3055 Valentine Avenue
Bronx, NY 10458BBL 2-03309-0023Map
Owner of record: 3055 Valentine Ave LLC
3055 Valentine Avenue is an elevator apartment building built in 2017 in Bronx, 10458. It has 30 residential units across 8 floors. The owner of record is 3055 Valentine Ave LLC. HPD has recorded 105 housing violations here, most recently on October 10, 2026. 37 of the 50 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.
- HPD violations
- 105
- DOB violations
- 11
- ECB violations
- 24
- HPD complaints
- 181
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 105
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Oct 10, 2026 · Apt 3A
Open — Invalid certification - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Oct 10, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 8d, 8th story, 1st apartment from east at south
Oct 10, 2026 · Apt 8D
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 8d, 8th story, 1st apartment from east at south
Oct 10, 2026 · Apt 8D
Open — Violation will be reinspected - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 8d, 8th story, 1st apartment from east at south
Oct 10, 2026 · Apt 8D
Open — Civ14 mailed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Oct 10, 2026 · Apt 3A
Open — Invalid certification - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system wrong information at public hall, 1st story
Oct 10, 2026
Open — Nov certified on time - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Oct 10, 2026 · Apt 3A
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 3a, 3rd story, 1st apartment from west at north
Oct 3, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective lock and assembly , 1st story
Oct 3, 2026
Open — Nov certified on time
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 3, 2026
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at ceiling and all walls in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Oct 3, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door , 1st story
Oct 3, 2026
Closed — Violation closed - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed wire at ceiling in the 1st room from east located at apt 3a, 3rd story, 1st apartment from west at north
Oct 1, 2026 · Apt 3A
Open — Civ14 mailed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30sq feet at ceiling, north and south wall in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Oct 1, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchenette located at apt 3a, 3rd story, 1st apartment from west at north
Oct 1, 2026 · Apt 3A
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 2nd apartment from west at north
Sep 30, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 square feet at ceiling and all walls in the bathroom located at apt 3a, 3rd story, 1st apartment from west at north
Sep 29, 2026 · Apt 3A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3a, 3rd story, 1st apartment from west at north
Sep 29, 2026 · Apt 3A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8b, 8th story, 2nd apartment from west at north
Sep 27, 2026 · Apt 8B
Open — Civ14 mailed - ANon-hazardous
Provide a peep hole in entrance door of the dwelling unit so located so as to permit a person inside the dwelling to view any person outside entrance door .. in the entrance located at apt 8b, 8th story, 2nd apartment from west at north
Sep 27, 2026 · Apt 8B
Open — Civ14 mailed - BHazardous
Remove all obstructions and repair all defects in at waste line at sink in the kitchen located at apt 8b, 8th story, 2nd apartment from south at west
Sep 16, 2026 · Apt 8B
Open — Civ14 mailed - ANon-hazardous
Dept. rules and regs. replace refuse chute warning sign public hall door to service closet or on wall over hopper door at north wall at compactor closet, 8th story
Sep 16, 2026
Open — Nov certified on time - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at roof door at 2nd public hall bulkhead from north, 8th story
Aug 20, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at stair ''a'' door at public hall, 3rd story
Aug 20, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 20, 2026
Open — Nov certified on time - CImmediately hazardous
Properly repair or replace the broken or defective latch and its assembly at door to rear yard at public hall, 1st story
Aug 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door to rear yard at public hall, 1st story
Aug 20, 2026
Open — Nov sent out - BHazardous
Provide cover for electrical outlet at west wall at compactor closet, 1st story
Aug 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at hopper chute door at compactor closet, 1st story
Aug 20, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and its assembly at stair ''a'' door at public hall, 3rd story
Aug 20, 2026
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of electrical wires at circuit breaker box at west wall at compactor closet, 1st story
Aug 20, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Aug 18, 2026 · Apt 4A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Aug 18, 2026
Open — Nov sent out - BHazardous
Remove the illegal fastening double cylinder lock at building entrance door at public hall, 1st story
Aug 18, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 1st apartment from west at north
Aug 18, 2026 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set in the entrance located at apt 8b, 8th story, 2nd apartment from south at west
May 20, 2026 · Apt 8B
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 1st story, 1st apartment from east at south
May 13, 2026 · Apt 1B
Open — Invalid certification - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from east at south located at apt 5d, 5th story, 1st apartment from east at south
Jan 31, 2026 · Apt 5D
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Jan 31, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the 2nd room from north at east located at apt 7d, 7th story, 1st apartment from east at south
Jan 31, 2026 · Apt 7D
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 2nd room from north at east located at apt 7d, 7th story, 1st apartment from east at south
Jan 31, 2026 · Apt 7D
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 12, 2025
Closed — Violation closed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor frame missing at public hall, 1st story
Nov 12, 2025
Closed — Violation closed - BHazardous
Remove all obstructions and repair all defects in waste line at sink in the kitchen located at apt 8b, 8th story, 2nd apartment from south at west
Jul 22, 2025 · Apt 8B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8b, 8th story, 2nd apartment from south at west
Jul 22, 2025 · Apt 8B
Open — Defect letter issued - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130f degrees at fixtures in the kitchen located at apt 1b, 1st story, 1st apartment from east at south
Jan 23, 2025 · Apt 1B
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding the maximum of 130 degrees at bathroom and in the kitchen located at apt 4c, 4th story, 1st apartment from north at east
Jan 23, 2025 · Apt 4C
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4c, 4th story, 1st apartment from north at east
Jan 23, 2025 · Apt 4C
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 23, 2025
Closed — Violation closed
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2021
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 2, 2021
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 12, 2021
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 27, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 19, 2017
Dob violation - dismissed
Show 1 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 5, 2017
Dob violation - dismissed
ECB violations · 24
- Class - 2
Found htp gas fired boilers, model #s7350-250, not operable and in lockout, also found exposed wiring, repair or replace units.
Sep 29, 2026 · Penalty $1,250
Active - Class - 1
Failure to maintain exterior building facade and appurtenances.noted:observed at exp 1(e.elev)broken window glass at 3rd floor level.also observed damaged ac units at multiple locations at exp 1.these condition
Apr 10, 2026 · Penalty $5,000
Resolve - Class - 1
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 east(1) 2 broken window glass at 3rd fl. (2)damaged/defective ac unit wall sleeve covers multi loc.-roo
Apr 3, 2025 · Penalty $12,500
Resolve - Class - 1
Logs of a construction superintendent.at the time of inspection at an 8 story nb,i observed on reviewing log books site superintendent has not fill/completed logs 12/6/19 @10am i spoke with a few workers on sit
Feb 11, 2020
Resolve - Class - 1
No competent person at active jobsite at the time of inspection at a 8story nb,i observed on a active jobsite 4-6 workers onsite working laborers, carpenters,foremans w/o competent person onsite.upon request no
Feb 11, 2020 · Penalty $10,000
Resolve - Class - 2
Failure to provide approved construction documents. nb-job#220446211 on an energy code compliance inspection, failed to provide a complete set of approved/accepted construction documents. en drawings were missi
Nov 15, 2018
Resolve - Class - 2
Failure to institute & maintain safety measure @the time of my insp a 8 story bldg @roof level const work in progress.i observed some workers are working as per site safety plan (atance) @exp#1 have two door is
Jun 28, 2018 · Penalty $5,000
Resolve - Class - 2
Failor to post no smoking signs @the time of my insp of 8 story bldg @roof level const work in progress. i observed some workers are working.i observed'no smoking sign'&'exit'signs are missing from 8th to 6th f
Jun 28, 2018
Resolve - Class - 2
3307.7.7 condition of fence @the time of my insp of a 8 story bldg @roof level const work in progress.i observed some workers are working i observed roted,leaning 2 stappled plywood fence @exp#1,fence is not as
Jun 28, 2018 · Penalty $400
Resolve - Class - 1
Sec. 3307.6.5.4 storage or placement of items on sidewalk shed. at time of inspection of a(propose)8 sty new bldg at 5 sty cmu operations. i observed construction material stored on sidfewalk shed w/o any desig
May 8, 2018 · Penalty $2,500
Resolve
Show 14 more ↓
- Class - 2
Failure to post no smoking signs at construction site. at time of a proposed 8 sty new bldg at 5 sty(phace). i observed at all floors rear stairs(entrance)or any where. no-"no smoking" signs posted.
May 8, 2018
Resolve - Class - 2
Construction superintendent failed to perform duties per code. at timeof inspection observed an active construction site w/cmu walls & rebar on progress,during inspection i ask for superintendent they said not
Apr 11, 2018 · Penalty $2,500
Resolve - Class - 1
Sec. 3303.4.1 slipping & tripping hazard in areas of construction. at time of inspection observed an active construction site w/cmu block walls & rebar on progress,during inspection noted on stair from 1st fl
Apr 11, 2018 · Penalty $2,500
Resolve - Class - 2
Sec. 3309.10 failure to protect or adequately protect adjoining properties. during construction or demolition inadequate roof protection. at time of inspection observed an active construction site w/cmu walls &
Apr 11, 2018
Resolve - Class - 1
Sec. 3301.2 no overhead protection. at time of inspection observed an active construction site w/cmu walls & rebar on progress,during inspection noted there was not overhead protection on all exposure this crea
Apr 11, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to perform inspection and document conditions of existing str uctures adjoining a construction or demolition site in a pre-construction survey. at time of inspection observed a construction site with e
Sep 29, 2017 · Penalty $1,600
Resolve - Class - 2
Construction superintendent fails to maintain and/or make job site logavailable.at the time of inspection observed a construction site withexcavation work in progress,during inspection i asked superintendent
Sep 29, 2017
Resolve - Class - 2
3307.7 failure to provide an adequate construction fence.inadequate noted:fence drawings show 2x4 vertical brace bolted to plywood panel and2x4 stake into ground.at time of inspection observed a construction
Sep 29, 2017
Resolve - Class - 2
3301.2 no guard rail at the time of inspection observed a construction site with excavation work was in progress.during inspection noted atexposure #1 missing guard railsas required by code. remedy:comply wit
Sep 29, 2017
Resolve - Class - 1
Sec: bc 107.7.1. the respondent failed to meet minimum requirements of the code (ac 28-101.2) & provided foundation drawing for job# 220446211 that did not idenity the bottom of adjacent footings for a retainin
Sep 28, 2017 · Penalty $1,600
Resolve - Class - 1
Work w/o a permit demo # 220242342 expired on 1/12/17, observed demo in progress at time of insp. house has been taken down to be at front of house,2nd fl of rear remains. full swo issued and posted. remedy: s
Jan 13, 2017 · Penalty $400
Resolve - Class - 1
Failure to provide sidewalk shed when required. demo of 2story house has been stated(with the front of 1/2 of the 2nd story down) and no sidewalk. house was approx. 20' to 22' high at exp. 1 before demo work st
Jan 13, 2017
Resolve - Class - 2
Failure to provide approved documents/plans design drawing at job sitefor review. a construction fence has been erected at front exp. & rearyard area & no required design drawing for this fence were available
Jan 13, 2017
Resolve - Class - 1
Failure to safeguard public & property affected demolition operations.no overhead construction has been provided at exp. 4 for adj. yard (atrear) house being demolished in approx. 20' to 22' heigh. partial swo
Jan 13, 2017 · Penalty $5,000
Resolve
Complaints
- Heat/hot water
Entire building
Oct 13, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 13, 2026 · Apt 3A
Close - Plumbing
Water supply
Oct 13, 2026 · Apt BLDG
Open - Plumbing
Water supply
Oct 10, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 10, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 9, 2026 · Apt 3A
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 8, 2026 · Apt APT3A
Close - General
Signage missing
Oct 8, 2026 · Apt 3A
Close - Plumbing
Water supply
Oct 8, 2026 · Apt 3A
Open - Unsanitary condition
Mold
Oct 8, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt APT3A
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 7, 2026 · Apt 3A
Close - Plumbing
Water supply
Oct 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 3, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 2, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 1, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 1, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 30, 2026 · Apt 3A
Close - Plumbing
Water supply
Sep 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 29, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 28, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 25, 2026 · Apt BLDG
Close - Plumbing
Water supply
Sep 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 24, 2026 · Apt 6C
Close - Heat/hot water
Entire building
Sep 24, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 24, 2026 · Apt 3C
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Sep 21, 2026 · Apt ALLAPA
Close - Heat/hot water
Entire building
Sep 20, 2026 · Apt 3A
Close - Plumbing
Water supply
Sep 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 20, 2026 · Apt BLDG
Close - Plumbing
Water supply
Sep 20, 2026 · Apt BLDG
Close - Plumbing
Basin/sink
Sep 8, 2026 · Apt 8B
Close - Heat/hot water
Entire building
Aug 22, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Aug 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Aug 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
Aug 17, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Aug 17, 2026 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2017
- Floors
- 8
- Residential units
- 30
- Building area
- 22,320 ft²
- Lot area
- 4,472 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 14
- Block / lot
- 3309 / 23
- Assessed value
- $1,498,050
- Landmark / historic district
- No
HPD registration #228243, last renewed Oct 17, 2025.
Questions about 3055 Valentine Avenue
Who owns 3055 Valentine Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3055 Valentine Ave LLC.
Does 3055 Valentine Avenue have violations?
Yes. NYC HPD has recorded 105 housing violations at this property.
Is 3055 Valentine Avenue rent stabilized?
NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3055 Valentine Avenue built?
City records list 2017 as the year it was built.
How many apartments are in 3055 Valentine Avenue?
It has 30 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.