190 E Mosholu Parkway S
Bronx, NY 10458BBL 2-03311-0138Map
Owner of record: 190 E Mosholu Pkwy Ownrs
190 E Mosholu Parkway S is an elevator apartment building built in 1939 in Bronx, 10458. It has 55 residential units across 6 floors. The owner of record is 190 E Mosholu Pkwy Ownrs. HPD has recorded 45 housing violations here, most recently on May 23, 2026. 21 of the 45 most recent violations are still open. City tax records listed 3 rent-stabilized apartments here in 2024.
- HPD violations
- 45
- DOB violations
- 26
- ECB violations
- 3
- HPD complaints
- 61
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 45
- ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
May 23, 2026
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
May 23, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to west yard at public hall, 1st story
May 23, 2026
Closed — Violation closed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of kick stand attached to fire door leading to north wall at public hall, 1st story
May 23, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at wash basin in the bathroom located at apt 4g, 4th story, 2nd apartment from east at south
May 23, 2026 · Apt 4G
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at upper sash at 3rd window from south at west wall in the 2nd room from east located at apt 4g, 4th story, 2nd apartment from east at south
May 23, 2026 · Apt 4G
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door hinges in the entrance located at apt 4j, 4th story, 1st apartment from west at north
Mar 27, 2025 · Apt 4J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from north at east wall, 1st door frame from north at east wall in the 1st room from north at west located at apt 1j, 1st story, 1st apartment from west at north
Feb 27, 2025 · Apt 1J
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from north located at apt 1j, 1st story, 1st apartment from west at north
Feb 27, 2025 · Apt 1J
Open — Certification postponment denied - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 5th room from north located at apt 1j, 1st story, 1st apartment from west at north
Feb 27, 2025 · Apt 1J
Open — Certification postponment denied
Show 35 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the private hallway located at apt 1j, 1st story, 1st apartment from west at north
Feb 27, 2025 · Apt 1J
Open — Certification postponment denied - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1j, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 1j, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt 1J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective spring hinges of the door in the entrance located at apt 1j, 1st story, 1st apartment from west at north
Feb 25, 2025 · Apt 1J
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Feb 25, 2025
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Feb 25, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 2nd door from south at west wall, west wall in the foyer located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall, 1st window frame from north at east wall in the kitchen located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 4th room from north located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from north located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall, west wall, 1st window frame from north at east wall in the 2nd bathroom from north located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st bathroom from north located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 1st room from north at east located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall in the 1st room from north at west located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from west at north wall in the 1st room from north at west located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from north located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd door from south at west wall, west wall in the foyer located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 4th room from north located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, 1st window frame from north at east wall in the kitchen located at apt 1j, 1st story, 1st apartment from west at north
Jan 31, 2025 · Apt 1J
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 1e, 1st story, 3rd apartment from east at south
Jan 30, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1e, 1st story, 3rd apartment from east at south
Jan 30, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 1st story, 3rd apartment from east at south
Jan 30, 2025 · Apt 1E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 1e, 1st story, 3rd apartment from east at south
Jan 30, 2025 · Apt 1E
Closed — Violation dismissed - BHazardous
Repair the broken or defective connection at sink waste line in the kitchen located at apt 1e, 1st story, 3rd apartment from east at south
Jan 30, 2025 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1j, 1st story, 1st apartment from west at north
Jan 22, 2025 · Apt 1J
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of window guard installed at 2nd window east at south wall/ fire escape window in the 3rd room from east located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, west wall in the bathroom located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective inoperable hinges at door in the entrance located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from west at north wall in the bathroom located at apt 1e, 1st story, 3rd apartment from north at east
Jan 3, 2024 · Apt 1E
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove or cover in a manner approved by the department the peeling lead paint peeling paint window stool center room & west room 5 sty northeast apt 5d morrison 733 7141 er1. , section '' ''
Nov 5, 1990 · Apt 5D
Closed — Violation closed
DOB building violations · 26
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2023
Jun 23, 2024
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 6, 2020
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 17, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 28, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2016
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 13, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 12, 2014
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - dismissed
Show 16 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2013
Dob violation - resolved - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jan 2, 2013
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 26, 2012
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 24, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 4, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Sep 25, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 2, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 16, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 24, 2005
Dob violation - resolved - Elevator elevatorrequired
2p1880
Dec 27, 2002
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed
ECB violations · 3
- Class - 2
Failure to maintain building walls and appurtenances.note:observed vertical crack lines on masonry units of curved parapet at south-east corner of exp #1 east elevation and exp #2 south elevation and crack on m
Nov 3, 2021
Resolve - Class - 1
Failure to maintain building in code compliant manner - retaining wall noted: retaining wall at eastern side which supports upper parking area cited in dob 062112c0701cy/271153 is still in disrepair w/bulging,
Aug 21, 2012 · Penalty $1,000
Resolve - Class - 1
Work does not conform to approved const. documents and/or approved amendments.plan calls for delta to be used on site pipe frame (6ft).missing oppsing angle tiebacks as shown on plan for corner scaffold.rem:con
Jul 29, 2010 · Penalty $1,000
Resolve
Complaints
- Plumbing
Water supply
Jul 3, 2026 · Apt 4G
Open - Plumbing
Toilet
Apr 30, 2026 · Apt 4G
Close - Door/window
Window frame
Apr 25, 2026 · Apt 4G
Close - Heat/hot water
Apartment only
Feb 22, 2025 · Apt 1J
Close - Plumbing
Steam pipe/riser
Jan 29, 2025 · Apt 1E
Close - Appliance
Electric/gas range
Jan 29, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Jan 29, 2025 · Apt 1E
Close - Unsanitary condition
Pests
Jan 29, 2025 · Apt 1E
Close - Plumbing
Toilet
Jan 29, 2025 · Apt 1E
Close - Appliance
Electric/gas range
Jan 29, 2025 · Apt 1E
Close
Show 40 more ↓
- Plumbing
Bathtub/shower
Jan 29, 2025 · Apt 1E
Close - Heat/hot water
Apartment only
Jan 20, 2025 · Apt 1J
Close - Heat/hot water
Apartment only
Dec 5, 2024 · Apt 1J
Close - Heat/hot water
Apartment only
Dec 3, 2024 · Apt 1J
Close - Heat/hot water
Apartment only
Dec 1, 2024 · Apt 1J
Close - Heat/hot water
Apartment only
Nov 30, 2024 · Apt 1J
Close - Plumbing
Bathtub/shower
May 4, 2024 · Apt 1E
Close - Door/window
Window frame
May 4, 2024 · Apt 1E
Close - Plumbing
Toilet
May 4, 2024 · Apt 1E
Close - Unsanitary condition
Pests
Dec 21, 2023 · Apt 1E
Close - Safety
Smoke detector
Dec 21, 2023 · Apt 1E
Close - Unsanitary condition
Pests
Dec 21, 2023 · Apt 1E
Close - Plumbing
Toilet
Dec 21, 2023 · Apt 1E
Close - Safety
Fire escape
Dec 21, 2023 · Apt 1E
Close - Door/window
Window frame
Dec 21, 2023 · Apt 1E
Close - Heat/hot water
Entire building
Dec 12, 2022 · Apt BLDG
Close - Elevator
Maintenance
Aug 8, 2022 · Apt A
Close - Heat/hot water
Apartment only
Jan 22, 2022 · Apt 5J
Close - Heat/hot water
Entire building
Jan 10, 2022 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 24, 2021 · Apt 5J
Close - Heat/hot water
Apartment only
Dec 24, 2021 · Apt 1G
Close - Unsanitary condition
Pests
Sep 5, 2021 · Apt 2B
Close - Unsanitary condition
Pests
Sep 5, 2021 · Apt 2B
Close - Unsanitary condition
Pests
Sep 5, 2021 · Apt 2B
Close - Heat/hot water
Entire building
May 18, 2020 · Apt 7A
Close - General
Signage missing
Jun 6, 2019 · Apt 6D
Close - Heat/hot water
Entire building
Feb 6, 2019 · Apt 1B
Close - Water leak
Slow leak
Dec 15, 2018 · Apt 5J
Close - Heat/hot water
Entire building
Oct 15, 2018 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 27, 2016 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 1, 2015 · Apt 5J
Close - Paint/plaster
Wall
Dec 2, 2014 · Apt 5A
Close - Paint/plaster
Wall
Dec 2, 2014 · Apt 5A
Close - Heating
Heat related
Jan 3, 2010 · Apt 6H
Close - Plumbing
Water-leaks
Jun 22, 2009 · Apt 6H
Close - Plumbing
Water-leaks
Jun 22, 2009 · Apt 6H
Close - Plumbing
Water-leaks
Jun 22, 2009 · Apt 6H
Close - Paint/plaster
Wall
Jun 22, 2009 · Apt 6H
Close - Heating
Heat related
Oct 19, 2008 · Apt 5J
Close - Plumbing
Water-leaks
Aug 14, 2008 · Apt 5J
Close
Sales history
| Date | Price | Type | Units |
|---|---|---|---|
| Aug 12, 2026 | $350,000 | Coops - elevator apartments | — |
| Aug 6, 2026 | $350,000 | Coops - elevator apartments | — |
| Feb 12, 2026 | $245,000 | Coops - elevator apartments | — |
| Feb 11, 2026 | $220,000 | Coops - elevator apartments | — |
| Nov 18, 2025 | $149,000 | Coops - elevator apartments | — |
Building details
- Building type
- Elevator apartment building (D4)
- Year built
- 1939
- Floors
- 6
- Residential units
- 55
- Building area
- 63,763 ft²
- Lot area
- 13,180 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 11
- Block / lot
- 3311 / 138
- Assessed value
- $1,492,200
- Landmark / historic district
- No
HPD registration #204466, last renewed Sep 8, 2025.
Questions about 190 E Mosholu Parkway S
Who owns 190 E Mosholu Parkway S?
The owner of record in NYC Department of City Planning PLUTO data is 190 E Mosholu Pkwy Ownrs.
Does 190 E Mosholu Parkway S have violations?
Yes. NYC HPD has recorded 45 housing violations at this property.
Is 190 E Mosholu Parkway S rent stabilized?
NYC Department of Finance tax bills listed 3 rent-stabilized units here in 2024 (about 5% of its 55 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 190 E Mosholu Parkway S built?
City records list 1939 as the year it was built.
How many apartments are in 190 E Mosholu Parkway S?
It has 55 residential units and 58 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.