67 East 236 Street
Bronx, NY 10470BBL 2-03367-0061Map
Owner of record: M&A 236 LLC
67 East 236 Street is a walk-up apartment building built in 1927 in Bronx, 10470. It has 7 residential units across 3 floors. The owner of record is M&A 236 LLC. HPD has recorded 257 housing violations here, most recently on September 19, 2026. 28 of the 50 most recent violations are still open. City tax records listed 7 rent-stabilized apartments here in 2024.
- HPD violations
- 257
- DOB violations
- 9
- ECB violations
- 0
- HPD complaints
- 157
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 257
- BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the the floor at basement
Sep 19, 2026
Open — Nov certified on time - BHazardous
Properly repair with similar material the broken or defective concrete at floor at basement
Sep 19, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 2, 1st story, 2nd apartment from west at north
Aug 17, 2026 · Apt 2
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing. at public hall, 1st story
Apr 8, 2026
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective building entrance door lock and assembly from vestibule at public hall, 1st story
Apr 8, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective lock at door in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Open — Violation will be reinspected - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at north wall in the 1st room from north located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door at south in the 1st room from north located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective door in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Apr 7, 2026 · Apt 1
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Apr 4, 2026
Open — Not complied with - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Apr 4, 2026
Open — Not complied with - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 4, 2026
Open — Not complied with - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Apr 4, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 11, 2026 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 35 sq ft at ceiling, north wall, west wll, south wall and east wall in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 11, 2026 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4, 2nd story, 2nd apartment from west at north
Nov 26, 2025 · Apt 4
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 4th room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the bathroom located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Nov 17, 2025
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Replace with new the missing upper escutcheon plate at the south 1 steam riser in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective wood floor in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective connection at the west 1 radiator in the 1st room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective wall cabinets at the north and south wall in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 square feet at the north wall, east wall, south wall and the ceiling in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall, east wall in the 4th room from north located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall, west wall, ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Nov 17, 2025 · Apt 1
Open — First no access to re- inspect violation - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Sep 29, 2025
Open — Not complied with - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall
Sep 29, 2025
Open — Not complied with - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 5th room from north, the bathroom , the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 15, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Remove all obstructions and repair all defects in basin sink in the bathroom located at apt 1, 1st story, 1st apartment from west at north
Jan 15, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Jan 15, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 5th room from north located at apt 1, 1st story, 1st apartment from west at north
Jan 15, 2025 · Apt 1
Open — First no access to re- inspect violation - BHazardous
Provide adequate lighting at all public halls, all stories
Oct 29, 2024
Closed — Violation closed - CImmediately hazardous
§ 12 m/d law discontinue the storage of combustible material unsecured propane tank in east court
Oct 29, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule at public hall, 1st story
Oct 29, 2024
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2024
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock and assembly at building entrance door , 1st story
Mar 13, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule , 1st story
Mar 13, 2024
Closed — Violation closed - BHazardous
Provide adequate lighting at ceiling at public hall
Mar 6, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty mortise lock and assembly at building entrance door , 1st story
Jan 22, 2024
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Jan 22, 2024
Open — Not complied with - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 1, 1st story, 1st apartment from west at north
Jan 22, 2024 · Apt 1
Open — First no access to re- inspect violation
DOB building violations · 9
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 0
No ECB violations on record
Complaints
- Unsanitary condition
Garbage/recycling storage
Aug 16, 2026 · Apt 1
Close - Outside building
Pavement
Aug 16, 2026 · Apt 1
Close - Flooring/stairs
Stairs
Aug 16, 2026 · Apt 1
Close - General
Janitor/super
Aug 16, 2026 · Apt 1
Close - Unsanitary condition
Garbage/recycling storage
Aug 16, 2026 · Apt 1
Close - Unsanitary condition
Mold
Aug 11, 2026 · Apt 1
Close - Safety
Smoke detector
Jun 17, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt 1
Close - Door/window
Door
Jun 17, 2026 · Apt 1
Close
Show 40 more ↓
- Paint/plaster
Wall
Jun 17, 2026 · Apt 1
Close - Outside building
Pavement
Jun 17, 2026 · Apt 1
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt 1
Close - Unsanitary condition
Mold
Mar 28, 2026 · Apt 1
Close - Plumbing
Water supply
Feb 8, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jan 17, 2026 · Apt 1
Close - Unsanitary condition
Mold
Jan 3, 2026 · Apt 1
Close - Door/window
Door
Dec 10, 2025 · Apt 1
Close - Door/window
Door
Dec 10, 2025 · Apt 1
Close - Unsanitary condition
Mold
Dec 10, 2025 · Apt 1
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 3, 2025 · Apt APT1
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt BLDG
Close - Unsanitary condition
Mold
Nov 28, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 1
Close - Unsanitary condition
Mold
Nov 25, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 25, 2025 · Apt 5
Close - Heat/hot water
Apartment only
Nov 25, 2025 · Apt 1
Close - Paint/plaster
Window/frame
Nov 25, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 21, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 20, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 1
Close - General
Cabinet
Nov 14, 2025 · Apt 1
Close - Water leak
Damp spot
Nov 14, 2025 · Apt 1
Close - Plumbing
Radiator
Nov 14, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 8, 2025 · Apt 7
Close - Unsanitary condition
Mold
Sep 25, 2025 · Apt 1
Close - Heat/hot water
Apartment only
Mar 23, 2025 · Apt 1
Close - Plumbing
Basin/sink
Mar 23, 2025 · Apt 1
Close - Plumbing
Basin/sink
Jan 31, 2025 · Apt 1
Close - Plumbing
Basin/sink
Jan 11, 2025 · Apt 1
Close - Heat/hot water
Entire building
Nov 25, 2024 · Apt BLDG
Close - Plumbing
Bathtub/shower
Nov 11, 2024 · Apt 1
Close - Plumbing
Basin/sink
Nov 11, 2024 · Apt 1
Close - Heat/hot water
Apartment only
Jan 19, 2024 · Apt 1
Close - Plumbing
Radiator
Nov 9, 2023 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1927
- Floors
- 3
- Residential units
- 7
- Building area
- 5,742 ft²
- Lot area
- 3,450 ft²
- Zoning
- R4A
- Community board
- 212
- Council district
- 11
- Block / lot
- 3367 / 61
- Assessed value
- $652,950
- Landmark / historic district
- No
HPD registration #202054, last renewed Oct 7, 2025.
Questions about 67 East 236 Street
Who owns 67 East 236 Street?
The owner of record in NYC Department of City Planning PLUTO data is M&A 236 LLC.
Does 67 East 236 Street have violations?
Yes. NYC HPD has recorded 257 housing violations at this property.
Is 67 East 236 Street rent stabilized?
NYC Department of Finance tax bills listed 7 rent-stabilized units here in 2024 (about 100% of its 7 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 67 East 236 Street built?
City records list 1927 as the year it was built.
How many apartments are in 67 East 236 Street?
It has 7 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.