219 East 196 Street
Bronx, NY 10458BBL 2-03304-0080Map
Owner of record: 219 LLC
219 East 196 Street is a walk-up apartment building built in 1923 in Bronx, 10458. It has 54 residential units across 5 floors. The owner of record is 219 LLC. HPD has recorded 1,030 housing violations here, most recently on October 14, 2026. 48 of the 50 most recent violations are still open. City tax records listed 54 rent-stabilized apartments here in 2024.
- HPD violations
- 1,030
- DOB violations
- 9
- ECB violations
- 5
- HPD complaints
- 2,301
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,030
- CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4j, 4th story, 1st apartment from east at south
Oct 14, 2026 · Apt 4J
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north , section at west
Oct 14, 2026 · Apt 1D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 1st story, 1st apartment from west at north , section at west
Oct 14, 2026 · Apt 1D
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Oct 14, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 4th story, 2nd apartment from east at south , section at west
Oct 14, 2026 · Apt 4B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color all walls and ceiling in the kitchen located at apt 1g, 1st story, 1st apartment from west at north
Oct 6, 2026 · Apt 1G
Open — Nov sent out - BHazardous
Properly secure the loose upper cabinets at north wall in the kitchen located at apt 1g, 1st story, 1st apartment from west at north
Oct 6, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 1g, 1st story, 1st apartment from west at north
Oct 6, 2026 · Apt 1G
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... observed less than 10 sq ft at ceiling and west wall in the bathroom located at apt 1g, 1st story, 1st apartment from west at north
Oct 6, 2026 · Apt 1G
Open — Notice of issuance sent to tenant
Show 40 more ↓
- CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Oct 6, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1g, 1st story, 1st apartment from west at north
Oct 6, 2026 · Apt 1G
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, baseboard at west wall, 1st door frame from west at north wall, 1st door frame from south at west wall, north wall, south wall, east wall, west wall, 1st window frame from east at south wall, 2nd window frame from east at south wall in the 4th room from north at east located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st closet from west at north wall door, 1st closet from west at north wall door frame, 2nd closet from west at north wall door, 2nd closet from west at north wall door frame, 1st door frame from west at north wall, north wall, east wall in the 4th room from north at west located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall, north wall, east wall, 1st window frame from south at west wall in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, ceiling, 1st closet from north at east wall door, 1st closet from north at east wall door frame, 2nd closet from north at east wall door, 2nd closet from north at east wall door frame, west wall in the foyer located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the private hallway located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at north wall, 1st door frame from east at south wall, 1st door frame from north at east wall, north wall, east wall, 1st window frame from south at west wall, 2nd window frame from south at west wall in the 2nd room from north located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, 1st window frame from south at west wall in the kitchen located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall
Oct 3, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household items at floor landing at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at ceiling at public hall, 1st story
Oct 3, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel glaze at bathtub in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the east wall in the foyer located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, east wall in the kitchen located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4k, 4th story, 2nd apartment from east at south , section ''east'', at east
Oct 3, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4k, 4th story, 2nd apartment from east at south , section at east
Sep 28, 2026 · Apt 4K
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Sep 28, 2026
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4k, 4th story, 2nd apartment from east at south , section at east
Sep 28, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 1st apartment from east at south , section at west
Sep 28, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section at east
Sep 24, 2026 · Apt 4K
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section at east
Sep 24, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4k, 4th story, 2nd apartment from east at south , section at east
Sep 24, 2026 · Apt 4K
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective west retaining wall at west yard
Jul 19, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). east wall in the foyer located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the west wall at public hall, 3rd story, section ''east''
Jun 28, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant materials at west wall at public hall, 3rd story, section ''east''
Jun 28, 2026
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at east wall in the foyer located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Civ14 mailed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the kitchen located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). baseboard at south wall in the 2nd room from north located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, baseboard at west wall, north wall, west wall, 1st window frame from south at west wall in the kitchen located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Cleanse to the satisfaction of this department the dirt and debris at floor landing at public hall, 3rd story, section ''east''
Jun 28, 2026
Open — Not complied with - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from north at east wall, north wall, east wall, west wall, 1st window frame from south at west wall in the bathroom located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, east wall, west wall in the 2nd room from north located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, west wall in the foyer located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall, west wall in the private hallway located at apt 4k, 4th story, 2nd apartment from east at south , section ''east''
Jun 28, 2026 · Apt 4K
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls and ceiling in the 2nd room from north at west located at apt 3d, 3rd story, 1st apartment from west at north , section at west
May 19, 2026 · Apt 3D
Closed — Violation dismissed
DOB building violations · 9
- Construction other optional
Requesting a structural stability report due to vertical and horizontal cracks with loose and missing concrete at exposure 2 retaining wall.
Jul 21, 2026
Dob violation - dismissed - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Dec 15, 2022
Dob violation - dismissed - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Construction other optional
C-construction other optional
Sep 18, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 5
- Class - 1
Noted at time of inspection debris from property has accumulated and is partially blocking fire escape passageway, remove obstruction
Jul 20, 2026 · Penalty $2,500
Resolve - Class - 1
At the time of inspection, the retaining wall located on the right side of the property (exposure #2) was observed to be in a state of disrepair. the wall exhibited both horizontal and vertical cracking, with l
Jul 20, 2026 · Penalty $2,500
Active - Class - 2
Observed on the fourth floor in apartment 4k in the kitchen no gas appliance valve installed behind stove which is contrary to code section fgc 409.5, repair and/or replace
Apr 3, 2025 · Penalty $1,250
Active - Class - 2
50a 50b. 50a-spillage of #6 fuel oil from ruptured fill ling to 5000 gallon storage tank in basement. spillage along underground pipe run in courtyard. sand & other absorbent material applied to spilled fuel oi
Mar 18, 2011 · Penalty $250
Resolve - Class - 2
B201. emergency response to spillage of #6 fuel oil from a ruptured fill line in the courtyard @ the referenced location assigned contractor performed emergency repairs by replacing over 50ft of 3 inch piping u
Mar 18, 2011 · Penalty $800
Resolve
Complaints
- Heat/hot water
Entire building
Oct 13, 2026 · Apt 4J
Close - Plumbing
Basin/sink
Oct 13, 2026 · Apt 4J
Open - Flooring/stairs
Floor
Oct 13, 2026 · Apt 4J
Open - Unsanitary condition
Mold
Oct 13, 2026 · Apt 4J
Open - Paint/plaster
Wall
Oct 13, 2026 · Apt 4J
Open - General
Cabinet
Oct 13, 2026 · Apt 4J
Open - Heat/hot water
Apartment only
Oct 12, 2026 · Apt 3A
Close - Heat/hot water
Entire building
Oct 8, 2026 · Apt 2H
Close - Unsanitary condition
Sewage
Oct 1, 2026 · Apt 1G
Close - Unsanitary condition
Pests
Oct 1, 2026 · Apt 1G
Close
Show 40 more ↓
- Unsanitary condition
Pests
Oct 1, 2026 · Apt 1G
Close - Flooring/stairs
Floor
Oct 1, 2026 · Apt 1G
Close - Heat/hot water
Entire building
Sep 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Sep 23, 2026 · Apt BLDG
Close - Door/window
Window frame
Aug 17, 2026 · Apt 4J
Close - Unsanitary condition
Mold
Aug 17, 2026 · Apt 4J
Close - Unsanitary condition
Garbage/recycling storage
Jul 16, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 15, 2026 · Apt BLDG
Close - Plumbing
Water supply
Jul 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jul 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jun 19, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Jun 16, 2026 · Apt 4K
Close - Appliance
Electric/gas range
Jun 16, 2026 · Apt 4K
Close - Water leak
Heavy flow
Jun 16, 2026 · Apt 4K
Close - Appliance
Electric/gas range
May 19, 2026 · Apt 4K
Close - Appliance
Electric/gas range
May 19, 2026 · Apt 4K
Close - Heat/hot water
Entire building
May 12, 2026 · Apt BLDG
Close - Paint/plaster
Wall
May 1, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt 4K
Close - Heat/hot water
Entire building
Apr 21, 2026 · Apt BLDG
Close - Unsanitary condition
Pests
Apr 9, 2026 · Apt 1G
Close - Plumbing
Basin/sink
Apr 9, 2026 · Apt 1G
Close - Flooring/stairs
Floor
Apr 9, 2026 · Apt 1G
Close - Flooring/stairs
Floor
Apr 9, 2026 · Apt 1G
Close - Plumbing
Basin/sink
Apr 9, 2026 · Apt 1G
Close - Water leak
Heavy flow
Apr 7, 2026 · Apt 1D
Close - Paint/plaster
Ceiling
Apr 7, 2026 · Apt 1D
Close - Electric
Outlet/switch
Apr 7, 2026 · Apt 1D
Close - Water leak
Slow leak
Mar 18, 2026 · Apt 4ST
Close - Unsanitary condition
Pests
Mar 11, 2026 · Apt 4ST
Close - Paint/plaster
Ceiling
Mar 11, 2026 · Apt 4ST
Close - Appliance
Refrigerator
Mar 11, 2026 · Apt 4ST
Close - Flooring/stairs
Floor
Mar 11, 2026 · Apt 4ST
Close - Paint/plaster
Wall
Mar 11, 2026 · Apt 4ST
Close - Electric
Wiring
Mar 11, 2026 · Apt 4ST
Close - Water leak
Heavy flow
Mar 11, 2026 · Apt 4ST
Close - Door/window
Door to dumbwaiter
Mar 11, 2026 · Apt 4ST
Close - Plumbing
Bathtub/shower
Mar 11, 2026 · Apt 4ST
Close - Flooring/stairs
Floor
Mar 11, 2026 · Apt 4ST
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1923
- Floors
- 5
- Residential units
- 54
- Building area
- 55,000 ft²
- Lot area
- 14,600 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 15
- Block / lot
- 3304 / 80
- Assessed value
- $1,219,500
- Landmark / historic district
- No
HPD registration #205376, last renewed Aug 12, 2025.
Questions about 219 East 196 Street
Who owns 219 East 196 Street?
The owner of record in NYC Department of City Planning PLUTO data is 219 LLC.
Does 219 East 196 Street have violations?
Yes. NYC HPD has recorded 1,030 housing violations at this property.
Is 219 East 196 Street rent stabilized?
NYC Department of Finance tax bills listed 54 rent-stabilized units here in 2024 (about 100% of its 54 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 219 East 196 Street built?
City records list 1923 as the year it was built.
How many apartments are in 219 East 196 Street?
It has 54 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.