2773 Briggs Avenue
Bronx, NY 10458BBL 2-03301-0092Map
Owner of record: 2773-79 Briggs Ave LLC D
2773 Briggs Avenue is a walk-up apartment building built in 1915 in Bronx, 10458. It has 42 residential units across 5 floors. The owner of record is 2773-79 Briggs Ave LLC D. HPD has recorded 178 housing violations here, most recently on September 23, 2026. 13 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 178
- DOB violations
- 6
- ECB violations
- 1
- HPD complaints
- 368
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 178
- CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Sep 23, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Sep 23, 2026 · Apt 4E
Open — Civ14 mailed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east at center, the 1st room from east at south located at apt 4e, 5th story, 1st apartment from north at east
Aug 19, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Aug 19, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Aug 19, 2026 · Apt 4E
Open — Civ14 mailed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from north at east wall in the 1st room from east at north located at apt 4e, 5th story, 1st apartment from north at east
Aug 19, 2026 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at the building entrance door at public hall, 1st story
Aug 15, 2026
Open — Nov certified on time - CImmediately hazardous
Provide security in the event of power outrage by means of an acceptable mechanical heavy duty lock and latch set at the building entrance door at public hall, 1st story
Aug 15, 2026
Open — Nov certified on time - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the 1st room from east at center, the bathroom , the 1st room from east at south located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at ceiling, south wall, west wall and north wall in the bathroom located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at north wall in the 2nd room from east located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective caulking at the edge of the floor (between baseboard & floor) at north wall and west wall in the 2nd room from east located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east at south located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the east wall in the 1st room from east at south located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Jun 27, 2026 · Apt 4E
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective wood baseboards in the foyer located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color walls and ceiling in the 2nd room from north at west located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color south wall and ceilibg in the bathroom located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at south wall east wall window casing in the bathroom located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective broken, crack at top wire mesh window, at 3rd story intermediate landing at public hall stairs
Mar 12, 2025
Closed — Violation dismissed - BHazardous
Remove all encumbrances consisting of motor wheel chair, childrens toys, plastic gates, underneath sofit, at public hall, 1st story
Mar 12, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft but less than 30 sq ft south wall in the 1st room from north at west located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq ft but less than 30 sq ft at ceiling ,north and west walls in the 2nd room from north at west located at apt 1d, 3rd story, 1st apartment from south at west
Mar 12, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq ft at west wall in the 3rd room from east at south located at apt 1d, 4th story, 1st apartment from south at west
Jan 30, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from south at west
Sep 30, 2024 · Apt 1A
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Sep 30, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 2nd room from east at north located at apt 1a, 1st story, 1st apartment from south at west
Sep 30, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the bathroom located at apt 1a, 1st story, 1st apartment from south at west
Sep 30, 2024 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1a, 1st story, 1st apartment from south at west
Sep 30, 2024 · Apt 1A
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective cracked lower window sash wired glass pane at intermediate landing at public hall stairs, 1st story
Apr 10, 2024
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 28, 2023
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4e, 5th story, 1st apartment from north at east
Dec 28, 2023 · Apt 4E
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 2nd door frame from south at west wall, west wall in the 2nd room from east located at apt 1a, 1st story, 1st apartment from south at west
May 22, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the kitchen located at apt 1a, 1st story, 1st apartment from south at west
May 22, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at building entrance door
May 22, 2023
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of flower pots at 5th story balcony at building front
May 22, 2023
Closed — Violation dismissed - BHazardous
Refit at vestibule door to 1st story public hallway
May 22, 2023
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, and all walls in the 3rd room from east at south located at apt 1a, 1st story, 1st apartment from south at west
May 22, 2023 · Apt 1A
Closed — Violation closed - BHazardous
Refit hinges at door in the entrance located at apt 1a, 1st story, 1st apartment from south at west
May 22, 2023 · Apt 1A
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt 2a, 1st story, 2nd apartment from south at west
May 22, 2023 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 1st story, 2nd apartment from south at west
May 22, 2023 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3e, 5th story, 1st apartment from east at south
May 13, 2023 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at the ceiling in the 1st room from east at south located at apt 3e, 5th story, 1st apartment from east at south
May 13, 2023 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3e, 5th story, 1st apartment from east at south
May 13, 2023 · Apt 3E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3e, 5th story, 1st apartment from east at south
May 13, 2023 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 3e, 5th story, 1st apartment from east at south
May 13, 2023 · Apt 3E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 3e, 5th story, 1st apartment from east at south
May 13, 2023 · Apt 3E
Closed — Violation dismissed
DOB building violations · 6
- Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 1
- Non-hazardous
Work without permits.removing plaster ceilings,replacing w/2 by 6 wood framing.for the purpose of covering ceiling 10' to 8' w/ 1/2 sheetrock non fire rated material.location:entire #1 line 1 st thru 5-.stop al
Oct 14, 2004 · Penalty $500
Resolve
Complaints
- Plumbing
Water supply
Jul 3, 2026 · Apt 4E
Open - Electric
Lighting
Jul 3, 2026 · Apt 4E
Open - Electric
Wiring
Jun 15, 2026 · Apt 4E
Close - Unsanitary condition
Pests
Jun 15, 2026 · Apt 4E
Close - Appliance
Refrigerator
Jun 15, 2026 · Apt 4E
Close - Electric
Outlet/switch
Jun 15, 2026 · Apt 4E
Close - Appliance
Electric/gas range
Jun 15, 2026 · Apt 4E
Close - Paint/plaster
Wall
Jun 15, 2026 · Apt 4E
Close - Water leak
Slow leak
May 29, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Mar 18, 2026 · Apt APT4E
Close
Show 40 more ↓
- Unsanitary condition
Pests
Mar 18, 2026 · Apt APT4E
Close - Heat/hot water
Entire building
Feb 9, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Jan 23, 2025 · Apt 1D
Close - Heat/hot water
Apartment only
Jan 23, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Jan 23, 2025 · Apt 1D
Close - Safety
Window guard broken/missing
Jan 23, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Jan 23, 2025 · Apt 1D
Close - Unsanitary condition
Pests
Jan 23, 2025 · Apt 1D
Close - Unsanitary condition
Mold
Jan 23, 2025 · Apt 1D
Close - Electric
Lighting
Dec 16, 2024 · Apt 1A
Close - Appliance
Refrigerator
Nov 30, 2024 · Apt 1D
Close - Unsanitary condition
Pests
Nov 30, 2024 · Apt 1D
Close - Door/window
Window pane
Nov 30, 2024 · Apt 1D
Close - Paint/plaster
Wall
Nov 30, 2024 · Apt 1D
Close - Appliance
Electric/gas range
Nov 30, 2024 · Apt 1D
Close - Flooring/stairs
Floor
Nov 30, 2024 · Apt 1D
Close - Door/window
Window frame
Nov 30, 2024 · Apt 1D
Close - Flooring/stairs
Floor
Nov 30, 2024 · Apt 1D
Close - Safety
Window guard broken/missing
Sep 17, 2024 · Apt 3D
Close - Paint/plaster
Wall
Jun 27, 2024 · Apt 3D
Close - Safety
Window guard broken/missing
Jun 27, 2024 · Apt 3D
Close - Unsanitary condition
Pests
Jan 25, 2024 · Apt 4C
Close - Appliance
Electric/gas range
Jan 25, 2024 · Apt 4C
Close - Heat/hot water
Apartment only
Dec 24, 2023 · Apt 4E
Close - Water leak
Heavy flow
May 1, 2023 · Apt 3E
Close - Water leak
Slow leak
May 1, 2023 · Apt 3E
Close - Paint/plaster
Wall
May 1, 2023 · Apt 3E
Close - Appliance
Electric/gas range
May 1, 2023 · Apt 3E
Close - Heat/hot water
Entire building
Apr 27, 2023 · Apt BLDG
Close - Appliance
Refrigerator
Dec 2, 2022 · Apt 3A
Close - Appliance
Electric/gas range
Dec 2, 2022 · Apt 3A
Close - Paint/plaster
Wall
Dec 2, 2022 · Apt 3A
Close - Flooring/stairs
Floor
Dec 2, 2022 · Apt 3A
Close - Plumbing
Basin/sink
Dec 2, 2022 · Apt 3A
Close - Plumbing
Toilet
Dec 2, 2022 · Apt 3A
Close - General
Cabinet
Oct 25, 2021 · Apt 1A
Close - Plumbing
Basin/sink
Oct 25, 2021 · Apt 1A
Close - Paint/plaster
Ceiling
Oct 25, 2021 · Apt 1A
Close - Unsanitary condition
Mold
Oct 25, 2021 · Apt 1A
Close - Paint/plaster
Ceiling
Oct 23, 2021 · Apt 1A
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 5
- Residential units
- 42
- Building area
- 35,445 ft²
- Lot area
- 10,263 ft²
- Zoning
- R6B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3301 / 92
- Assessed value
- $1,242,900
- Landmark / historic district
- No
HPD registration #202635, last renewed Jul 24, 2025.
Questions about 2773 Briggs Avenue
Who owns 2773 Briggs Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2773-79 Briggs Ave LLC D.
Does 2773 Briggs Avenue have violations?
Yes. NYC HPD has recorded 178 housing violations at this property.
Is 2773 Briggs Avenue rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 42 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2773 Briggs Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 2773 Briggs Avenue?
It has 42 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.