104 East 196 Street
Bronx, NY 10468BBL 2-03314-0039Map
Owner of record: Efrata Realty, INC
104 East 196 Street is a walk-up apartment building built in 1922 in Bronx, 10468. It has 23 residential units across 2 floors. The owner of record is Efrata Realty, INC. HPD has recorded 513 housing violations here, most recently on July 20, 2026. 36 of the 50 most recent violations are still open. City tax records listed 23 rent-stabilized apartments here in 2024.
- HPD violations
- 513
- DOB violations
- 6
- ECB violations
- 5
- HPD complaints
- 621
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 513
- CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with door intact at public hall, 1st story
Jul 20, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective sink base cabinet in the kitchen located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is missing in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is missing in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the kitchen located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 1st apartment from west at north
Jun 7, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story
Mar 3, 2026
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Properly repair with similar material the broken or defective fire retardant ceiling at public hall, 5th story
Mar 3, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Jan 28, 2026 · Apt 3B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 28, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Jan 28, 2026 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective 1st marble tread from bottom up at vestibule at public hall, 1st story
Dec 2, 2025
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5d, 5th story, 1st apartment from east at south
Dec 2, 2025 · Apt 5D
Open — Nov certified late - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north, the kitchen , the bathroom , the foyer , the private hallway located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at north, east, south ,and west walls and ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Open — First no access to re- inspect violation - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at south and west walls in the bathroom located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing electrical outlet plate at south wall in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 2nd room from north located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 3c, 3rd story, 1st apartment from north at east
Oct 16, 2025 · Apt 3C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance , 1st story
Oct 1, 2025
Open — Violation will be reinspected - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly , 1st story
Oct 1, 2025
Open — Not complied with - BHazardous
Remove all encumbrances consisting of furniture at public hall, 2nd story
Sep 21, 2025
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lock and assembly at building entrance door (from entrance to vestibule) , 1st story
Sep 21, 2025
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective interior glass pane at lower window sash at south in the 2nd room from east located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective door at entrance in the 4th room from east located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door (from entrance to vestibule) , 1st story
Sep 21, 2025
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, north and east walls in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq.ft at ceiling and all walls in the bathroom located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — First no access to re- inspect violation - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3b, 3rd story, 1st apartment from south at west
Sep 21, 2025 · Apt 3B
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty mortise lock and assemblies at building entrance door (from street to public hall) at basement
Jul 29, 2025
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from north at east wall in the foyer located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective intercom system at east wall in the kitchen located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Open — Nov sent out - BHazardous
Replace with new the missing missing saddle at kitchen door in the kitchen located at apt 3a, 3rd story, 2nd apartment from south at west
Jul 22, 2025 · Apt 3A
Open — Nov sent out
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - active - Immediate emergency anythingoptional
Provide approximately 20 lf of sidewalk shed at exposure#4(creston avenue) with a cantilever into exposure#3
Jun 7, 2022
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 1
Observed vertical masonry cracks and brick parapet wall separation at exposure# 3 and 4 (north/west corner) at roof level. spalled bricks at exposure#3., repair and/replace
Jun 7, 2022 · Penalty $1,250
Active - Non-hazardous
Sec. 16,32a,35,40,48a,50,50a,50b,50c,50d,50e. 50- four(4)(prestrols) on one 1/4 nipple 50a-backflow missing air gap and discharge pipe 50b-anti syphon water in horizontal position 50c-debris in boiler room 50d-
Apr 16, 2008
Resolve - Non-hazardous
Work w/o a permit.basement apt wb-new partitions throughout-new entrance new mini-kitchen & adjacent bathroom.raised fl in most south-west room(no fixtures installed in kitchen or bathroom)(just tub)stop all wk
Mar 29, 2007 · Penalty $250
Resolve - Non-hazardous
Failure to maintain:defect noted at time of inspection observed excessive construction debris piled to the top windows of ground floor.location rear of bldg.remedy:remove all debris maintain property
Jun 25, 2004 · Penalty $180
Resolve - Non-hazardous
Work without permits:removed plaster walls.installing all new pipes for plumbing in bathroom and kitchen.installed new sheetrock and concrete wall board.location entire ground floor apt.stop all work.remedy:obt
Jun 25, 2004 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Apr 16, 2026 · Apt 5B
Close - Plumbing
Basin/sink
Apr 16, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Mar 30, 2026 · Apt 5B
Close - Paint/plaster
Wall
Mar 30, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 2, 2026 · Apt 3
Close - Heat/hot water
Apartment only
Feb 11, 2026 · Apt 2C
Close - Outside building
Roofing
Jan 27, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Jan 27, 2026 · Apt 5B
Close - Water leak
Slow leak
Jan 27, 2026 · Apt 5B
Close
Show 40 more ↓
- Appliance
Electric/gas range
Jan 27, 2026 · Apt 5B
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt 5B
Close - Plumbing
Basin/sink
Jan 27, 2026 · Apt 5B
Close - Paint/plaster
Ceiling
Jan 27, 2026 · Apt 5B
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt 2D
Close - Paint/plaster
Wall
Jan 25, 2026 · Apt 3B
Close - Door/window
Door
Jan 25, 2026 · Apt 3B
Close - Plumbing
Radiator
Jan 25, 2026 · Apt 3B
Close - Heat/hot water
Apartment only
Jan 25, 2026 · Apt 3B
Close - Electric
Power outage
Jan 25, 2026 · Apt 3B
Close - Heat/hot water
Entire building
Jan 15, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 12, 2025 · Apt 2B
Close - Unsanitary condition
Mold
Oct 11, 2025 · Apt 3C
Close - Paint/plaster
Ceiling
Oct 11, 2025 · Apt 3C
Close - Paint/plaster
Ceiling
Oct 11, 2025 · Apt 3C
Close - Flooring/stairs
Floor
Sep 16, 2025 · Apt 3B
Close - Plumbing
Bathtub/shower
Sep 16, 2025 · Apt 3B
Close - Door/window
Window frame
Sep 16, 2025 · Apt 3B
Close - General
Cabinet
Sep 16, 2025 · Apt 3B
Close - Paint/plaster
Wall
Sep 16, 2025 · Apt 3B
Close - Plumbing
Basin/sink
Sep 16, 2025 · Apt 3B
Close - Unsanitary condition
Mold
Sep 16, 2025 · Apt 3B
Close - Door/window
Door
Sep 16, 2025 · Apt 3B
Close - Door/window
Window pane
Sep 16, 2025 · Apt 3B
Close - Door/window
Door
Sep 16, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Jul 14, 2025 · Apt 3A
Close - Paint/plaster
Door/frame
Jul 14, 2025 · Apt 3A
Close - Water leak
Slow leak
May 30, 2025 · Apt 2A
Close - Plumbing
Water supply
May 30, 2025 · Apt 2A
Close - General
Cabinet
May 30, 2025 · Apt 2A
Close - Paint/plaster
Ceiling
May 30, 2025 · Apt 2A
Close - Unsanitary condition
Pests
May 30, 2025 · Apt 2A
Close - Unsanitary condition
Pests
Feb 16, 2025 · Apt 3A
Close - Paint/plaster
Ceiling
Feb 16, 2025 · Apt 3A
Close - Water leak
Heavy flow
Feb 16, 2025 · Apt 3A
Close - Heat/hot water
Apartment only
Jan 24, 2025 · Apt 3B
Close - Unsanitary condition
Pests
Jan 15, 2025 · Apt 3A
Close - Paint/plaster
Ceiling
Jan 15, 2025 · Apt 3A
Close - Heat/hot water
Entire building
Jan 9, 2025 · Apt 5C
Close - Heat/hot water
Apartment only
Jan 8, 2025 · Apt 2C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1922
- Floors
- 2
- Residential units
- 23
- Building area
- 17,040 ft²
- Lot area
- 3,780 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 14
- Block / lot
- 3314 / 39
- Assessed value
- $678,600
- Landmark / historic district
- No
HPD registration #216362, last renewed Jul 15, 2026.
Questions about 104 East 196 Street
Who owns 104 East 196 Street?
The owner of record in NYC Department of City Planning PLUTO data is Efrata Realty, INC.
Does 104 East 196 Street have violations?
Yes. NYC HPD has recorded 513 housing violations at this property.
Is 104 East 196 Street rent stabilized?
NYC Department of Finance tax bills listed 23 rent-stabilized units here in 2024 (about 100% of its 23 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 104 East 196 Street built?
City records list 1922 as the year it was built.
How many apartments are in 104 East 196 Street?
It has 23 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.