A
Close - Door/window
Door frame
Jul 21, 2026 · Apt A
Close - Paint/plaster
Ceiling
Jul 21, 2026 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Jul 8, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 6, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt A
Close - Paint/plaster
Wall
Jun 22, 2026 · Apt A
Close - Door/window
Door
Jun 22, 2026 · Apt A
Close - Door/window
Window frame
Jun 22, 2026 · Apt A
Close - Paint/plaster
Wall
Jun 3, 2026 · Apt A
Close - Appliance
Refrigerator
Apr 16, 2026 · Apt 3A
Close - Unsanitary condition
Pests
Jan 21, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Jan 21, 2026 · Apt 1B
Close - Plumbing
Water supply
Jan 21, 2026 · Apt 1B
Close - Plumbing
Radiator
Jan 21, 2026 · Apt 1B
Close - Flooring/stairs
Floor
Jan 21, 2026 · Apt 1B
Close - Paint/plaster
Ceiling
Jan 21, 2026 · Apt 1B
Close - Plumbing
Bathtub/shower
Jan 21, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jan 21, 2026 · Apt 1B
Close - Plumbing
Water supply
Dec 29, 2025 · Apt A
Close - Flooring/stairs
Floor
Dec 29, 2025 · Apt A
Close - Unsanitary condition
Pests
Dec 29, 2025 · Apt A
Close - Plumbing
Basin/sink
Dec 29, 2025 · Apt A
Close - Heat/hot water
Apartment only
Dec 15, 2025 · Apt APTA
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 4, 2025 · Apt 1E
Close - Paint/plaster
Ceiling
Sep 5, 2025 · Apt A
Close - Unsanitary condition
Pests
Sep 5, 2025 · Apt A
Close - Electric
Outlet/switch
Sep 5, 2025 · Apt A
Close - Unsanitary condition
Garbage/recycling storage
Sep 5, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Sep 5, 2025 · Apt A
Close - Electric
Power outage
Jun 5, 2025 · Apt 1A
Close - General
Cooking gas
Jun 5, 2025 · Apt 1A
Close - Unsanitary condition
Pests
Apr 30, 2025 · Apt 3A
Close - Unsanitary condition
Garbage/recycling storage
Apr 30, 2025 · Apt 3A
Close - Unsanitary condition
Pests
Apr 30, 2025 · Apt 3A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 4
- Residential units
- 38
- Building area
- 31,400 ft²
- Lot area
- 10,000 ft²
- Zoning
- R6
- Community board
- 209
- Council district
- 17
- Block / lot
- 3776 / 66
- Assessed value
- $811,800
- Landmark / historic district
- No
HPD registration #208274, last renewed Jun 26, 2026.
Questions about 1225 Stratford Avenue
Who owns 1225 Stratford Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Ann-Gur Rlty Cp.
Does 1225 Stratford Avenue have violations?
Yes. NYC HPD has recorded 437 housing violations at this property.
Is 1225 Stratford Avenue rent stabilized?
NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 100% of its 38 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 1225 Stratford Avenue built?
City records list 1927 as the year it was built.
How many apartments are in 1225 Stratford Avenue?
It has 38 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.