2910 Grand Concourse
Bronx, NY 10458BBL 2-03305-0032Map
Owner of record: Lma Realty Mgmt Corp
2910 Grand Concourse is an elevator apartment building built in 1939 in Bronx, 10458. It has 31 residential units across 6 floors. The owner of record is Lma Realty Mgmt Corp. HPD has recorded 163 housing violations here, most recently on October 31, 2025. 10 of the 50 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.
- HPD violations
- 163
- DOB violations
- 49
- ECB violations
- 16
- HPD complaints
- 139
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 163
- ANon-hazardous
Properly repair with similar material the broken or defective at south wall in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Properly secure the loose door knob in the entrance located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at shower in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Repair leaky water closet flush pipe connection .. in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from north located at apt 3e, 3rd story, 1st apartment from north at east
Oct 31, 2025 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door from street to vestibule at 1st story public hall at public hall
Oct 25, 2025
Closed — Violation closed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes [flower pots] at 5th story balcony at 1st fire escape from north at west exterior wall at fire escape
Oct 25, 2025
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in the bathtub in the bathroom located at apt 1e, 1st story, 1st apartment from east at south
Oct 23, 2025 · Apt 1E
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Remove the illegal fastening consisting of unacceptable electromagnetic locking device at building vestibule door , 1st story
Oct 15, 2025
Open — Nov sent out - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanical heavy duty lock set at building vestibule door , 1st story
Oct 15, 2025
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Oct 15, 2025
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Jun 5, 2025
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioner protruding beyond window sill at 3rd. and 5th. sty. balconies at building front
Feb 16, 2024
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department walls and ceiling, in the entire apartment located at apt 1e, 1st story, 1st apartment from north at east
Jan 30, 2024 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from north at east
Oct 18, 2023 · Apt 4A
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 18, 2023
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and north wall in the kitchen located at apt 4a , 4th story, 2nd apartment from north at east
Oct 18, 2023 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling, south and north walls in the 1st room from north located at apt 4a , 4th story, 2nd apartment from north at east
Oct 18, 2023 · Apt 4A
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the foyer located at apt 4a , 4th story, 2nd apartment from north at east
Oct 18, 2023 · Apt 4A
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 6e, 6th story, 1st apartment from north at east
Jan 24, 2023 · Apt 6E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 24, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 6e, 6th story, 1st apartment from north at east
Jan 24, 2023 · Apt 6E
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6e, 6th story, 1st apartment from north at east
Jan 24, 2023 · Apt 6E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak the ceiling at public hall, 1st story
Aug 4, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling and west wall at bulkhead at public hall, 6th story
Aug 4, 2022
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling and west wall at bulkhead at public hall, 6th story
Aug 4, 2022
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of household items (refrigerator doors detached) at public hall, 1st story
Jul 22, 2022
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective in the entrance located at apt 6c, 6th story, 1st apartment from west at north
Jul 22, 2022 · Apt 6C
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... approx 6 sq ft at ceiling, approx 12 sq ft at west wall, approx 20 sq ft at south wall at public hall, 1st story
Jun 13, 2022
Open — Defect letter issued - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling, north, south and west wall at public hall, 1st story
Jun 13, 2022
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north, south and west wall at public hall, 1st story
Jun 13, 2022
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story
Jun 13, 2022
Closed — Violation dismissed - BHazardous
Properly secure the loose 6th marble tread from bottom at public hall stairs, 5th story
Jun 13, 2022
Closed — Violation dismissed - BHazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by submitting required supporting documentation and affidavits for apartment located at apt 4d, 4th story, 2nd apartment from west at north
May 29, 2022 · Apt 4D
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2; wg to replace = 0; wg to repair = 2; in the entire apartment located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation dismissed - BHazardous
Replace with new the missing electrical outlet plate cover at north wall in the 2nd room from north at west located at apt 6c, 6th story, 1st apartment from west at north
May 29, 2022 · Apt 6C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from east at south wall in the foyer located at apt 6c, 6th story, 1st apartment from west at north
May 29, 2022 · Apt 6C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from north at east wall in the 3rd room from north at east located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from north at east wall in the 3rd room from north at east located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from north at east, the 2nd bathroom from north at east located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall in the foyer located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the foyer located at apt 6c, 6th story, 1st apartment from west at north
May 29, 2022 · Apt 6C
Open — First no access to re- inspect violation - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the 1st room from north at west located at apt 6c, 6th story, 1st apartment from west at north
May 29, 2022 · Apt 6C
Closed — Violation closed - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st door frame from south at west wall in the foyer located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... 4 sq/ft at the window frame from north at east wall in the 1st bathroom from north located at apt 6c, 6th story, 1st apartment from west at north original violation 15190041 issued 29-may-22 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).
May 29, 2022 · Apt 6C
Open — Defect letter issued - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective .... in the entrance located at apt 5a, 5th story, 2nd apartment from north at east
May 29, 2022 · Apt 5A
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak above the ceiling in the 4th room from north located at apt 6c, 6th story, 1st apartment from west at north
May 29, 2022 · Apt 6C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from north located at apt 6c, 6th story, 1st apartment from west at north
May 29, 2022 · Apt 6C
Closed — Violation dismissed
DOB building violations · 49
- Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2021
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 26, 2020
Dob violation - resolved - Elevator elevatorrequired
Cease use
Feb 14, 2018
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2016 inspection/test
Sep 15, 2017
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 22, 2017
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2015 inspection/test
Dec 1, 2016
Dob violation - active - Residential elevator periodic inspection/test elevatorrequired
Failure to perform category 5 inspection
Jun 1, 2016
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 10, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 11, 2015
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2014 inspection/test
Jun 10, 2015
Dob violation - active
Show 39 more ↓
- Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2013 inspection/test
Oct 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 23, 2014
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2012 inspection/test
Mar 31, 2014
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 18, 2013
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2011 inspection/test
Oct 1, 2012
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 4, 2012
Dob violation - resolved - Elevator annual inspection / test elevatorrequired
Violation issued to elevator-failure to file category 1 2010 inspection/test
Dec 13, 2011
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 28, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2010
Dob violation - resolved - Construction other optional
C-construction other optional
Mar 29, 2010
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 2, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 13, 2008
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 3, 2008
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 6, 2007
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Apr 2, 2007
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 20, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 8, 2006
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Oct 1, 2005
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Apr 6, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
May 1, 2003
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 21, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 26, 2002
Dob violation - dismissed - Elevator elevatorrequired
2p2000
Feb 22, 2002
Dob violation - resolved - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Feb 19, 2002
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Mar 10, 2000
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatorrequired
2p2000
Apr 27, 1999
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - active
ECB violations · 16
- Class - 1
Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection,i observed at exp#1 south cracked brick/spalling mortar joints at parapet level multi loc.cracked stone masonry water/table
Mar 4, 2026 · Penalty $5,000
Active - Class - 1
Failure to provide unobstructed exit passageway.note:at time of inspection,i observed at exp#1 south,#2 west,#3 north multi objects obstructing fire escape landing decks multi lot.exp#3 north has metal projecti
Mar 4, 2026 · Penalty $2,500
Active - Class - 1
42m07,02x10 and 59bb15 no door lock monitoring installed in controlleras mandated by 3.10.12 of appendix k3 of 2014 nyc building code.remedyfile application & install.repair alarm in car.reform brake maintananc
Mar 31, 2022 · Penalty $1,250
Resolve - Class - 2
Failure to comply with commissioner's order contained in summons/viol ation #32097857l issued on 10/16/18 and to file a certificate of correction pursuant to 28.201.1 and 1rcny 102-01(d)(2). an acceptable cert
Jul 10, 2019 · Penalty $1,250
Resolve - Class - 2
B254,15,50,50a,50b. 50-need to seal around brick work for flue pipe. 50a-all controls need to be pipe in on separate connections with pig tails. 50b-need to install antisiphon with ball.
Oct 16, 2018 · Penalty $625
Resolve - Class - 1
5x10,21m7,2x10,7b1,60x10,59bb5,99bb5,41l10,40o02,3b7,68b7-5x10)inoperative door zone restrictor, this is a device to render the safety of the public must repair back to service immediately. 21)basement interloc
Sep 4, 2018 · Penalty $1,250
Resolve - Class - 2
50a-b. rear flame sight glass missing. (50a)oil lines shall not be supported by other piping. (50b)debris & combustibles in boiler room.
Jul 2, 2018 · Penalty $655
Active - Class - 2
02x10,100m10,70o02,71x10,72m10,41d06,40m07. 40m- missing elevator maintenance co. phone # and maintenance log.
Sep 29, 2011 · Penalty $500
Resolve - Class - 2
05j01,12q03,03i10,11i10,08v01,41d06,99m5,21m7. 05j- adjust gap car door leading edge when closed. 12q- provide guard cab lights. 03i- repairholes top of cab wells. 11i- repair cover hole car station. 08v- adjus
Oct 4, 2010 · Penalty $500
Resolve - Class - 3
Failure to maintain bldg in code-compliant manner. found that oil tankfor address above is not secured to ground. beyond owners control found that ground water had undermined location of oil tank and popped it
Mar 29, 2010 · Penalty $500
Resolve
Show 6 more ↓
- Non-hazardous
8v1/10h11/11i10/39o2/40i11/42q3/58h11/59i10/66o2/84m7 11-cover hole oncar button station 84- missing toe guard-provide.
May 22, 2006 · Penalty $2,500
Resolve - Non-hazardous
07x10/11l10/12q03/11x10/40d06/21q03/34q03/84m07/66o02/20i11/17m07/05l10 11l10- providing cover for hole, wires exposed. 11x10- not responding to 5th fl car call.21-2nd floor 34q03- top of controller to terminal
Aug 25, 2004 · Penalty $2,500
Resolve - Non-hazardous
75u05,07x11,57o02.
May 9, 2001 · Penalty $350
Resolve - Non-hazardous
8302/31q3/35p7/21x11
Feb 5, 2000
Resolve - Non-hazardous
08v31q03o57o11x 31 q electrical wiring & all boxes 03-0 clean top of car.
Jul 11, 1997 · Penalty $1,000
Resolve - Non-hazardous
37#,52#,40r,37-adjust select floor stops.52-replace brake pads&adjust. 40-perform 5 yr test.
Dec 26, 1990 · Penalty $75
Resolve
Complaints
- Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 24, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Dec 3, 2025 · Apt BLDG
Close - Plumbing
Water supply
Dec 3, 2025 · Apt BLDG
Close - Water leak
Damp spot
Oct 27, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Oct 27, 2025 · Apt 3E
Close - Plumbing
Toilet
Oct 27, 2025 · Apt 3E
Close - Plumbing
Bathtub/shower
Oct 27, 2025 · Apt 3E
Close - Paint/plaster
Radiator
Oct 27, 2025 · Apt 3E
Close
Show 40 more ↓
- Heat/hot water
Entire building
Oct 27, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Oct 27, 2025 · Apt 3E
Close - Heat/hot water
Entire building
Oct 26, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 14, 2025 · Apt 6B
Close - Heat/hot water
Entire building
Feb 17, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 13, 2024 · Apt 2C
Close - Heat/hot water
Entire building
Nov 10, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2024 · Apt BLDG
Close - Electric
No lighting
Dec 15, 2023 · Apt 2E
Close - Heat/hot water
Entire building
Oct 23, 2023 · Apt 1E
Close - Heat/hot water
Entire building
Oct 16, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 26, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 17, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 12, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 1, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 29, 2021 · Apt 6B
Close - Heat/hot water
Entire building
Jan 19, 2021 · Apt 6A
Close - Unsanitary condition
Mold
Jan 14, 2021 · Apt 2B
Close - Appliance
Refrigerator
Jan 14, 2021 · Apt 2B
Close - Door/window
Window frame
Jan 14, 2021 · Apt 2B
Close - Plumbing
Basin/sink
Jan 14, 2021 · Apt 2B
Close - Paint/plaster
Ceiling
Jan 14, 2021 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 10, 2021 · Apt 6C
Close - Heat/hot water
Entire building
Dec 24, 2020 · Apt 5F
Close - Heat/hot water
Apartment only
Dec 21, 2020 · Apt 4A
Close - Heat/hot water
Entire building
Dec 21, 2020 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 8, 2020 · Apt 4C
Close - Heat/hot water
Entire building
Oct 29, 2020 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 27, 2020 · Apt 6C
Close - Heat/hot water
Entire building
Feb 21, 2020 · Apt 6C
Close - Heat/hot water
Apartment only
Nov 25, 2019 · Apt 6C
Close - Heat/hot water
Apartment only
Nov 22, 2019 · Apt 6C
Close - Unsanitary condition
Mold
Oct 24, 2019 · Apt 1D
Close - Safety
Carbon monoxide detector
Oct 24, 2019 · Apt 1D
Close - Safety
Window guard broken/missing
Oct 24, 2019 · Apt 1D
Close - Heat/hot water
Entire building
Oct 21, 2018 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1939
- Floors
- 6
- Residential units
- 31
- Building area
- 34,572 ft²
- Lot area
- 7,500 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 15
- Block / lot
- 3305 / 32
- Assessed value
- $575,550
- Landmark / historic district
- No
HPD registration #205403, last renewed Sep 22, 2025.
Questions about 2910 Grand Concourse
Who owns 2910 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is Lma Realty Mgmt Corp.
Does 2910 Grand Concourse have violations?
Yes. NYC HPD has recorded 163 housing violations at this property.
Is 2910 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 97% of its 31 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2910 Grand Concourse built?
City records list 1939 as the year it was built.
How many apartments are in 2910 Grand Concourse?
It has 31 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.