353 E Mosholu Parkway N
Bronx, NY 10467BBL 2-03332-0001Map
Owner of record: Vaszer Realty, LLC
353 E Mosholu Parkway N is a walk-up apartment building built in 1915 in Bronx, 10467. It has 25 residential units across 5 floors. The owner of record is Vaszer Realty, LLC. HPD has recorded 1,277 housing violations here, most recently on September 15, 2026. 44 of the 50 most recent violations are still open. City tax records listed 26 rent-stabilized apartments here in 2023.
- HPD violations
- 1,277
- DOB violations
- 19
- ECB violations
- 4
- HPD complaints
- 887
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,277
- BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the kitchen located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet but less than 30 square feet observed at the ceiling in the bathroom located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective entry wood door in the bathroom located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective rotted wood bottom shelf at the sink base cabinet in the kitchen located at apt 6, 2nd story, 1st apartment from west at north
Sep 15, 2026 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the 5th room from north located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Properly repair or replace the broken or defective window glass lower sash at west wall in the 1st room from north at west located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of key oparated lock at door leading to room with fire escape in the 5th room from north located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective window glass lower sash at east wall at public hall, 2nd story
Aug 18, 2026
Open — Nov sent out - BHazardous
Properly secure the loose water closet in the bathroom located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the kitchen located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 17, 4th story, 2nd apartment from south at west
Aug 18, 2026 · Apt 17
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Jul 20, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Jul 20, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Jul 20, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall, east wall and west wall at public hall, 2nd story
Jul 20, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling, north wall, east wall and west wall at public hall, 2nd story
Jul 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jul 15, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective wood cabinets at south wall in the kitchen located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling in the 1st room from east at north located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from east located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at west wall in the bathroom located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from east located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective wired glass pane at lower sash window at intermediate landing at public hall, 3rd story
Jul 15, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower sash window at fire escape in the 3rd room from east at north located at apt 11, 3rd story, 1st apartment from south at west
Jul 15, 2026 · Apt 11
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of household items and two wooden tables at public hall, 4th story
Jul 10, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective glass pane lower window sash at public hall stairs, 2nd story
Jul 10, 2026
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from south at west wall door frame, 1st window frame from east at south wall, 1st window frame from north at east wall in the 1st room from east at south located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from east at south wall in the kitchen located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the foyer located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, south wall, east wall, west wall, 1st window frame from west at north wall, 2nd window frame from west at north wall in the 3rd room from east at north located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules inoperable in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations inoperable in the entire apartment located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall, north wall in the 1st room from east at south located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the kitchen located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective spring balance at lower window sash in the 3rd room from east at north located at apt 6, 2nd story, 1st apartment from west at north
Jun 29, 2026 · Apt 6
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 5, 2026
Open — Nov sent out - CImmediately hazardous
Repair the leaky and/or defective faucets hot water at bathtub in the bathroom located at apt 11, 3rd story, 1st apartment from west at north
Jun 5, 2026 · Apt 11
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective plaster with fire rated material at the east and west walls at the bulkhead at public hall stairs
Jun 3, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at the ceiling at public hall, 5th story
Jun 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at the vestibule door at public hall, 1st story
Jun 3, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges at bulkhead at public hall stairs
Jun 3, 2026
Open — Nov sent out
DOB building violations · 19
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed
Show 9 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 4
- Class - 2
At the time of inspection, i observed work taking place inside unit 14 without a permit for the scope of work . the activity appears to involve bathroom plumbing, including replacement of the bathtub and shower
May 14, 2026 · Penalty $6,250
Active - Class - 2
I found a rockmill mp90 steam boiler non-operable/ correct all violating condition/ submit certificate of correction
Jun 2, 2025 · Penalty $6,250
Active - Class - 2
At time of inspection observed household excessive wooden debris piled underneath rear yard fire escape which partially obstructing drop ladder. also observed installed exterior window a/c inadequate manner wit
May 25, 2023 · Penalty $3,125
Active - Hazardous
Failure to maintain adequate housekeeping.excessive const debris in alleyway prior of bldg.wood -bags.remedy:maintain adequate housekeeping.
Feb 3, 2007 · Penalty $500
Resolve
Complaints
- General
Cabinet
Sep 7, 2026 · Apt 6
Close - Flooring/stairs
Floor
Sep 7, 2026 · Apt 6
Close - Paint/plaster
Ceiling
Sep 7, 2026 · Apt 6
Close - Door/window
Door
Sep 7, 2026 · Apt 6
Close - Door/window
Window frame
Sep 7, 2026 · Apt 6
Close - Unsanitary condition
Mold
Sep 7, 2026 · Apt 6
Close - Water leak
Heavy flow
Sep 7, 2026 · Apt 6
Close - Paint/plaster
Ceiling
Aug 17, 2026 · Apt 17
Close - Paint/plaster
Ceiling
Aug 17, 2026 · Apt 17
Close - Plumbing
Toilet
Aug 17, 2026 · Apt 17
Close
Show 40 more ↓
- Water leak
Damp spot
Aug 17, 2026 · Apt 17
Close - Safety
Smoke detector
Aug 6, 2026 · Apt 17
Close - Safety
Carbon monoxide detector
Aug 6, 2026 · Apt 17
Close - Safety
Window guard broken/missing
Aug 6, 2026 · Apt 17
Close - Paint/plaster
Ceiling
Jul 16, 2026 · Apt 9
Close - Plumbing
Toilet
Jul 6, 2026 · Apt 17
Open - Plumbing
Basin/sink
Jul 6, 2026 · Apt 17
Open - Unsanitary condition
Pests
Jul 6, 2026 · Apt 17
Open - Door/window
Door
Jul 6, 2026 · Apt 17
Open - Unsanitary condition
Pests
Jul 6, 2026 · Apt 17
Open - Paint/plaster
Ceiling
Jul 6, 2026 · Apt 17
Open - Heat/hot water
Entire building
Jul 6, 2026 · Apt 17
Open - Plumbing
Toilet
Jun 30, 2026 · Apt 3FL
Close - Flooring/stairs
Floor
Jun 30, 2026 · Apt 3FL
Close - Door/window
Window frame
Jun 30, 2026 · Apt 3FL
Close - Water leak
Heavy flow
Jun 30, 2026 · Apt 3FL
Close - Door/window
Door
Jun 22, 2026 · Apt 6
Close - Safety
Fire escape
Jun 22, 2026 · Apt 6
Close - Flooring/stairs
Floor
Jun 22, 2026 · Apt 6
Close - Appliance
Refrigerator
Jun 22, 2026 · Apt 6
Close - Unsanitary condition
Mold
Jun 22, 2026 · Apt 6
Close - Water leak
Slow leak
Jun 22, 2026 · Apt 6
Close - Appliance
Electric/gas range
Jun 22, 2026 · Apt 6
Close - Flooring/stairs
Floor
Jun 9, 2026 · Apt 6
Close - Paint/plaster
Ceiling
Jun 9, 2026 · Apt 6
Close - Door/window
Window frame
Jun 9, 2026 · Apt 6
Close - Flooring/stairs
Floor
Jun 9, 2026 · Apt 6
Close - Unsanitary condition
Mold
Jun 9, 2026 · Apt 6
Close - Paint/plaster
Wall
Jun 9, 2026 · Apt 6
Close - Plumbing
Toilet
Jun 9, 2026 · Apt 6
Close - Door/window
Door
Jun 9, 2026 · Apt 6
Close - Plumbing
Water supply
Jun 3, 2026 · Apt 11
Close - Plumbing
Bathtub/shower
Jun 3, 2026 · Apt 11
Close - General
Janitor/super
Jun 1, 2026 · Apt PUBLIC
Close - Unsanitary condition
Garbage/recycling storage
Jun 1, 2026 · Apt PUBLIC
Close - Safety
Smoke detector
May 29, 2026 · Apt 17
Close - Safety
Carbon monoxide detector
May 29, 2026 · Apt 17
Close - Safety
Window guard broken/missing
May 29, 2026 · Apt 17
Close - Plumbing
Toilet
May 13, 2026 · Apt 17
Close - Plumbing
Basin/sink
May 13, 2026 · Apt 17
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 5
- Residential units
- 25
- Building area
- 20,093 ft²
- Lot area
- 15,250 ft²
- Zoning
- R7A
- Community board
- 207
- Council district
- 11
- Block / lot
- 3332 / 1
- Assessed value
- $462,600
- Landmark / historic district
- No
HPD registration #220720, last renewed Nov 25, 2025.
Questions about 353 E Mosholu Parkway N
Who owns 353 E Mosholu Parkway N?
The owner of record in NYC Department of City Planning PLUTO data is Vaszer Realty, LLC.
Does 353 E Mosholu Parkway N have violations?
Yes. NYC HPD has recorded 1,277 housing violations at this property.
Is 353 E Mosholu Parkway N rent stabilized?
NYC Department of Finance tax bills listed 26 rent-stabilized units here in 2023 (about 100% of its 25 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 353 E Mosholu Parkway N built?
City records list 1915 as the year it was built.
How many apartments are in 353 E Mosholu Parkway N?
It has 25 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.