3585 Dekalb Avenue
Bronx, NY 10467BBL 2-03329-0058Map
Owner of record: 3585 Rlty Corp
3585 Dekalb Avenue is a walk-up apartment building built in 1926 in Bronx, 10467. It has 27 residential units across 5 floors. The owner of record is 3585 Rlty Corp. HPD has recorded 365 housing violations here, most recently on May 4, 2026. 12 of the 50 most recent violations are still open. City tax records listed 27 rent-stabilized apartments here in 2024.
- HPD violations
- 365
- DOB violations
- 4
- ECB violations
- 6
- HPD complaints
- 959
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 365
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the kitchen located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Lead docs submitted, acceptable - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the bathroom located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall, west wall, 1st window frame from north at east wall in the 3rd room from north located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st dumb waiter from east at south wall, north wall in the kitchen located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall, east wall, 1st window frame from north at east wall in the kitchen located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall, 1st window frame from north at east wall in the 1st room from north located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, south wall, east wall, west wall in the bathroom located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd window frame from north at east wall in the 3rd room from north located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall in the kitchen located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, north wall, 2nd window frame from north at east wall in the 1st room from north located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st dumb waiter from east at south wall in the kitchen located at apt 4a, 2nd story, 1st apartment from north at east
May 4, 2026 · Apt 4A
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 3rd room from north, the bathroom , the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
Feb 22, 2026 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Nov 1, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Nov 1, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Jul 27, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly at building entrance door , 1st story
Jul 27, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 4a, 2nd story, 1st apartment from north at east
Jul 24, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 4a, 2nd story, 1st apartment from north at east
Jul 24, 2025 · Apt 4A
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and its assembly at door from street to vestibule at public hall, 1st story
Jul 23, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door from street to vestibule at public hall, 1st story
Jul 23, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door frame casing at west wall in the foyer located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the foyer located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the kitchen located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall, 2nd window frame from north at east wall in the 3rd room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective casing and sill at fire escape window in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash at fire escape window in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective spring balance at lower sash window at east wall in the bathroom located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Cleanse to the satisfaction of this department the mold on grout at north, east and south ceramic wall tiles in the bathroom located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective wood base cabinet at sink in the kitchen located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Replace the broken or defective wash basin in the bathroom located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, baseboard at east wall, east wall, south wall in the 3rd room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall, 1st closet from east at south wall door, east wall in the foyer located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling, baseboard at north wall, north wall in the kitchen located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from west at north wall in the kitchen located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at south wall in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from west at north wall in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st window frame from north at east wall in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at 1st window frame from north at east wall in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at ceiling, north wall, east wall, south wall, west wall and 1st window frame from north at east wall in the bathroom located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, baseboard at east wall, 2nd window frame from north at east wall in the 1st room from north located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood cabinets at south wall in the kitchen located at apt 4d, 5th story, 1st apartment from north at east
May 8, 2025 · Apt 4D
Closed — Violation dismissed
DOB building violations · 4
- Plumbing none
New gas piping valves and nipples installed throughout the building without a permit remedy: obtain a permit
Jun 13, 2014
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 25, 2012
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 13, 2011
Dob violation - dismissed - Construction other optional
C-construction other optional
Dec 17, 2010
Dob violation - dismissed
ECB violations · 6
- Class - 1
Work w/o a permit. on 6/13/14 @4pm during physical insp i observed new gas valve & nipples installed in apts #6a & 4b w/o a permit also noted gas lines, 1-new meter bar & 1-gas valve for gas range in apt #3a in
Jun 13, 2014 · Penalty $1,630
Resolve - Class - 2
Fail to maintain bldg in code compliant manner/fail to provide gas for cooking. during physical insp i observed the entire bldg w/o gas for cooking. gas must be provided for cooking when the bldg is occupied. r
Jun 13, 2014
Resolve - Class - 1
Failure to maintain interior bldg defect:at apt#5b, approx. 21x31 of the ceiling at the bathrm has collapsed.there are also several cracks in the bedroom,kitchen & througout the apt.remedy:maintain & make all n
Oct 28, 2011 · Penalty $1,000
Resolve - Class - 1
Unlawful act(s)failure to comply w/an order of the comm.resp'd failed to correct the conditions cited in prior nov#34868630m.installed a door in cellar load bearing wall w/o a lintel no permits have been issued
Oct 16, 2010
Resolve - Class - 1
Work w/o permit.work noted:@ the cellar,an opening was created @ a load bearing wall.the opening is approx 2'-6" x 7'-0".there is no lintel to support the bricks @ the header.also,the open were the staircase is
Aug 26, 2010
Resolve - Hazardous
Protection of sidwalk. inadequate protection provide for the sidewalk while removing and replacing sections of the parapet wall (north parapet). "stop work" remedy:immediately stop all further construction, but
May 7, 1998
Resolve
Complaints
- Paint/plaster
Ceiling
Apr 28, 2026 · Apt 4A
Close - Water leak
Damp spot
Apr 28, 2026 · Apt 4A
Close - Unsanitary condition
Mold
Apr 28, 2026 · Apt 4A
Close - Flooring/stairs
Floor
Apr 28, 2026 · Apt 4A
Close - Unsanitary condition
Pests
Feb 25, 2026 · Apt 4A
Close - Flooring/stairs
Floor
Feb 25, 2026 · Apt 4A
Close - General
Cabinet
Feb 25, 2026 · Apt 4A
Close - Water leak
Slow leak
Feb 25, 2026 · Apt 4A
Close - Paint/plaster
Ceiling
Feb 25, 2026 · Apt 4A
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close
Show 40 more ↓
- Unsanitary condition
Mold
Jan 29, 2026 · Apt 4D
Close - Plumbing
Bathtub/shower
Jan 29, 2026 · Apt 4D
Close - Plumbing
Basin/sink
Jan 29, 2026 · Apt 4D
Close - Door/window
Window frame
Jan 29, 2026 · Apt 4D
Close - Appliance
Electric/gas range
Jan 29, 2026 · Apt 4D
Close - Safety
Fire escape
Jan 29, 2026 · Apt 4D
Close - Heat/hot water
Entire building
Oct 30, 2025 · Apt 2D
Close - Heat/hot water
Entire building
Oct 28, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Jul 30, 2025 · Apt 4A
Close - Plumbing
Bathtub/shower
Jul 30, 2025 · Apt 4A
Close - Plumbing
Basin/sink
Jul 30, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Jul 30, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Jul 29, 2025 · Apt 2A
Close - Water leak
Heavy flow
Jul 29, 2025 · Apt 2A
Close - Paint/plaster
Ceiling
Jul 29, 2025 · Apt 2A
Close - Paint/plaster
Wall
Jul 29, 2025 · Apt 2A
Close - Door/window
Door
Jul 29, 2025 · Apt 2A
Close - Plumbing
Toilet
Jul 29, 2025 · Apt 2A
Close - General
Cabinet
Jul 29, 2025 · Apt 2A
Close - Appliance
Refrigerator
Jul 29, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Jul 12, 2025 · Apt 4A
Close - Unsanitary condition
Pests
Jul 12, 2025 · Apt 4A
Close - Paint/plaster
Ceiling
Jul 12, 2025 · Apt 4A
Close - Flooring/stairs
Floor
Jul 12, 2025 · Apt 4A
Close - Water leak
Damp spot
Jul 12, 2025 · Apt 4A
Close - Unsanitary condition
Mold
Jul 12, 2025 · Apt 4A
Close - Plumbing
Basin/sink
May 7, 2025 · Apt 4D
Close - Unsanitary condition
Mold
May 7, 2025 · Apt 4D
Close - Door/window
Window frame
May 7, 2025 · Apt 4D
Close - General
Cabinet
May 7, 2025 · Apt 4D
Close - Appliance
Electric/gas range
May 7, 2025 · Apt 4D
Close - Unsanitary condition
Pests
Mar 19, 2025 · Apt 5D
Close - Heat/hot water
Apartment only
Feb 5, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 5, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 5, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 26, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1926
- Floors
- 5
- Residential units
- 27
- Building area
- 24,110 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-1
- Community board
- 207
- Council district
- 11
- Block / lot
- 3329 / 58
- Assessed value
- $752,850
- Landmark / historic district
- No
HPD registration #202082, last renewed Aug 29, 2025.
Questions about 3585 Dekalb Avenue
Who owns 3585 Dekalb Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3585 Rlty Corp.
Does 3585 Dekalb Avenue have violations?
Yes. NYC HPD has recorded 365 housing violations at this property.
Is 3585 Dekalb Avenue rent stabilized?
NYC Department of Finance tax bills listed 27 rent-stabilized units here in 2024 (about 100% of its 27 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3585 Dekalb Avenue built?
City records list 1926 as the year it was built.
How many apartments are in 3585 Dekalb Avenue?
It has 27 residential units and 28 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.