270 East 203rd Street
Bronx, NY 10458BBL 2-03308-0059Map
Owner of record: Chv Bedford Park Housing Deveopment Fund Corp
270 East 203rd Street is an elevator apartment building built in 2021 in Bronx, 10458. It has 160 residential units across 11 floors. The owner of record is Chv Bedford Park Housing Deveopment Fund Corp. HPD has recorded 56 housing violations here, most recently on September 16, 2026. 14 of the 50 most recent violations are still open. City tax records listed 160 rent-stabilized apartments here in 2024.
- HPD violations
- 56
- DOB violations
- 4
- ECB violations
- 30
- HPD complaints
- 91
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 56
- BHazardous
Abate the nuisance consisting of pests. evidence of observed flies and insects at compactor closet, 2nd story
Sep 16, 2026
Open — Nov sent out - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at compector closet at compactor closet, 2nd story
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet, 2nd story
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2f, 2nd story, 1st apartment from north at east , section ''east''
Sep 16, 2026 · Apt 2F
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 2f, 2nd story, 1st apartment from north at east , section ''east''
Sep 16, 2026 · Apt 2F
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2f, 2nd story, 1st apartment from north at east , section ''east''
Sep 16, 2026 · Apt 2F
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 8e, 8th story, 1st apartment from east at south
Jun 10, 2026 · Apt 8E
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north at east located at apt 8e, 8th story, 1st apartment from east at south
Jun 10, 2026 · Apt 8E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north at east located at apt 8e, 8th story, 1st apartment from east at south
Jun 10, 2026 · Apt 8E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 3b, 3rd story, 4th apartment from east at south
Apr 15, 2026 · Apt 3B
Open — Nov sent out
Show 40 more ↓
- BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from north located at apt 3b, 3rd story, 3rd apartment from east at south
Apr 15, 2026 · Apt 3B
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the public hall and all stairs at all stories
Mar 30, 2026
Open — Nov sent out - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl in the bathroom located at apt 10s, 10th story, 5th apartment from west at north
Mar 30, 2026 · Apt 10S
Open — Nov certified late - BHazardous
Replace the broken or defective faucet handle in the bathroom located at apt 11q, 11th story, 6th apartment from north at east
Dec 11, 2025 · Apt 11Q
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective door handle in the bathroom located at apt 11q, 11th story, 6th apartment from north at east
Dec 11, 2025 · Apt 11Q
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective intercom system located at apt 7h, 7th story, 6th apartment from west at north
Nov 25, 2025 · Apt 7H
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective mechanical venilation system in the bathroom located at apt 7m, 7th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 7M
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches at compactor closet
Nov 25, 2025
Open — Defect letter issued - ANon-hazardous
Properly repair or replace the broken or defective wood entry door in the bathroom located at apt 5m, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5M
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the foyer located at apt 5m, 5th story, 2nd apartment from west at north
Nov 25, 2025 · Apt 5M
Closed — Violation closed - BHazardous
M/d law abate the nuisance consisting of electric bike stored in apartment. located at apt 7k, 7th story, 4th apartment from west at north
Nov 25, 2025 · Apt 7K
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 3l, 3rd story, 3rd apartment from south at west
Jul 25, 2025 · Apt 3L
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 3l, 3rd story, 3rd apartment from south at west
Jul 25, 2025 · Apt 3L
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4m, 4th story, 2nd apartment from west at north
Jun 29, 2025 · Apt 4M
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3j, 3rd story, 5th apartment from west at north
Jun 29, 2025 · Apt 3J
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jun 29, 2025
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 16, 2025
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 7th story
May 8, 2025
Closed — Violation closed - IInformation / order
Apts have been vacated by this department and cannot be reoccupied until so ordered after proof of compliance for apts south 1 apartment # 8e under vacate order # 259112 ( posted date 1/10/2025 ) in the entire apartment located at apt, 8th story
Jan 10, 2025
Closed — Violation closed - ANon-hazardous
Properly repair or replace the broken or defective door chime in the entrance located at apt 7q, 7th story, 5th apartment from south at west
Dec 30, 2024 · Apt 7Q
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of fire damage in the entire apartment located at apt 8e, 8th story, 1st apartment from east at south
Dec 27, 2024 · Apt 8E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 7f, 7th story, 1st apartment from north at east
Dec 27, 2024 · Apt 7F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 7f, 7th story, 1st apartment from north at east
Dec 27, 2024 · Apt 7F
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 6e, 6th story, 1st apartment from east at south
Dec 27, 2024 · Apt 6E
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and south wall at public hall, 7th story
Dec 27, 2024
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and south wall at public hall, 7th story
Dec 27, 2024
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the bathroom located at apt 5e, 5th story, 1st apartment from east at south
Dec 27, 2024 · Apt 5E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the foyer located at apt 7f, 7th story, 1st apartment from north at east
Dec 27, 2024 · Apt 7F
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 3, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 9, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Mar 9, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Feb 17, 2022
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Feb 17, 2022
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 19, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 19, 2021
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 2, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Apr 2, 2021
Closed — Violation closed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 28, 2019
Closed — Violation closed - BHazardous
Repair or replace the smoke detector missing located at apt 1, 1st story, 1st apartment from east at south
Feb 5, 2018 · Apt 1
Closed — Violation closed
DOB building violations · 4
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2024
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2024
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Aug 14, 2013
Dob violation - dismissed
ECB violations · 30
- Class - 1
Failed to notify the dept of an incident that resulted in a fatality or injury.note a worker was removing stagnant water in the hoist pit.worker was found laying in the pit.worker suffered back pain.was taken t
Feb 24, 2023 · Penalty $1,250
Resolve - Class - 2
Note: at the time of inspection as per site safety manager, worker slipped/tripped when cleaning water in hoist pit area, went to hospital by ambulance with back pain. observed inadequate housekeeping condition
Jan 17, 2023
Resolve - Class - 1
Note: as per site safety manager, worker slipped/tripped when cleaning water in hoist pit area, went to hospital by ambulance with back pain. observed inadequate content in pre-shift safety meeting, nothing men
Jan 17, 2023 · Penalty $5,000
Resolve - Class - 1
Bc3314.3.1,bc3314.14,bc1604.2 deficient design-respondent,reg design prof,failed to meet min requirements of bc3314.3.1,bc3314.14,bc1604.2 in outrigger (thrust out) scf app filed under prof cert job x00539787.o
Apr 5, 2022 · Penalty $5,000
Resolve - Class - 1
Bc3314.3.3;bc3314.14 deficient drawings-job x00539787,prof certified for outrigger (thrust out) scf audited&found to have significantly missing info,deficiencies&questionable structural specification.needle bea
Mar 17, 2022 · Penalty $2,500
Resolve - Class - 1
Work doesnt conform to approved const docs &or amendments-sws,pipe scf&needle beams on all exps(1,2,3,4) atoi@11stynb,i observed active site&active pipe scf,sws 4' ext bldg side l of entire sw,pipe scf has 8tru
Mar 7, 2022 · Penalty $625
Resolve - Class - 2
Work doesnt conform to approved const docs &or amendments,ssps.atoi@11stynb i observed while reviewing ssp missing.pipe scf&needle beams on all exps maintaining to site conditions.upon request for new/amended s
Mar 7, 2022
Resolve - Class - 1
Bc3303.4.1 sidewalk maintenance.note:at time of inspection of 11 story new building construction job site observed large cracks and voids onsidewalk of exp #1.cracks and voids constitute slippping,tripping and
Dec 3, 2021 · Penalty $625
Resolve - Class - 2
Bc3308.5 vertical safety netting systems maintenance.note:at time of inspection of 11 story active new building construction job site observed loose cables and untaut wire cables unsecured netting throughout fl
Dec 3, 2021
Resolve - Class - 1
Failure to notify the department of an accident/incident that resultedin a fatality or an injury.note:a worker lost balance and fell from eighth to seventh floor.the worker was taken to a hospital for treatment
Nov 24, 2021
Resolve
Show 20 more ↓
- Class - 1
Failure to institute and maintain safety measures at jobsite.at time of inspection respondent where an iron worker fell from the 8th floor the 7th floor and was taken to the hospital.the inspection reveal that
Oct 7, 2021 · Penalty $625
Resolve - Class - 1
3303.12.2.2 failure to keep hoist in readiness.at time of inspection responding to an incident where an iron worker fell from the 8th floor to the 7th floor was taken to the hospital.the inspection reveal that
Oct 7, 2021 · Penalty $625
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no guardrails on 7th floor stair. noted: at time of inspection of a proposed 11 story nb active site at 7 & 8 floor level. i obs
Oct 4, 2021 · Penalty $2,500
Resolve - Class - 2
Pedestrian protection does not meet code specifications-no high visibility markings at exp #1. noted: at time of inspection of a proposed 11 story nb active site. i observed sidewalk shed in place at exp #1. si
Oct 4, 2021 · Penalty $2,400
Resolve - Class - 1
Work does not conform to approved construction documents and/or approved amendments-work contrary to site safety plan. noted: at time of inspection of a proposed 11 story nb. at 7 & 8 floor level i observed adj
Oct 4, 2021 · Penalty $2,500
Resolve - Class - 1
Work contrary to const doc note:atoi observed 11stynb under const@2fl level,workers working on it.also observed they removed about 3'x4' existing reinforced concrete foundation [email protected] per design drawing o
Jul 13, 2021 · Penalty $625
Resolve - Class - 1
Demo work w/o permit note:atoi observed 11stynb under const@2fl level.workers working on it.also observed cutting existing reinforced concrete foundation wall (20"thick) about 3'w&4'd on 30'l existing exposed r
Jul 13, 2021
Resolve - Class - 1
Bc3301.2 missing rebar caps note:atoi observed 11stynb under [email protected] working on it.also observed uncapped rebar various location on cellar level.creating hazard of impalement w/uncapped rebars on
Jul 13, 2021 · Penalty $625
Resolve - Class - 1
Work contrary to sitesafety plan note:atoi observed 11stynb under const@2fl level.workers working on it.also observed as per sitesafety plan@exp1 const fence w/sws supposed to go inside property line about3' st
Jul 13, 2021 · Penalty $625
Resolve - Class - 1
Inadequate housekeeping note:atoi observed 11stynb under const@2fl level.workers working on it.also observed inadequate housekeeping severalarea on jobsite.observed discarded fresh cement concrete on grnd way t
Jul 13, 2021 · Penalty $625
Resolve - Class - 1
Bc 3304.4.4 failure to provide guardrail system or solid encose aroundopen and accessibles sides of excavation.at the time of my inspection of approved 11 story new building i observed an excavation with no gua
Feb 8, 2021 · Penalty $2,500
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #35013719l issued on 5/18/13 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Jul 30, 2014 · Penalty $800
Resolve - Class - 2
Failure to comply with the commissioner's order to file a certificate of correction with the dob for notice of violation #35013719l issued on 05/18/13 pursuant to 28-204.4 & 1rcny 102-01.rem:file a certificate
Jun 6, 2014 · Penalty $800
Resolve - Class - 1
New bldg or open lot occupied w/o a valid c of o. note: temporary c ofo w/#200847673t001 effective 10-26-06 expired on 1-24-07. new bldg currently occupied. remedy: obtain valid c of o.
May 18, 2013 · Penalty $800
Resolve - Class - 2
New building on open lot occupied without a valid c of o; note above premises occupied and temporary c of o #200847675 t00l has expired on 1/24/2007. rem obtain a valid c of o.
Oct 2, 2009 · Penalty $800
Resolve - Class - 1
New bldg occupied w/o a valid c of o note: temp c of o 200847675t001 exp 01/24/2007 & bldg is occupied. rem: obtain c of o.
May 15, 2009 · Penalty $800
Resolve - Class - 2
Bldg occupied w/o a valid c of o. tco #200847673t001 expired 1.24.07. remdedy: obtain a valid c of o or discontine illegal occupancy.
Nov 25, 2008 · Penalty $300
Resolve - Class - 1
New bldg or open lot occupied w/o a valid c of o noted the current temp c of o c/o 200847673t001 exp on 1/24/07 remedy: obtain a valid c of o
Oct 23, 2008 · Penalty $800
Resolve - Hazardous
Violation of parking zoning regulations in a residential district. residential district is r8. at time of inspection on ford mini van nys license plate # dhw-9890 is parked on paved front yard. curb is uncut.
Jul 10, 2007
Resolve - Hazardous
Contrary to approved plans approved plans dwg #a-2 basement floor plancall for garage inside the house instead change it to a room stop all work on the garage area remedy:conform to approved plans or amend pla
Sep 28, 2004 · Penalty $500
Resolve
Complaints
- Door/window
Door
Sep 19, 2026 · Apt 6K
Close - Door/window
Door frame
Sep 19, 2026 · Apt 6K
Close - Door/window
Door
Sep 19, 2026 · Apt 6K
Close - Safety
Window guard broken/missing
Sep 19, 2026 · Apt 6K
Close - Door/window
Window frame
Sep 4, 2026 · Apt 2F
Close - Water leak
Slow leak
Sep 4, 2026 · Apt 2F
Close - Unsanitary condition
Garbage/recycling storage
Sep 1, 2026 · Apt BLDG
Close - Elevator
Maintenance
Sep 1, 2026 · Apt BLDG
Close - Electric
Power outage
Aug 11, 2026 · Apt BLDG
Close - Door/window
Door frame
Aug 11, 2026 · Apt 8E
Close
Show 40 more ↓
- Door/window
Door
Aug 6, 2026 · Apt 6K
Close - Plumbing
Bathtub/shower
Aug 6, 2026 · Apt 6K
Close - Electric
No lighting
Aug 6, 2026 · Apt 6K
Close - Paint/plaster
Ceiling
Aug 6, 2026 · Apt 6K
Close - General
Bell/buzzer/intercom
Aug 6, 2026 · Apt 6K
Close - Door/window
Door
Aug 6, 2026 · Apt 6K
Close - Water leak
Heavy flow
Aug 1, 2026 · Apt 2S
Close - Door/window
Door frame
Aug 1, 2026 · Apt 8E
Close - Plumbing
Water supply
Jul 30, 2026 · Apt 9S
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt 7G
Close - Water leak
Damp spot
Jul 30, 2026 · Apt 7G
Close - Heat/hot water
Entire building
Jul 29, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Jul 26, 2026 · Apt 3K
Close - General
Bell/buzzer/intercom
Jun 5, 2026 · Apt INTERC
Close - Unsanitary condition
Pests
May 18, 2026 · Apt 9B
Close - Unsanitary condition
Garbage/recycling storage
May 18, 2026 · Apt 9B
Close - Paint/plaster
Ceiling
May 6, 2026 · Apt 8E
Close - Unsanitary condition
Garbage/recycling storage
Apr 22, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Apr 14, 2026 · Apt 3B
Close - Flooring/stairs
Floor
Mar 23, 2026 · Apt 3B
Close - Unsanitary condition
Sewage
Mar 8, 2026 · Apt 10S
Close - Plumbing
Toilet
Mar 8, 2026 · Apt 10S
Close - Water leak
Slow leak
Mar 8, 2026 · Apt 10S
Close - Plumbing
Water supply
Feb 21, 2026 · Apt 8E
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 25, 2026 · Apt BLDG
Close - Flooring/stairs
Floor
Dec 24, 2025 · Apt 3B
Close - Heat/hot water
Apartment only
Dec 5, 2025 · Apt 5J
Close - Heat/hot water
Entire building
Sep 29, 2025 · Apt 2J
Close - Heat/hot water
Entire building
Sep 13, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 27, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 20, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 19, 2025 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 15, 2025 · Apt 9B
Close - Unsanitary condition
Garbage/recycling storage
Jul 14, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Jul 7, 2025 · Apt 9S
Close - Heat/hot water
Apartment only
Jul 7, 2025 · Apt 10H
Close - Heat/hot water
Entire building
Jun 30, 2025 · Apt BLDG
Close - Plumbing
Water supply
Jun 30, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2021
- Floors
- 11
- Residential units
- 160
- Building area
- 134,829 ft²
- Lot area
- 20,000 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 11
- Block / lot
- 3308 / 59
- Assessed value
- $10,692,000
- Landmark / historic district
- No
HPD registration #228994, last renewed Oct 21, 2025.
Questions about 270 East 203rd Street
Who owns 270 East 203rd Street?
The owner of record in NYC Department of City Planning PLUTO data is Chv Bedford Park Housing Deveopment Fund Corp.
Does 270 East 203rd Street have violations?
Yes. NYC HPD has recorded 56 housing violations at this property.
Is 270 East 203rd Street rent stabilized?
NYC Department of Finance tax bills listed 160 rent-stabilized units here in 2024 (about 100% of its 160 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 270 East 203rd Street built?
City records list 2021 as the year it was built.
How many apartments are in 270 East 203rd Street?
It has 160 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.