3070 Bainbridge Avenue
Bronx, NY 10467BBL 2-03334-0022Map
Owner of record: 3070 Bainbridge Ave Corp
3070 Bainbridge Avenue is a mixed residential and retail building built in 1920 in Bronx, 10467. It has 6 residential units across 4 floors. The owner of record is 3070 Bainbridge Ave Corp. HPD has recorded 157 housing violations here, most recently on June 6, 2025. 41 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 157
- DOB violations
- 6
- ECB violations
- 2
- HPD complaints
- 241
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 157
- CImmediately hazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods out of guide at west exterior wall at fire escape
Jun 6, 2025
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1n, 2nd story, 2nd apartment from north at east
Jan 24, 2025 · Apt 1N
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Jan 24, 2025
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 1n, 2nd story, 2nd apartment from north at east
Jan 24, 2025 · Apt 1N
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective loose 8th wood tread from bottom at public hall stairs, 1st story
Jan 24, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective mortise lock at building entrance door at public hall, 1st story
Jan 24, 2025
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 3n, 3rd story, 1st apartment from west at north
Aug 22, 2024 · Apt 3N
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at bulkhead
Aug 22, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 3n, 3rd story, 1st apartment from west at north
Aug 22, 2024 · Apt 3N
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south
Feb 17, 2024 · Apt 3S
Open — Nov sent out
Show 40 more ↓
- BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south
Feb 17, 2024 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective upper sash spring balance at west window in the 4th room from north at west located at apt 3s, 3rd story, 1st apartment from east at south
Feb 17, 2024 · Apt 3S
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 3s, 4th story, 1st apartment from south at west
Dec 16, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair or replace the smoke detector defective located at apt 3s, 4th story, 1st apartment from south at west
Dec 16, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods .. at fire escape, section ''west''
Dec 16, 2023
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 16, 2023
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft at ceiling in the foyer located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Notice of issuance sent to tenant - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperative in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from north at east located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... approx 1 sq ft at ceiling in the foyer located at apt 3s, 4th story, 1st apartment from east at south original violation 16074422 issued 02-jul-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
Jul 2, 2023 · Apt 3S
Open — Defect letter issued - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 5 sq ft at east wall and 5 sq ft at ceiling in the bathroom located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Defect letter issued - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at 1st closet from north at east wall ceiling in the 3rd room from north located at apt 3s, 4th story, 1st apartment from east at south
Jul 2, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 12 sq ft east wall in the bathroom located at apt 3s, 4th story, 1st apartment from east at south
Jun 28, 2023 · Apt 3S
Open — Defect letter issued - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at west, the bathroom , the 3rd room from north, the kitchen , the foyer , the 4th room from north at east located at apt 3s, 4th story, 1st apartment from east at south
Jun 28, 2023 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
Jun 28, 2023 · Apt 3S
Open — Notice of issuance sent to tenant - BHazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 3s, 4th story, 1st apartment from east at south
Jun 28, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north at west located at apt 3s, 4th story, 1st apartment from east at south
Jun 28, 2023 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... approximately 16 sq ft at north wall, 4 sq ft at west wall, 6 sq ft at ceiling and 8 sq ft at east wall in the bathroom located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, west wall in the bathroom located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at west, the 4th room from north at east, the 3rd room from north, the kitchen located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair or replace the smoke detector inoperable in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the 4th room from north at east located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from north located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the 4th room from north at west located at apt 3s, 4th story, 1st apartment from east at south
May 7, 2023 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the bathroom located at apt 3s, 3rd story, 1st apartment from east at south
Mar 13, 2023 · Apt 3S
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south
Mar 13, 2023 · Apt 3S
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from north at west located at apt 3s, 3rd story, 1st apartment from east at south
Mar 13, 2023 · Apt 3S
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from east at south wall in the kitchen located at apt 3s, 3rd story, 1st apartment from east at south
Mar 13, 2023 · Apt 3S
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south
Mar 13, 2023 · Apt 3S
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3s, 3rd story, 1st apartment from east at south
Mar 13, 2023 · Apt 3S
Open — Notice of issuance sent to tenant
DOB building violations · 6
- Construction other optional
C-construction other optional
Apr 23, 2002
Vw*-violation - work w/o permit dismissed - Construction other optional
C-construction other optional
Apr 23, 2002
Vw*-violation - work w/o permit dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Electric signs none
Es-electric signs none
Dec 3, 1992
Dob violation - dismissed - Electric signs none
Es-electric signs none
Dec 3, 1992
Dob violation - dismissed - Boiler boiler optional
B-boiler boiler optional
Jun 21, 1991
Dob violation - dismissed
ECB violations · 2
- Class - 2
Observed on the ground floor in tropical pets animal facility no sprinkler system in place, no smoke alarm in place and no fire extinguisher in place which is contrary to code section bc 903.2.2.2; bc 903.2.2.2
Jul 10, 2024 · Penalty $1,250
Active - Hazardous
1c,4b,23,description of 4b drain value inoperative. description of 23 dirty not visible.
Jun 21, 1991
Resolve
Complaints
- Heat/hot water
Apartment only
Jun 17, 2025 · Apt 1S
Close - Unsanitary condition
Mold
Jun 17, 2025 · Apt 1S
Close - Door/window
Door
Jun 17, 2025 · Apt NA
Close - Door/window
Door
Jun 17, 2025 · Apt NA
Close - Door/window
Door
Jun 16, 2025 · Apt 2S
Close - Door/window
Door
Jun 16, 2025 · Apt 1S
Close - Heat/hot water
Entire building
Jun 16, 2025 · Apt 1S
Close - Door/window
Door
Jun 16, 2025 · Apt 1S
Close - Unsanitary condition
Mold
Jun 16, 2025 · Apt 2N
Close - Plumbing
Bathtub/shower
Jan 24, 2025 · Apt 1N
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Jan 24, 2025 · Apt 1N
Close - Flooring/stairs
Floor
Jan 24, 2025 · Apt 1N
Close - Flooring/stairs
Floor
Jan 24, 2025 · Apt 1N
Close - Plumbing
Basin/sink
Jan 24, 2025 · Apt 1N
Close - Flooring/stairs
Floor
Jan 23, 2025 · Apt 1N
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 1N
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 1N
Close - Water leak
Heavy flow
Jun 22, 2023 · Apt 3S
Close - Paint/plaster
Radiator
Jun 22, 2023 · Apt 3S
Close - Paint/plaster
Wall
Jun 22, 2023 · Apt 3S
Close - Unsanitary condition
Mold
Jun 22, 2023 · Apt 3S
Close - Unsanitary condition
Pests
Jun 22, 2023 · Apt 3S
Close - Paint/plaster
Wall
Jun 22, 2023 · Apt 3S
Close - Water leak
Heavy flow
Jun 22, 2023 · Apt 3S
Close - Unsanitary condition
Pests
Apr 29, 2023 · Apt 3S
Close - Unsanitary condition
Pests
Apr 29, 2023 · Apt 3S
Close - Water leak
Heavy flow
Apr 29, 2023 · Apt 3S
Close - Paint/plaster
Ceiling
Mar 4, 2023 · Apt 3S
Close - Heat/hot water
Entire building
Jan 14, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2020 · Apt 25
Close - Heat/hot water
Apartment only
Dec 5, 2019 · Apt 1N
Close - Heat/hot water
Entire building
Nov 25, 2019 · Apt 1N
Close - Flooring/stairs
Floor
Feb 14, 2018 · Apt 1N
Close - Heat/hot water
Entire building
Jan 25, 2017 · Apt 3
Close - Heat/hot water
Entire building
Jan 23, 2017 · Apt 1N
Close - Heat/hot water
Entire building
Jan 19, 2017 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 13, 2017 · Apt 1N
Close - Heat/hot water
Apartment only
Jan 9, 2017 · Apt 1N
Close - Heat/hot water
Apartment only
Jan 9, 2017 · Apt 1N
Close - Heat/hot water
Entire building
Jan 8, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 8, 2017 · Apt 1N
Close - Heat/hot water
Apartment only
Jan 7, 2017 · Apt 1N
Close - Outside building
Roofing
Sep 13, 2016 · Apt 3S
Close - Paint/plaster
Wall
Feb 13, 2016 · Apt 1N
Close - Plumbing
Bathtub/shower
Feb 13, 2016 · Apt 1N
Close - Plumbing
Bathtub/shower
Jan 31, 2016 · Apt 1N
Close - Flooring/stairs
Floor
Jan 31, 2016 · Apt 1N
Close - Paint/plaster
Wall
Jan 29, 2016 · Apt 1N
Close - Flooring/stairs
Floor
Jan 29, 2016 · Apt 1N
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Mixed residential and retail building (S9)
- Year built
- 1920
- Floors
- 4
- Residential units
- 6
- Building area
- 9,000 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5D
- Community board
- 207
- Council district
- 11
- Block / lot
- 3334 / 22
- Assessed value
- $453,600
- Landmark / historic district
- No
HPD registration #211359, last renewed Sep 26, 2025.
Questions about 3070 Bainbridge Avenue
Who owns 3070 Bainbridge Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3070 Bainbridge Ave Corp.
Does 3070 Bainbridge Avenue have violations?
Yes. NYC HPD has recorded 157 housing violations at this property.
Is 3070 Bainbridge Avenue rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 100% of its 6 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3070 Bainbridge Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 3070 Bainbridge Avenue?
It has 6 residential units and 11 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.