344 East 209 Street
Bronx, NY 10467BBL 2-03351-0035Map
Owner of record: 344 E 209 LLC
344 East 209 Street is a walk-up apartment building built in 1920 in Bronx, 10467. It has 32 residential units across 5 floors. The owner of record is 344 E 209 LLC. HPD has recorded 649 housing violations here, most recently on August 7, 2026. 21 of the 50 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2024.
- HPD violations
- 649
- DOB violations
- 3
- ECB violations
- 5
- HPD complaints
- 599
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 649
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from east at south
Aug 7, 2026 · Apt 3D
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3d, 3rd story, 2nd apartment from east at south
Aug 7, 2026 · Apt 3D
Open — Civ14 mailed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of an area rug at building entrance door , 1st story
Jul 27, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch from vestibule to public hall door at public hall, 1st story
Jul 14, 2026
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 24, 2026
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west and north wall in the 1st room from north at east located at apt 3a, 3rd story, 1st apartment from north at east
Jun 2, 2026 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 1st apartment from north at east
Jun 2, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color around window at east wall in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Jun 2, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the foyer located at apt wia, 1st apartment from north at east
Jun 2, 2026 · Apt WIA
Open — Not complied with - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage collection area at west yard yard
Jun 2, 2026
Open — Not complied with
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective vertical crack at west exterior wall (open brick and mortar joints) from 1st story to parapet wall
Jun 2, 2026
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vertical crack (open brick and mortar joints) at south exterior wall from 1st story to parapet wall
Jun 2, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective counterbalance at window causing window to be stuck close in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Jun 2, 2026 · Apt 3A
Closed — Violation dismissed - BHazardous
M/d law abate the nuisance consisting of vinyl floor tiles creating a trip hazard in the kitchen located at bsmt-apt wia, 1st bsmt-apt from north at east
Jun 2, 2026 · Apt WIA
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Jun 2, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at east entrance door from street to public hall basement
Jun 2, 2026
Closed — Violation closed - BHazardous
§ 27-2033.3(e) correct failure to maintain required records regarding internet capable temperature reporting devices and submit such records to the department upon request. data requested for the period of february 2026
Apr 24, 2026
Open — Nov sent out - ANon-hazardous
Provide place within the building for the storage of waste receptacles and disinfect same regularly.
Apr 20, 2026
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Apr 20, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story
Apr 20, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 20, 2026
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the yard at building rear
Apr 20, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 5th story
Apr 20, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Apr 20, 2026
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of overgrown vegetation obstructing egress at fire escape at building rear
Apr 20, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt wib, 1st apartment from west at north
Apr 15, 2026 · Apt WIB
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt wib, 1st apartment from west at north
Apr 15, 2026 · Apt WIB
Closed — Violation dismissed - BHazardous
§27-2033.3(b) correct failure to install an internet capable temperature reporting device in one living room in apartment ... located at apt 3d, 3rd story, 2nd apartment from south at west
Apr 9, 2026 · Apt 3D
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4d, 4th story, 2nd apartment from south at west
Apr 4, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Apr 4, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Apr 4, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4d, 4th story, 2nd apartment from south at west
Apr 4, 2026 · Apt 4D
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household item (mattress) at public hall, 4th story
Apr 4, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items (carpet and ladder) at public hall, 1st story
Apr 4, 2026
Closed — Violation closed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3a, 3rd story, 1st apartment from north at east
Apr 4, 2026 · Apt 3A
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 3a, 3rd story, 1st apartment from north at east
Apr 4, 2026 · Apt 3A
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, north, east and south wall in the 2nd room from north located at apt 3a, 3rd story, 1st apartment from north at east
Apr 4, 2026 · Apt 3A
Open — False certification - BHazardous
§27-2033.3(b) correct failure to install an internet capable temperature reporting device in one living room in apartment ... located at apt wia
Mar 21, 2026 · Apt WIA
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective hardwood floor in the 3rd room from east located at apt 1c, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1C
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1c, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at door in the entrance located at apt 1c, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 1c, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement at boiler room
Mar 21, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective radiator air valve releasing steam and or water in the 1st room from east at north located at apt wib, 1st apartment from west at north , section at east
Mar 21, 2026 · Apt WIB
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective radiator air valve releasing steam and or water in the 3rd room from east located at bsmt-apt wib, 1st bsmt-apt from west at north , section at east
Mar 21, 2026 · Apt WIB
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt wia
Mar 21, 2026 · Apt WIA
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 1c, 1st story, 1st apartment from south at west
Mar 21, 2026 · Apt 1C
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at bsmt-apt wib, 1st bsmt-apt from west at north , section at east
Mar 21, 2026 · Apt WIB
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the kitchen located at apt wia
Mar 21, 2026 · Apt WIA
Open — Nov sent out
DOB building violations · 3
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Construction other optional
C-construction other optional
May 26, 1992
Vpw-violation unserved ecb-work without permit-active
ECB violations · 5
- Hazardous
Failure to maintain building defect noted: at apt #1d 1st story broken and defective plaster at bedroom ceiling with approx 32 sq ft of plaster has fallen and approx 16sq st of remaining ceiling has cracks and
May 29, 2008 · Penalty $2,500
Resolve - Non-hazardous
Work without a permi two new apts created at n/e section of building. remedy: obtain a permit if feasible or restore premises to prior legal condition.
May 9, 1994
Resolve - Non-hazardous
Work without a permit work noted 2 new apartments created at n/e area of bldgs.remedy:file plans and obtain permit for work already done & obtain new certificate of occupancy or restore to prior legal condition
Feb 16, 1993
Resolve - Non-hazardous
Work without a permit. work noted: two(2) new apts. created at n/e area of bldg. at groung floor. remedy: file plans and obtain permit for work already done and obtain a new certificate of occuapncy or restore
May 26, 1992
Resolve - Non-hazardous
Work without a permit. second new apts created at n/e area of bldg. remedy: file plans and obtain permit for work already done and obtain new c of o.
Jan 8, 1990 · Penalty $1,000
Resolve
Complaints
- Water leak
Heavy flow
Oct 15, 2026 · Apt A
Open - Appliance
Electric/gas range
Oct 15, 2026 · Apt A
Open - Flooring/stairs
Floor
Oct 15, 2026 · Apt A
Open - Flooring/stairs
Floor
Oct 15, 2026 · Apt A
Open - Unsanitary condition
Mold
Oct 15, 2026 · Apt A
Open - Electric
Power outage
Jul 20, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Mar 13, 2026 · Apt WIB
Close - Unsanitary condition
Pests
Mar 13, 2026 · Apt WIB
Close - Unsanitary condition
Pests
Mar 13, 2026 · Apt WIB
Close - Plumbing
Radiator
Mar 13, 2026 · Apt WIB
Close
Show 40 more ↓
- Plumbing
Radiator
Feb 7, 2026 · Apt WIB
Close - Plumbing
Radiator
Feb 7, 2026 · Apt WIB
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt WIB
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
Jan 21, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 5E
Close - Water leak
Heavy flow
Jan 4, 2026 · Apt 2C
Close - Plumbing
Radiator
Dec 26, 2025 · Apt WIB
Close - Heat/hot water
Apartment only
Dec 26, 2025 · Apt WIB
Close - Electric
Power outage
Dec 16, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Dec 16, 2025 · Apt 5E
Close - Heat/hot water
Apartment only
Dec 14, 2025 · Apt WIB
Close - Heat/hot water
Entire building
Dec 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 29, 2025 · Apt BLDG
Close - Door/window
Door
Nov 20, 2025 · Apt 4E
Close - Door/window
Door
Nov 20, 2025 · Apt 4E
Close - Electric
Wiring
Nov 12, 2025 · Apt 4E
Close - Door/window
Door
Nov 12, 2025 · Apt 4E
Close - Appliance
Electric/gas range
Nov 12, 2025 · Apt 4E
Close - Paint/plaster
Wall
Nov 12, 2025 · Apt 4E
Close - Unsanitary condition
Pests
Nov 12, 2025 · Apt 4E
Close - Paint/plaster
Wall
Nov 12, 2025 · Apt 4E
Close - Paint/plaster
Wall
Nov 12, 2025 · Apt 4E
Close - Plumbing
Radiator
Nov 11, 2025 · Apt WIB
Close - Door/window
Door
Nov 11, 2025 · Apt WIB
Close - Unsanitary condition
Pests
Nov 11, 2025 · Apt WIB
Close - Unsanitary condition
Mold
Nov 11, 2025 · Apt WIB
Close - Safety
Fire escape
Nov 11, 2025 · Apt WIB
Close - Unsanitary condition
Pests
Nov 11, 2025 · Apt WIB
Close - Plumbing
Basin/sink
Oct 31, 2025 · Apt 3FFLOO
Close - Paint/plaster
Ceiling
Oct 31, 2025 · Apt 3FFLOO
Close - Water leak
Slow leak
Oct 31, 2025 · Apt 3FFLOO
Close - Water leak
Heavy flow
Oct 30, 2025 · Apt 4B
Close - Heat/hot water
Entire building
Oct 29, 2025 · Apt 4E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 32
- Building area
- 22,500 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 11
- Block / lot
- 3351 / 35
- Assessed value
- $808,200
- Landmark / historic district
- No
HPD registration #208093, last renewed Aug 11, 2025.
Questions about 344 East 209 Street
Who owns 344 East 209 Street?
The owner of record in NYC Department of City Planning PLUTO data is 344 E 209 LLC.
Does 344 East 209 Street have violations?
Yes. NYC HPD has recorded 649 housing violations at this property.
Is 344 East 209 Street rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2024 (about 100% of its 32 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 344 East 209 Street built?
City records list 1920 as the year it was built.
How many apartments are in 344 East 209 Street?
It has 32 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.