2917 Grand Concourse
Bronx, NY 10468BBL 2-03319-0093Map
Owner of record: 2917 LLC
2917 Grand Concourse is a walk-up apartment building built in 1921 in Bronx, 10468. It has 56 residential units across 5 floors. The owner of record is 2917 LLC. HPD has recorded 512 housing violations here, most recently on September 23, 2026. 24 of the 50 most recent violations are still open. City tax records listed 56 rent-stabilized apartments here in 2024.
- HPD violations
- 512
- DOB violations
- 17
- ECB violations
- 6
- HPD complaints
- 1,430
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 512
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 23, 2026
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules within 15 feet of all living areas in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations installed within 15 feet of all living areas in the entire apartment located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of raised flooring at entrance creating a trip hazard in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcielan enamel finish by method of reglazing at bathtub in the bathroom located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Refit door at entrance in the 3rd room from north located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at east located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at east located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10sqft of mold at ceiling in the 3rd room from north located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Notice of issuance sent to tenant
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of raised vinyl flooring creating a trip hazard in the kitchen located at apt 1b, 1st story, 2nd apartment from north at east , section ''south'', at north
Sep 23, 2026 · Apt 1B
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2c, 2nd story, 1st apartment from south at west , section ''south'', 1st from east at south
Sep 21, 2026 · Apt 2C
Open — Nov sent out - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 2b, 2nd story, 2nd apartment from north at east , 1st section from east at south
Sep 21, 2026 · Apt 2B
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Correct failure to provide to the department within 45 days of demand all records required to be maintained by owner pursuant to local law 1 of 2004 related to lead-based paint notices, inspections and remediation/abatement activities.
Jul 13, 2026 · Apt 4DS
Open — Nov sent out - CImmediately hazardous
Correct failure to notify occupants and/or to investigate lead-based paint hazards.
Jul 13, 2026 · Apt 4DS
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north , section ''north''
Jun 17, 2026 · Apt 1CN
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north , section ''north''
Jun 17, 2026 · Apt 1CN
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at apt 1bs, 1st story, 2nd apartment from north at east
May 28, 2026 · Apt 1BS
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation steam riser in the bathroom located at apt 1bs, 1st story, 2nd apartment from north at east
May 28, 2026 · Apt 1BS
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective intercom system from building entrance to panel at north wall in the foyer located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet door at sink in the kitchen located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall in the kitchen located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling in the kitchen located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at floor in the bathroom located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at east wall in the 1st room from east located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall and west wall in the 1st room from east located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 1st room from east located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5as, 5th story, 1st apartment from north at east , section ''south''
Feb 28, 2025 · Apt 5AS
Open — Defect letter issued - BHazardous
Remove all encumbrances consisting of household items at public hall, 4th story, section ''south''
Feb 28, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling, west wall and north wall at public hall, 1st story, section ''south''
Feb 28, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall and west wall at public hall, 1st story, section ''south''
Feb 28, 2025
Closed — Violation dismissed - BHazardous
Properly secure the loose vinly floor tiles in the 1st room from east located at apt 5a, 5th story, 1st apartment from north at east , section at south
Feb 1, 2025 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2an, 2nd story, 2nd apartment from north at east
Jan 26, 2025 · Apt 2AN
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2an, 2nd story, 2nd apartment from north at east
Jan 26, 2025 · Apt 2AN
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st riser from north at east wall in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west
Jan 6, 2025 · Apt 2C
Open — First no access to re- inspect violation - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration consisting of a 220 volt electrical outlet accommodating a electric range stove at west wall in the kitchen located at apt 2c, 2nd story, 1st apartment from south at west , section ''south''
Jan 4, 2025 · Apt 2C
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective cracked and lifting ceramic floor tiles ( trip/cut hazard) in the bathroom located at apt 2c, 2nd story, 1st apartment from south at west , section ''south''
Jan 4, 2025 · Apt 2C
Open — First no access to re- inspect violation - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 25, 2024
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline at bathtub in the bathroom located at apt 1cn, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1CN
Closed — Violation closed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1CN
Closed — Violation closed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1CN
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1CN
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective spring balances upper and lower window sashes in the 4th room from east located at apt 1cn, 1st story, 1st apartment from west at north
Oct 29, 2024 · Apt 1CN
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective the wood floor under radiator in the 2nd room from east located at apt 1cn, 1st story, 1st apartment from west at north , section ''north''
Aug 31, 2024 · Apt 1CN
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation all steam radiators and riser pipes in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north , section ''north''
Aug 31, 2024 · Apt 1CN
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1cn, 1st story, 1st apartment from west at north , section ''north''
Aug 31, 2024 · Apt 1CN
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing hook and eye at building entrance door at public hall, 1st story, section at north
Aug 11, 2024
Closed — Violation closed
DOB building violations · 17
- Construction other optional
Structural stability requested for cracks on the fa ade around the building exp#1, exp#3, exp#4
Sep 12, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)
Jun 20, 2021
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed
Show 7 more ↓
- Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 6, 2014
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 1, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 6
- Class - 1
Southside of building fire escape above main front door 5th floor egress is being blocked ac unit installed in window to fire escape and on 3rd floor being used as construction area piles of trash and materials
Sep 12, 2025 · Penalty $625
Resolve - Class - 1
Front (exp1) south side, grand concourse side (over sidewalk) crack in facade and mortar missing in many areas, also on exp4 of building, repair and/replace
Sep 12, 2025 · Penalty $2,500
Resolve - Class - 2
Failure to maintain bldg interior in apt 5d on 5th fl fl are sloping near kitchen also the bathroom approx 2 in remedy: obtain any necessarypermits provide engineer report for fl make all repair
Mar 3, 2009
Resolve - Hazardous
Failure to maintain.noted:metal pole antennas on roof (2) are improperly attached to roof & causing a hazardous condition(1) antenna on eachnorth & south wings of premises.remedy:make site safe, make all repair
Dec 6, 2006 · Penalty $2,000
Resolve - Hazardous
Failure to maintain. noted: metal pole antennas on roof 2 are improperly attached to roof & cause a hazardous condition 1 antenna on each north & south wings of premises. remedy: make site safe, make all repair
Aug 29, 2006
Resolve - Non-hazardous
Failure to maintain defects: metal pole antennas on roof(2) are improperly attached to roof and cause a hazardous condition. one(1) antenna on each north & south wings of premises. remedy:make site safe
Apr 25, 2006
Resolve
Complaints
- Unsanitary condition
Pests
Sep 28, 2026 · Apt 1C
Open - Flooring/stairs
Floor
Aug 28, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Aug 28, 2026 · Apt 1B
Close - Unsanitary condition
Mold
Jul 7, 2026 · Apt 4DS
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 1CN
Close - Unsanitary condition
Pests
Jun 22, 2026 · Apt 1CN
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt 1CN
Close - Unsanitary condition
Pests
Jun 9, 2026 · Apt 1CN
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close
Show 40 more ↓
- Door/window
Door
Dec 12, 2025 · Apt 1C
Close - Door/window
Door
Dec 9, 2025 · Apt 1C
Close - Unsanitary condition
Mold
Sep 19, 2025 · Apt 5C
Close - Unsanitary condition
Pests
Sep 19, 2025 · Apt 5C
Close - Electric
Outlet/switch
Sep 17, 2025 · Apt 1CN
Close - Paint/plaster
Wall
Sep 17, 2025 · Apt 1CN
Close - Heat/hot water
Apartment only
Jun 5, 2025 · Apt 1A
Close - Plumbing
Toilet
May 6, 2025 · Apt 1CN
Close - Paint/plaster
Wall
Feb 28, 2025 · Apt 5AS
Close - Unsanitary condition
Pests
Feb 28, 2025 · Apt 5AS
Close - Flooring/stairs
Floor
Feb 28, 2025 · Apt 5AS
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt 1C
Close - Heat/hot water
Entire building
Feb 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt 1AS
Close - Paint/plaster
Wall
Jan 28, 2025 · Apt 5ASOUT
Close - Unsanitary condition
Mold
Jan 28, 2025 · Apt 5ASOUT
Close - Flooring/stairs
Floor
Jan 28, 2025 · Apt 5ASOUT
Close - Heat/hot water
Apartment only
Jan 22, 2025 · Apt 2AN
Close - Heat/hot water
Apartment only
Jan 3, 2025 · Apt 1A
Close - Heat/hot water
Apartment only
Jan 2, 2025 · Apt 2C
Close - Heat/hot water
Apartment only
Dec 22, 2024 · Apt 1ASOUT
Close - Heat/hot water
Entire building
Dec 12, 2024 · Apt 1AS
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 4, 2024 · Apt 1AS
Close - Heat/hot water
Entire building
Nov 30, 2024 · Apt 1AS
Close - Unsanitary condition
Pests
Oct 24, 2024 · Apt 1CN
Close - Door/window
Window frame
Oct 24, 2024 · Apt 1CN
Close - Door/window
Window frame
Oct 15, 2024 · Apt 1CN
Close - Unsanitary condition
Pests
Aug 13, 2024 · Apt 1CN
Close - Paint/plaster
Ceiling
Jul 3, 2024 · Apt 1CN
Close - Paint/plaster
Ceiling
Jun 25, 2024 · Apt 1CN
Close - Paint/plaster
Ceiling
Jun 25, 2024 · Apt 1CN
Close - Unsanitary condition
Pests
Mar 4, 2024 · Apt 1CN
Close - Paint/plaster
Ceiling
Mar 4, 2024 · Apt 1CN
Close - Plumbing
Bathtub/shower
Jan 30, 2024 · Apt S3D
Close - Electric
Lighting
Jan 27, 2024 · Apt 1CN
Close - Flooring/stairs
Stairs
Jan 2, 2024 · Apt 1AS
Close - Unsanitary condition
Pests
Nov 25, 2023 · Apt 5AS
Close - Paint/plaster
Wall
Nov 25, 2023 · Apt 5AS
Close - Appliance
Electric/gas range
Nov 22, 2023 · Apt 1CN
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1921
- Floors
- 5
- Residential units
- 56
- Building area
- 55,623 ft²
- Lot area
- 11,500 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 14
- Block / lot
- 3319 / 93
- Assessed value
- $1,554,300
- Landmark / historic district
- No
HPD registration #202046, last renewed Jul 24, 2025.
Questions about 2917 Grand Concourse
Who owns 2917 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is 2917 LLC.
Does 2917 Grand Concourse have violations?
Yes. NYC HPD has recorded 512 housing violations at this property.
Is 2917 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 56 rent-stabilized units here in 2024 (about 100% of its 56 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2917 Grand Concourse built?
City records list 1921 as the year it was built.
How many apartments are in 2917 Grand Concourse?
It has 56 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.