roofy

1227 Wheeler Avenue

Bronx, NY 10472BBL 2-03771-0066Map

Owner of record: Wheeler II LLC

1227 Wheeler Avenue is a walk-up apartment building built in 1913 in Bronx, 10472. It has 11 residential units across 5 floors. The owner of record is Wheeler II LLC. HPD has recorded 121 housing violations here, most recently on September 16, 2026. 14 of the 50 most recent violations are still open. City tax records listed 10 rent-stabilized apartments here in 2024.

HPD violations
121
DOB violations
4
ECB violations
2
HPD complaints
88

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
10
About 91% of the building's 11 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 121

  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6a, 3rd story, 2nd apartment from east at south

    Sep 16, 2026 · Apt 6A

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Sep 16, 2026

    Open — Nov sent out
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at ....... in the entrance located at apt 5a, 3rd story, 1st apartment from south at west

    Aug 11, 2025 · Apt 5A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north and east walls in the bathroom located at apt 5a, 3rd story, 1st apartment from south at west

    Sep 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlets at west and east walls in the kitchen located at apt 5a, 3rd story, 1st apartment from south at west

    Sep 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical light fixture at ceiling in the 5th room from east located at apt 5a, 3rd story, 1st apartment from south at west

    Sep 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall around window moulding in the 1st room from east located at apt 5a, 3rd story, 1st apartment from south at west

    Sep 25, 2024 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Invalid certification
Show 40 more ↓
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the 1st room from east located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Invalid certification
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east at south located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east at south located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the 2nd room from east at south located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Defect letter issued
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from north at east wall in the 1st room from east located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the foyer located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 2nd story, 1st apartment from south at west

    Mar 30, 2023 · Apt 3A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1a, 1st story, 1st apartment from east at south

    Feb 7, 2023 · Apt 1A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system locked door at boiler room

    Feb 7, 2023

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 6th room from east, the bathroom , the private hallway , the 2nd room from east, the 1st room from east, the foyer located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the foyer located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north wall, south wall in the private hallway located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall, east wall, south wall in the 5th room from east located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation at 1st riser from east at south wall in the 5th room from east located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall, 1st riser from east at south wall, 1st closet from south at west wall door, 1st closet from south at west wall door frame in the 5th room from east located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, west wall in the 2nd room from east located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall, ceiling, west wall in the kitchen located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at 1st door frame from west at north wall in the kitchen located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation closed
  • B

    Properly repair the broken or defective lower sash window balance at south wall in the kitchen located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Properly repair the broken or defective wood base cabinet in the kitchen located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the private hallway located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 5th room from east located at apt 9a, 5th story, 1st apartment from south at west

    Jul 23, 2019 · Apt 9A

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the foyer , the 6th room from east, the 5th room from east, the kitchen , the 2nd room from east, the 1st room from east located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Closed — Violation closed
  • B

    Trace and repair the source and abate the nuisance consisting of mold ... 6 sq/ft south wall in the 5th room from east located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Open — Defect letter issued
  • B

    Abate the nuisance consisting of roaches in the entire apartment located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3; wg to replace = 0; wg to repair = 0; in the entire apartment located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Closed — Violation closed
  • B

    Repair or replace the smoke detector defective in the entire apartment located at apt 9a, 5th story, 1st apartment from south at west

    Aug 22, 2018 · Apt 9A

    Closed — Violation closed
  • B

    Repair or replace the smoke detector (missing) located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2018 · Apt 1A

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). (missing) located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2018 · Apt 1A

    Closed — Violation closed
  • B

    Remove the illegal fastening consisting of key operated lock installed on door leading to the fire escape window exit located at apt 1a, 1st story, 1st apartment from south at west

    Aug 8, 2018 · Apt 1A

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 2a, 1st story, 2nd apartment from south at west

    Dec 13, 2017 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the private hallway located at apt 2a, 1st story, 2nd apartment from south at west

    Dec 13, 2017 · Apt 2A

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector (defective) located at apt 9a, 5th story, 1st apartment from south at west

    Dec 13, 2017 · Apt 9A

    Closed — Violation dismissed

DOB building violations · 4

  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - active

ECB violations · 2

  • Non-hazardous

    Failure to comply with the commission order to file a certicerticate of correction 1st violation given on 6 25 01 for hazardous failure to maintain to maintain violation # 062501c09ec11 code b6a -27-127

    Aug 31, 2001

    Resolve
  • Hazardous

    Failure to maintain exterior building wall. small section of stucco fill off teh parapet wall. remedy: maintain exterior building wall.

    Jun 25, 2001 · Penalty $800

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Sep 16, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 16, 2026 · Apt 7

    Close
  • Heat/hot water

    Entire building

    Sep 15, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Sep 14, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Sep 14, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Sep 13, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Sep 13, 2026 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Jan 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 17, 2025 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Aug 1, 2025 · Apt 5A

    Close
  • Plumbing

    Basin/sink

    Aug 1, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Aug 1, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 11, 2024 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Sep 14, 2024 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 20, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2024 · Apt 9A

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2024 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Jan 12, 2024 · Apt 2A

    Close
  • Heat/hot water

    Entire building

    Dec 20, 2023 · Apt ALL

    Close
  • Heat/hot water

    Entire building

    Dec 19, 2023 · Apt 3A

    Close
  • Water leak

    Heavy flow

    Mar 29, 2023 · Apt 3A

    Close
  • Unsanitary condition

    Pests

    Mar 29, 2023 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2023 · Apt 3A

    Close
  • Heat/hot water

    Entire building

    Feb 5, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 30, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    May 9, 2022 · Apt 3A

    Close
  • Electric

    Lighting

    Jul 20, 2019 · Apt 9A

    Close
  • Electric

    Power outage

    Jul 20, 2019 · Apt 9A

    Close
  • Electric

    Lighting

    Aug 6, 2018 · Apt 1A

    Close
  • Heat/hot water

    Entire building

    Jul 2, 2018 · Apt 2

    Close
  • Electric

    Power outage

    Jul 2, 2018 · Apt BLDG

    Close
  • Electric

    Power outage

    Jul 2, 2018 · Apt BLDG

    Close
  • Electric

    Power outage

    Jul 2, 2018 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jul 1, 2018 · Apt 9A

    Close
  • Plumbing

    Water supply

    Jul 1, 2018 · Apt 9A

    Close

Sales history

DatePriceTypeUnits
Nov 12, 2025$970,000Rentals - walkup apartments11

Building details

Building type
Walk-up apartment building (C1)
Year built
1913
Floors
5
Residential units
11
Building area
13,400 ft²
Lot area
4,000 ft²
Zoning
R6
Community board
209
Council district
17
Block / lot
3771 / 66
Assessed value
$477,000
Landmark / historic district
No

HPD registration #203646, last renewed Mar 9, 2026.

Questions about 1227 Wheeler Avenue

Who owns 1227 Wheeler Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Wheeler II LLC.

Does 1227 Wheeler Avenue have violations?

Yes. NYC HPD has recorded 121 housing violations at this property.

Is 1227 Wheeler Avenue rent stabilized?

NYC Department of Finance tax bills listed 10 rent-stabilized units here in 2024 (about 91% of its 11 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 1227 Wheeler Avenue built?

City records list 1913 as the year it was built.

How many apartments are in 1227 Wheeler Avenue?

It has 11 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.