3510 Bainbridge Avenue
Bronx, NY 10467BBL 2-03344-0005Map
Owner of record: 3510 Bainbridge Ave.co.
3510 Bainbridge Avenue is an elevator apartment building built in 1932 in Bronx, 10467. It has 56 residential units across 6 floors. The owner of record is 3510 Bainbridge Ave.co.. HPD has recorded 174 housing violations here, most recently on July 29, 2026. 47 of the 50 most recent violations are still open. City tax records listed 56 rent-stabilized apartments here in 2024.
- HPD violations
- 174
- DOB violations
- 34
- ECB violations
- 17
- HPD complaints
- 336
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 174
- ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jul 29, 2026
Open — Nov certified on time - ANon-hazardous
Paint metal in accordance with dept. regulation door at entrance in the entrance located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the 1st room from north at west located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak the north wall in the 1st room from north at west located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at 2nd closet from west at north in the 1st private hallway from north at east located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall at 2nd closet from west at north in the 1st private hallway from north at east located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - ANon-hazardous
Cleanse to the satisfaction of this department the mold at the edge lining of bathtub at east wall and north wall in the bathroom located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st private hallway from north at west located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and east wall in the 1st private hallway from north at west located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Replace with new the missing electrical outlet cover plate at north wall in the kitchen located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Properly repair with similar material the broken or defective wood floor in the 1st private hallway from north at east located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - BHazardous
Properly secure the loose electrical outlet at south wall in the kitchen located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east , section ''south''
Jul 29, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department paint all walls in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east
Jun 2, 2026 · Apt 3H
Open — Civ14 mailed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at lobby, 3rd story
Jun 2, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east
Jun 2, 2026 · Apt 3H
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east
Jun 2, 2026 · Apt 3H
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east
Jun 2, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east
Jun 2, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3h, 3rd story, 2nd apartment from north at east
Jun 2, 2026 · Apt 3H
Open — Notice of issuance sent to tenant - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than sq.ft.of mold at north and east walls in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east original violation 18558625 issued 08-jan-26 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Jan 8, 2026 · Apt 2D
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than sq.ft.of mold at north and east walls in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2D
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at south wall in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east
Jan 8, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east , section at north
Dec 28, 2025 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east , section at north
Dec 28, 2025 · Apt 2D
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at west wall in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east , section at north original violation 18533899 issued 28-dec-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Dec 28, 2025 · Apt 2D
Open — First no access to re- inspect violation - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than ten square feet at west wall in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east , section at north
Dec 28, 2025 · Apt 2D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall in the foyer located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at south wall in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) baseboard at west wall in the 1st private hallway from north located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, north wall in the 1st private hallway from north located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Defect letter issued - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st window frame from south at west wall in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at west wall in the 2nd room from east at south located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east at north located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd private hallway from north located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east at north located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from east at south wall in the bathroom located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2c, 2nd story, 2nd apartment from south at west , section at north
Aug 2, 2024 · Apt 2C
Open — Nov sent out
DOB building violations · 34
- Construction other optional
Failure to comply with commissioner's order:dob violation #020226cfa07 02dd required the immediate 100% hands on inspection of all facade by pe/ra and submit a report to facades via email by 03/13/26.as of 06/30 /26,no hands on inspection report submitted to facades unit.remedy:com ply with dob violation #020226cfa0702dd immediately
Jun 30, 2026
Dob violation - active - Construction other optional
Emergency work order req'd-obsvd roof parapet leaning inward @ exp1 courtyeard include large vert masonry crack near exp1/2 corner on ground floor. @ exp3 obsvd mult masonry cracks. @ exp4 obsvd cracked/ damage sills. owner to immed retaina dog reg gc & nyspe to instal s/w shed @ full width of exp1 incl courtyard exp4 approx 50 linear feet
Mar 2, 2026
Dob violation - active - Construction other optional
Ftm bldg exter facde/appurt. obsrvd crackd brick masonary & inward lea -ning parapt @ exp1 wst (frnt courtyard) above pblic right way. remdy: retain a nys lic, rdp w/ qewi certifi to inspect & evalute100%hands on, the entire facde & parapet to determine sfty.take/provide adeqt sfty meas,file & permit all wrk. sbmit rprt to [email protected] by 3/13/26
Feb 2, 2026
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)
Jun 19, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 23, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2019
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2017)
Mar 27, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 27, 2018
Dob violation - resolved
Show 24 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Mar 29, 2017
Dob violation - resolved - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2016)
Feb 16, 2017
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2014
Sep 1, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2015)
Sep 1, 2016
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 3, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 16, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 10, 2013
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 3, 2012
Dob violation - resolved - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 17, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 30, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 28, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 21, 2007
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 13, 2006
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Elevator elevatorrequired
2p1578
Mar 1, 2002
Dob violation - resolved - Elevator elevatorrequired
(51)replace broken cwt shackel springs (52)provide access to motor room
Apr 27, 1989
Dob violation - resolved - Elevator elevatorrequired
51)clean car top 52)repair light in motor room
Dec 22, 1988
Dob violation - resolved
ECB violations · 17
- Class - 1
Failure to maintain building in a code compliant manner.property is sem-attached 6 and b occupied mix use located on a corner lot,at exposure 1 calong bainbridge ave and the courtyard near the main entrance,dob
Mar 2, 2026 · Penalty $2,500
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed at exp #1 west, #4 south-cracked brick at fire escape inserts multi loc.-exp #2 north, #3 east-cracked/spallin
Feb 2, 2026 · Penalty $5,000
Active - Class - 2
Combustible materials stored in boiler room-no discharge pipe for backflow valve-presuretrol missing dust cover.
Jun 8, 2022 · Penalty $312
Resolve - Class - 2
01b01,15m07,64m07,56o02;(01-b-01)=car top stop switch works in the reverse,repair,(15-m)=¢provide in-car,(64-m)=provide in-car,(56-o)clean oil from around machine.
Jun 23, 2019
Resolve - Class - 1
97x17 the only elevator in bldg ot of service. upon inspection the device is found to be out of service creating a hazardous condition as per 1rcny 11-02. rmdy: restore to service immediately and notify nycdob
Mar 2, 2018 · Penalty $1,030
Resolve - Class - 1
97x10)the only elevator in building out of service. upon inspection this device found to be out-of-service creating a hazardous condition as per 1rcny 11-02. remedy: restore to service immediately and notify ny
Feb 20, 2018 · Penalty $1,030
Resolve - Class - 2
97-x-10:repair elevation & return to service in order for a complete insp can be made.
Dec 28, 2015
Resolve - Class - 2
67x10,76q03,98bb05,99u15. 67x10-repair communication in car (telephone); 76q03-install cover for plank switch top of car.
Aug 26, 2013
Resolve - Class - 2
Work does not conform to approved construction documents/amendments for alt 2 job#200855057 of which permit expired 6/1/11 and applicant of record is requesting a letter of completion non-conforming work noted
Sep 7, 2011 · Penalty $500
Resolve - Class - 2
Failure to maintain building walls & appertenances.(i) spalled brickwork was found at parafet at south elevn(e. gunhill rd) (ii) defective window sills were found at various floors at south elevn(111)objects we
Jun 8, 2010 · Penalty $500
Resolve
Show 7 more ↓
- Class - 1
Fail to main exterior bldg wall(s) or appurtenances note:parapet wall at exposure has approx 3' vertical couch that compromise its stability and maybe in possible danger of collapse immed provde sidewalk shed t
May 19, 2010 · Penalty $500
Resolve - Hazardous
43h11,71m11,85bb05. 71-m-11 replace toe guard under car.
Nov 14, 2007 · Penalty $350
Resolve - Non-hazardous
46k 35l 03y 35 l 11 motor room with defective 03y02 clean car top of car
Mar 3, 1999 · Penalty $350
Resolve - Non-hazardous
15b8b46k53x50y50y35i03o30i11m47h57o
Apr 25, 1998 · Penalty $180
Resolve - Non-hazardous
18m,30p,35p,57o,57p,14m, 18-cover missing on inerlock 14- glass missing from
Dec 17, 1997
Resolve - Non-hazardous
Failure to maintain the front exterior parapet wall: some of the soldier brick are not stacked plumb and at other locations, there are missing brick. remedy: immediately provide pulbic protection, inspect the e
Oct 28, 1996 · Penalty $175
Resolve - Hazardous
Failure to maintain exterior building wall the parapet walls leaning out of plumb the steel lintles over window openings are sagging rusted brickwood is cracked bulding and unkeyed conditioins exist in various
Aug 24, 1995 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Garbage/recycling storage
Sep 18, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Sep 18, 2026 · Apt BLDG
Close - Door/window
Door
Jul 27, 2026 · Apt 3H
Close - Paint/plaster
Wall
Jul 27, 2026 · Apt 3H
Close - Unsanitary condition
Mold
Jul 27, 2026 · Apt 3H
Close - Unsanitary condition
Pests
Jul 27, 2026 · Apt 3H
Close - Flooring/stairs
Floor
Jul 27, 2026 · Apt 3H
Close - Paint/plaster
Ceiling
Jul 27, 2026 · Apt 3H
Close - General
Cabinet
Jul 27, 2026 · Apt 3H
Close - Electric
Outlet/switch
Jul 27, 2026 · Apt 3H
Close
Show 40 more ↓
- Paint/plaster
Wall
May 30, 2026 · Apt 3H
Close - Paint/plaster
Wall
May 30, 2026 · Apt 3H
Close - Unsanitary condition
Pests
May 30, 2026 · Apt 3H
Close - Unsanitary condition
Pests
May 30, 2026 · Apt 3H
Close - Door/window
Door
May 30, 2026 · Apt 3H
Close - Heat/hot water
Entire building
Jan 27, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 6, 2026 · Apt 2D
Close - Plumbing
Water supply
Jan 6, 2026 · Apt 2D
Close - Heat/hot water
Entire building
Dec 26, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Dec 24, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 22, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Dec 22, 2025 · Apt 2D
Close - Plumbing
Water supply
Dec 22, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 19, 2025 · Apt 2D
Close - Heat/hot water
Apartment only
Dec 8, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Jan 11, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Aug 30, 2024 · Apt 2J
Close - Door/window
Door frame
Aug 30, 2024 · Apt 2J
Close - Water leak
Slow leak
Aug 30, 2024 · Apt 2J
Close - Paint/plaster
Ceiling
Aug 30, 2024 · Apt 2J
Close - Paint/plaster
Wall
Aug 30, 2024 · Apt 2J
Close - Safety
Smoke detector
Aug 30, 2024 · Apt 2J
Close - Door/window
Window frame
Aug 30, 2024 · Apt 2J
Close - Unsanitary condition
Mold
Aug 30, 2024 · Apt 2J
Close - Unsanitary condition
Pests
Aug 30, 2024 · Apt 2J
Close - Door/window
Door
Aug 30, 2024 · Apt 2J
Close - Electric
Outlet/switch
Aug 30, 2024 · Apt 2J
Close - Plumbing
Basin/sink
Aug 30, 2024 · Apt 2J
Close - Flooring/stairs
Floor
Aug 30, 2024 · Apt 2J
Close - Paint/plaster
Ceiling
Jul 29, 2024 · Apt 2C
Close - Paint/plaster
Ceiling
Jul 29, 2024 · Apt 2C
Close - Plumbing
Bathtub/shower
Jul 29, 2024 · Apt 2C
Close - Plumbing
Toilet
Apr 23, 2024 · Apt 6B
Close - Plumbing
Bathtub/shower
Apr 23, 2024 · Apt 6B
Close - Plumbing
Basin/sink
Apr 23, 2024 · Apt 6B
Close - Water leak
Slow leak
Apr 23, 2024 · Apt 6B
Close - Unsanitary condition
Pests
Apr 17, 2024 · Apt 2L
Close - Electric
No lighting
Apr 17, 2024 · Apt 2L
Close - Door/window
Door
Apr 17, 2024 · Apt 2L
Close - Plumbing
Basin/sink
Apr 17, 2024 · Apt 2L
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1932
- Floors
- 6
- Residential units
- 56
- Building area
- 56,500 ft²
- Lot area
- 14,209 ft²
- Zoning
- R7-1
- Community board
- 207
- Council district
- 11
- Block / lot
- 3344 / 5
- Assessed value
- $2,078,550
- Landmark / historic district
- No
HPD registration #206078, last renewed Sep 2, 2025.
Questions about 3510 Bainbridge Avenue
Who owns 3510 Bainbridge Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3510 Bainbridge Ave.co..
Does 3510 Bainbridge Avenue have violations?
Yes. NYC HPD has recorded 174 housing violations at this property.
Is 3510 Bainbridge Avenue rent stabilized?
NYC Department of Finance tax bills listed 56 rent-stabilized units here in 2024 (about 100% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3510 Bainbridge Avenue built?
City records list 1932 as the year it was built.
How many apartments are in 3510 Bainbridge Avenue?
It has 56 residential units and 64 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.