208 East Mosholu Parkway
Bronx, NY 10458BBL 2-03309-0068Map
Owner of record: 208 Ross LLC
208 East Mosholu Parkway is an elevator apartment building built in 2022 in Bronx, 10458. It has 19 residential units across 8 floors. The owner of record is 208 Ross LLC. HPD has recorded 38 housing violations here, most recently on August 18, 2026. 9 of the 38 most recent violations are still open. City tax records listed 19 rent-stabilized apartments here in 2024.
- HPD violations
- 38
- DOB violations
- 16
- ECB violations
- 30
- HPD complaints
- 48
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the entire apartment located at apt 3a, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective ventalation at ceiling in the bathroom located at apt 3a, 3rd story, 1st apartment from east at south
Aug 18, 2026 · Apt 3A
Open — Civ14 mailed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Apr 23, 2026 · Apt 5A
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5a, 5th story, 1st apartment from west at north
Apr 23, 2026 · Apt 5A
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7b, 7th story, 1st apartment from south at west
Mar 22, 2026 · Apt 7B
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Mar 22, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system from entrance of the building ato west wall panel in the foyer located at apt 7b, 7th story, 1st apartment from south at west
Mar 16, 2026 · Apt 7B
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at bath tub in the bathroom located at apt 7b, 7th story, 1st apartment from south at west
Mar 16, 2026 · Apt 7B
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 7b, 7th story, 1st apartment from south at west
Mar 4, 2026 · Apt 7B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7b, 7th story, 1st apartment from south at west
Mar 4, 2026 · Apt 7B
Closed — Violation dismissed
Show 28 more ↓
- BHazardous
Properly repair or replace the broken or defective mixing valve at bathtub in the bathroom located at apt 7b, 7th story, 1st apartment from south at west
Feb 25, 2026 · Apt 7B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective buzzer and return voice intercom system from building entrance door up to panel at east wall in the foyer located at apt 7b, 7th story, 1st apartment from south at west
Feb 25, 2026 · Apt 7B
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Feb 21, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox . at public hall, 1st story
Feb 21, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system . at public hall, 1st story
Feb 21, 2026
Open — Nov certified late - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper sign at public hall, 1st story
Feb 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Feb 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper sign
Feb 18, 2026
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Feb 18, 2026
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west
Jan 19, 2026 · Apt 2B
Open — Nov certified late - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Jan 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jan 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system paper sign at public hall, 1st story
Jan 19, 2026
Open — Nov certified late - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mailbox paper sign at public hall, 1st story
Jan 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings paper sign
Jan 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Jan 19, 2026
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Jan 19, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 10, 2026
Open — Nov certified late - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 7a, 7th story, 1st apartment from west at north
Jan 10, 2026 · Apt 7A
Open — Nov certified late - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 11, 2018
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 13, 2017
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 5, 2015
Closed — Violation dismissed
DOB building violations · 16
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 18, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 15, 2024
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 4, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed
Show 6 more ↓
- Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - active - Construction other optional
C-construction other optional
Apr 6, 2010
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed
ECB violations · 30
- Class - 2
At time of inspecton i observed sidewalk shed installed on exposure # 1 without signs or project information panel on the shed parapet, to display the name and the contact information of the owner or the gener
Aug 4, 2023 · Penalty $625
Resolve - Class - 1
At the time of inspection, observed construction workers on supported scaffold doing facade work at exposure 3. i asked workers where is construction superintendent or designated competent person but no one was
Jul 8, 2023
Resolve - Class - 1
At the time of inspection, observed active construction site without after hour variance permit. observed workers doing facade work at exposure 3 on supported scaffold. upon research, the jobsite did not have a
Jul 8, 2023 · Penalty $2,500
Resolve - Class - 1
At the time of inspection, observed workers on supported scaffold doing facade operation at exposure 3. missing guardrails, buried base plates, missing and/or loose planks on working platform were observed. no
Jul 8, 2023
Resolve - Class - 2
Work does not conform to approved construction documents and/or approved amendment.as noted:at time of my inspection observed at elevation opening at each floor a steel lintel beam placed and not shown as the a
Jun 21, 2023 · Penalty $625
Resolve - Class - 2
3304.8/3303.14.1 failure to drain construction site of standing water as noted:at time of my inspection on a construction site,observed in the elevator shaft standing water which may cause structural damage to
Jun 21, 2023 · Penalty $625
Resolve - Class - 1
Noted on nb#220711941 debris throughout site with loose foam noted on sws, scaffolding, and throughout hallways. loose debris create tripping hazard for works and have blown offsite. cited same condition in vio
Jun 17, 2023
Resolve - Class - 1
Noted on job #220711941 foam from facade on 8 story jobsite up to 2 blocks away. debris in adjacent park, playground, neighbors yard, doorway and windows. complainee state slipped on debris injuried knee. no ne
Jun 17, 2023 · Penalty $10,000
Resolve - Class - 1
Noted nb# 220711941 on an active jobsite with work on facade, roof, electric, and plumbing occuring with more than 5 workers present that superintendant or competent person was not on site. multiple violation o
Jun 17, 2023
Resolve - Class - 1
Observed supported pipe scaffold installed and seated on top of sidewalk shed at exposures 1/2/4, approx. 74 ft. upon request for imposed loads letter stating that sidewalk shed can withstand the load none was
Apr 18, 2023 · Penalty $625
Resolve
Show 20 more ↓
- Class - 1
Observed supported pipe scaffold approx. 74 ft at exposure 1/2/3/4 of jobsite. upon review of the site safety plan of the jobsite it was observed that it does not reflect the current conditions of the jobsite.
Apr 18, 2023 · Penalty $625
Resolve - Class - 2
Observed inadequate housekeeping at rear yard exposure 3 of jobsite. there is construction debris and materials throughout the entirety of jobsite. the debris contain large concrete spillage, cmu bricks, black
Apr 18, 2023 · Penalty $625
Resolve - Class - 1
Activesite workers 7-8sty observed 8sty stru.steel build scaffold in lieu of hor.nets in bc3308.6.1.1 missing decked even with the building at the level where the horizontal safe net would otherwise be required
Mar 25, 2023
Resolve - Class - 2
Observed workers hoisting material using beta max system at 7 story near exp 3 upon request from comp.person and cs for manufacture specs in bc3301.6 or pe drawings of equipment none was provided creates hazar
Mar 25, 2023
Resolve - Class - 1
Active site workers at 7-8 story observed exp1,2,3,4 at 7-8 story inadequate vert.nets cable system lose wire unable withstand lateral load 200 pounds in bc3308.5.3 not taught in bc3308.5.4 height of top cable
Mar 25, 2023
Resolve - Class - 2
Observed 7 story exp1 struc.steel near lead edge of an unenclosed perimeter inadequate vertnetting wire cable system in bc3308.5,bc3308.5.4 material not secured not comply with exception material equipment that
Mar 25, 2023
Resolve - Class - 1
Observed missing handrails at stair way 5-7 story hazard creates fall conditions for workers and emergency respondents with no handrail in place to prevent a fall condition leads to injuries or fatal. also note
Mar 25, 2023 · Penalty $2,500
Active - Class - 1
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed nb permit #220711941 expired at 10/01/2022, not renewed. mean they
Oct 11, 2022
Resolve - Class - 1
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed no guard rail on 2nd floor through out, no control access zone for
Oct 11, 2022
Resolve - Class - 2
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed inadequate site safety plan have no over head protection shown on e
Oct 11, 2022
Resolve - Class - 2
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed steel columns are built about 45ft high, steel beams installation
Oct 11, 2022 · Penalty $625
Resolve - Class - 2
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed unsafe pipe scaffold working platform at 2nd floor level, not fully
Oct 11, 2022 · Penalty $1,250
Resolve - Class - 1
Note: observed a 8sty new building under construction at super structure level. workers working on it. also observed steel columns are built about 45ft high, steel beams installation work in progress at 3rd fl
Oct 11, 2022 · Penalty $2,500
Resolve - Class - 1
Note:at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed no hand rail all stairs from 1st floor to 2nd floor & 1st floor to c
Oct 11, 2022
Resolve - Class - 1
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers ( total=4) working on it. also observed 3 worker & competent person present on site, asking for
Oct 11, 2022
Resolve - Class - 2
Observed 8sty new building under construction at super structure level. workers working on it. no sidewalk shed & overhead protection built at exp1, 2, 4 & construction superintendent(cs) not notify dob (3301.1
Oct 11, 2022 · Penalty $2,500
Resolve - Class - 1
Note: at the time of inspection observed a 8sty new building under construction at super structure level. workers working on it. also observed nb permit #220711941 expired at 10/01/2022, not renewed. mean they
Oct 11, 2022
Resolve - Class - 1
After hours wotk without variance permit contrary to 28-105.12.5 as noted at time of inspection observed at new building site active tack welding of steel frame in progress with no after hours permit filed.stop
Aug 27, 2022 · Penalty $625
Resolve - Class - 2
Failure to maintain jobsite fence/fence not painted hunter greencomply w/code
Aug 5, 2022
Resolve - Class - 1
Storage of combustible material-unsafe @time of inspection, i observedcombustible material, consisting of piece of wood, 2 by 4 lumber, plywood, and wooden scatterd in large amounts throughout the entire site,
Oct 17, 2019
Resolve
Complaints
- Door/window
Window frame
Sep 22, 2026 · Apt 3A
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 3A
Close - General
Ventilation system
Sep 22, 2026 · Apt 3A
Close - Door/window
Door
Sep 22, 2026 · Apt 3A
Close - Door/window
Window frame
Aug 12, 2026 · Apt 3A
Close - Paint/plaster
Wall
Aug 12, 2026 · Apt 3A
Close - General
Ventilation system
Aug 12, 2026 · Apt 3A
Close - Door/window
Door
Aug 12, 2026 · Apt 3A
Close - Water leak
Heavy flow
Jul 19, 2026 · Apt 3A
Close - Plumbing
Water supply
Jul 18, 2026 · Apt 3A
Close
Show 38 more ↓
- Paint/plaster
Wall
Jul 14, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jul 14, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
May 21, 2026 · Apt 2B
Close - Door/window
Door
Apr 24, 2026 · Apt 2B
Close - Safety
Carbon monoxide detector
Apr 19, 2026 · Apt 5A
Close - Electric
Wiring
Apr 19, 2026 · Apt 5A
Close - Safety
Smoke detector
Apr 19, 2026 · Apt 5A
Close - Appliance
Refrigerator
Apr 19, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Apr 19, 2026 · Apt 5A
Close - Safety
Window guard broken/missing
Apr 19, 2026 · Apt 5A
Close - Plumbing
Water supply
Apr 19, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Mar 20, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Mar 15, 2026 · Apt 7B
Close - General
Bell/buzzer/intercom
Mar 15, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 7B
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt 7B
Close - Paint/plaster
Wall
Feb 19, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Feb 19, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 19, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Feb 17, 2026 · Apt APT3A
Close - Heat/hot water
Apartment only
Feb 17, 2026 · Apt 7B
Close - Heat/hot water
Apartment only
Feb 13, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Feb 10, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 10, 2026 · Apt 7B
Close - Heat/hot water
Entire building
Feb 8, 2026 · Apt 5A
Close - Paint/plaster
Wall
Feb 8, 2026 · Apt 5A
Close - Flooring/stairs
Floor
Feb 8, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 29, 2026 · Apt 5A
Close - Unsanitary condition
Pests
Jan 29, 2026 · Apt 5A
Close - Paint/plaster
Wall
Jan 29, 2026 · Apt 5A
Close - Heat/hot water
Apartment only
Jan 16, 2026 · Apt 2B
Close - General
Bell/buzzer/intercom
Jan 16, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 8, 2026 · Apt 7A
Close - Heat/hot water
Apartment only
Dec 29, 2025 · Apt 2B
Close - Plumbing
Water supply
Nov 7, 2025 · Apt 2B
Close - Heating
Heat related
Jan 24, 2013 · Apt 5G
Close - Appliance
Sprinker cert
Jul 26, 2004
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2022
- Floors
- 8
- Residential units
- 19
- Building area
- 11,996 ft²
- Lot area
- 2,190 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 11
- Block / lot
- 3309 / 68
- Assessed value
- $1,004,850
- Landmark / historic district
- No
HPD registration #229184, last renewed Aug 24, 2025.
Questions about 208 East Mosholu Parkway
Who owns 208 East Mosholu Parkway?
The owner of record in NYC Department of City Planning PLUTO data is 208 Ross LLC.
Does 208 East Mosholu Parkway have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 208 East Mosholu Parkway rent stabilized?
NYC Department of Finance tax bills listed 19 rent-stabilized units here in 2024 (about 100% of its 19 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 208 East Mosholu Parkway built?
City records list 2022 as the year it was built.
How many apartments are in 208 East Mosholu Parkway?
It has 19 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.