roofy

115 E Mosholu Parkway N

Bronx, NY 10467BBL 2-03326-0001Map

Owner of record: Emerald 115 Mosholu LLC

115 E Mosholu Parkway N is a walk-up apartment building built in 1924 in Bronx, 10467. It has 95 residential units across 5 floors. The owner of record is Emerald 115 Mosholu LLC. HPD has recorded 1,799 housing violations here, most recently on August 30, 2026. 11 of the 50 most recent violations are still open. City tax records listed 92 rent-stabilized apartments here in 2024.

HPD violations
1,799
DOB violations
7
ECB violations
7
HPD complaints
2,913

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 30, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
92
About 97% of the building's 95 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 1,799

  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Aug 30, 2026

    Open — Nov certified on time
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the household garbage at courtyard at building center

    Aug 30, 2026

    Open — Nov certified on time
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story, section ''d''

    Aug 30, 2026

    Open — Nov certified on time
  • B

    Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at building entrance door at section ''d'' , 1st story

    Aug 30, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash at east wall at public hall stairs, 2nd story

    Aug 30, 2026

    Open — Nov certified on time
  • B

    Properly repair or replace the broken or defective electrical outlet at north wall in the 2nd room from north located at apt a14, 1st story, 3rd apartment from south at west

    Jul 31, 2026 · Apt A14

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective uneven ceramic tiles at floor in the bathroom located at apt a14, 1st story, 3rd apartment from south at west

    Jul 31, 2026 · Apt A14

    Open — Civ14 mailed
  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt a14, 1st story, 3rd apartment from south at west

    Jul 31, 2026 · Apt A14

    Open — Civ14 mailed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt a14, 1st story, 3rd apartment from south at west

    Jul 31, 2026 · Apt A14

    Open — Civ14 mailed
  • A

    Trace and repair the source and abate the visible mold condition... observed less than 10 sq ft at ceiling in the bathroom located at apt a14, 1st story, 3rd apartment from south at west

    Jul 31, 2026 · Apt A14

    Open — Notice of issuance sent to tenant
Show 40 more ↓
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the center yard at building front

    Jun 7, 2026

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at east and north wall iniside first closet from north at east in the 2nd room from north at east located at apt e12, 1st story, 1st apartment from south at west , section ''''e''''

    Jun 7, 2026 · Apt E12

    Closed — Violation dismissed
  • B

    Provide door knob and assembly at entrance door in the 2nd room from north at east located at apt e12, 1st story, 1st apartment from south at west , section ''''e''''

    Jun 7, 2026 · Apt E12

    Closed — Violation dismissed
  • B

    Refit entrance door in the 2nd room from north at east located at apt e12, 1st story, 1st apartment from south at west , section ''''e''''

    Jun 7, 2026 · Apt E12

    Closed — Violation dismissed
  • B

    Replace with new the missing radiator in the 2nd room from north at west located at apt e12, 1st story, 1st apartment from south at west , section ''''e''''

    Jun 7, 2026 · Apt E12

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of uncapped radiator valve in the 2nd room from north at west located at apt e12, 1st story, 1st apartment from south at west , section ''''e''''

    Jun 7, 2026 · Apt E12

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt e12, 1st story, 1st apartment from south at west , section ''''e''''

    Jun 7, 2026 · Apt E12

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... greater than (10) sq ft at ceiling and east wall in the 4th room from east located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock at the 1st door from west at north in the entrance located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • B

    Remove all obstructions and repair all defects in sink drain line in the kitchen located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective wood floor in the 4th room from east located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the 4th room from east located at apt c42, 4th story, 1st apartment from east at south

    Apr 29, 2026 · Apt C42

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at bsmt-apt 2, 1st bsmt-apt from north at east

    Mar 31, 2026 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective escutcheon plate at heat riser pipe in the bathroom located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective hinges at north door in the kitchen located at bsmt-apt 2, 1st bsmt-apt from north at east

    Mar 31, 2026 · Apt 2

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlets at north and east walls in the 1st room from east at south located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective lower sash window in the bathroom located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective spring balance at lower sash window in the bathroom located at apt 2, 1st story, 2nd apartment from north at east , section ''bldgfront''

    Mar 31, 2026 · Apt 2

    Closed — Violation dismissed
  • B

    M/d law abate the nuisance consisting of bicycle attached to support bar for gas lines at ceiling in the private hallway located at apt 2, 1st story, 2nd apartment from north at east , section ''bldgfront''

    Mar 31, 2026 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective mortise lock and latch at door in the entrance located at apt 2, 1st story, 2nd apartment from north at east , section ''bldgfront''

    Mar 31, 2026 · Apt 2

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective escutcheon plate at heat riser pipe in the kitchen located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective cracked lower sash window pane at 1st window from east at north in the 1st room from east at south located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective poreclain enamel finish by method of reglazing at bathtub in the bathroom located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective air valve at radiator at west wall in the 1st room from east at south located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • C

    Properly repair or replace the broken or defective air valve at heat riser pipe in the kitchen located at apt c54, 5th story, 1st apartment from east at south

    Mar 31, 2026 · Apt C54

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the 1st room from north at west located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation closed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at building front yard

    Mar 24, 2026

    Open — False certification
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at east wall in the 1st room from north at east located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from north at east located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective spring balance at lower window sash in the 1st room from north at east located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood floor in the 1st room from north at east located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation closed
  • C

    Provide radiator at west in the 1st room from north at west located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of uncapped radiator valve at west in the 1st room from north at west located at apt e12, 1st story, 1st apartment from south at west

    Mar 24, 2026 · Apt E12

    Closed — Violation closed

DOB building violations · 7

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 1, 2009

    Dob violation - dismissed
  • Construction other optional

    C-construction other optional

    Aug 8, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boiler boiler optional

    B-boiler boiler optional

    Mar 8, 1989

    Dob violation - dismissed

ECB violations · 7

  • Class - 2

    W/o a permit. noted: at bsmt west at south storage area - full height partition walls erected to create a bthrm & 2 bdrms. water & waste lines installed for a 3 pc bthrm (toilet, sink, shower). electrical wirin

    Jun 2, 2023 · Penalty $625

    Resolve
  • Class - 1

    Contrary to c-of-o # 200699798 which indicates 6 bsmt apts. at time of inspection - bsmt west at south storage area sidewalk entrance was observed converted into living space with a 3 pc bthrm; kitchen area wit

    Jun 2, 2023 · Penalty $2,500

    Active
  • Class - 2

    Sidewalk shed does not meet code specifications. - missing vandal proof fixtures. remedy: conform shed to code specifications.

    Aug 7, 2009 · Penalty $10,000

    Resolve
  • Non-hazardous

    Use of illegal hardware. gate @ fire passageway to the street (east side) has been pad locked. remedy: remove illegal hardware.

    Oct 25, 2007 · Penalty $350

    Resolve
  • Non-hazardous

    Occupancy contrary to that allowed by the c of o #2363158.from legal:doctors office at basement to illegal office at basement.rem:discontinue illegal use or amend c of o.

    Feb 9, 2001 · Penalty $800

    Resolve
  • Non-hazardous

    Work without a permit.work noted:bldg a total rehab fl,electrical wiring sheetrock walls,ceiling throughout the entire bldg all story apt.bldg e walls removed(plaster)new electrical pannel boxes installed 5-4fl

    Feb 9, 2001 · Penalty $250

    Resolve
  • Non-hazardous

    Plumbing work without a permit.found plumbing fixtures in bathrooms and kitchens removed.apartments a & e bathrooms have been gutted down to studs floors removed installing some water lines,toilet drain lines,t

    Jan 29, 2001 · Penalty $800

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Oct 19, 2026 · Apt E42

    Open
  • Water leak

    Damp spot

    Oct 19, 2026 · Apt E42

    Open
  • Paint/plaster

    Ceiling

    Oct 19, 2026 · Apt E42

    Open
  • Unsanitary condition

    Pests

    Oct 19, 2026 · Apt E42

    Open
  • Door/window

    Window frame

    Oct 19, 2026 · Apt E42

    Open
  • Plumbing

    Toilet

    Oct 19, 2026 · Apt E42

    Open
  • Electric

    Wiring

    Aug 28, 2026 · Apt D55

    Close
  • Electric

    Power outage

    Aug 28, 2026 · Apt D55

    Close
  • Plumbing

    Water supply

    Aug 9, 2026 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Jul 23, 2026 · Apt A14

    Close
Show 40 more ↓
  • Flooring/stairs

    Floor

    Jul 23, 2026 · Apt A14

    Close
  • Plumbing

    Basin/sink

    Jul 23, 2026 · Apt A14

    Close
  • Unsanitary condition

    Mold

    Jul 23, 2026 · Apt A14

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 15, 2026 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Jul 15, 2026 · Apt C54

    Close
  • Electric

    Outlet/switch

    May 21, 2026 · Apt D31

    Close
  • Paint/plaster

    Ceiling

    Apr 20, 2026 · Apt C42

    Close
  • General

    Cabinet

    Apr 20, 2026 · Apt C42

    Close
  • Unsanitary condition

    Mold

    Apr 20, 2026 · Apt C42

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2026 · Apt C54

    Close
  • Plumbing

    Steam pipe/riser

    Mar 30, 2026 · Apt C54

    Close
  • Door/window

    Window pane

    Mar 30, 2026 · Apt C54

    Close
  • Electric

    Outlet/switch

    Mar 30, 2026 · Apt C54

    Close
  • Door/window

    Window frame

    Mar 30, 2026 · Apt C54

    Close
  • Paint/plaster

    Ceiling

    Mar 30, 2026 · Apt C54

    Close
  • Plumbing

    Radiator

    Mar 30, 2026 · Apt C54

    Close
  • Plumbing

    Bathtub/shower

    Mar 30, 2026 · Apt C54

    Close
  • Unsanitary condition

    Pests

    Mar 30, 2026 · Apt C54

    Close
  • Safety

    Smoke detector

    Mar 30, 2026 · Apt C54

    Close
  • Door/window

    Window frame

    Mar 27, 2026 · Apt 2

    Close
  • Door/window

    Door

    Mar 27, 2026 · Apt 2

    Close
  • Paint/plaster

    Wall

    Mar 27, 2026 · Apt 2

    Close
  • Flooring/stairs

    Floor

    Mar 27, 2026 · Apt 2

    Close
  • Door/window

    Window frame

    Mar 16, 2026 · Apt E12

    Close
  • Electric

    Power outage

    Mar 15, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 15, 2026 · Apt BLDG

    Close
  • Electric

    Power outage

    Mar 15, 2026 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Mar 8, 2026 · Apt C54

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2026 · Apt C54

    Close
  • Door/window

    Window pane

    Mar 8, 2026 · Apt C54

    Close
  • Safety

    Carbon monoxide detector

    Mar 8, 2026 · Apt C54

    Close
  • Plumbing

    Radiator

    Mar 8, 2026 · Apt C54

    Close
  • Plumbing

    Basin/sink

    Mar 8, 2026 · Apt C54

    Close
  • Unsanitary condition

    Pests

    Mar 8, 2026 · Apt C54

    Close
  • Electric

    Outlet/switch

    Mar 8, 2026 · Apt C54

    Close
  • Paint/plaster

    Ceiling

    Mar 8, 2026 · Apt C54

    Close
  • Safety

    Smoke detector

    Mar 8, 2026 · Apt C54

    Close
  • Flooring/stairs

    Floor

    Feb 13, 2026 · Apt E12

    Close
  • Unsanitary condition

    Pests

    Feb 13, 2026 · Apt E12

    Close
  • Safety

    Carbon monoxide detector

    Feb 13, 2026 · Apt E12

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C1)
Year built
1924
Floors
5
Residential units
95
Building area
92,000 ft²
Lot area
17,852 ft²
Zoning
R7-1
Community board
207
Council district
11
Block / lot
3326 / 1
Assessed value
$1,805,400
Landmark / historic district
No

HPD registration #209370, last renewed Jun 16, 2026.

Questions about 115 E Mosholu Parkway N

Who owns 115 E Mosholu Parkway N?

The owner of record in NYC Department of City Planning PLUTO data is Emerald 115 Mosholu LLC.

Does 115 E Mosholu Parkway N have violations?

Yes. NYC HPD has recorded 1,799 housing violations at this property.

Is 115 E Mosholu Parkway N rent stabilized?

NYC Department of Finance tax bills listed 92 rent-stabilized units here in 2024 (about 97% of its 95 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 115 E Mosholu Parkway N built?

City records list 1924 as the year it was built.

How many apartments are in 115 E Mosholu Parkway N?

It has 95 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.