2707 Briggs Avenue
Bronx, NY 10458BBL 2-03300-0056Map
Owner of record: 2707 Briggs Realty
2707 Briggs Avenue is a walk-up apartment building built in 1915 in Bronx, 10458. It has 26 residential units across 5 floors. The owner of record is 2707 Briggs Realty. HPD has recorded 840 housing violations here, most recently on September 14, 2026. 42 of the 50 most recent violations are still open. City tax records listed 26 rent-stabilized apartments here in 2024.
- HPD violations
- 840
- DOB violations
- 6
- ECB violations
- 4
- HPD complaints
- 1,306
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 840
- BHazardous
Properly repair or replace the broken or defective screen at lower sash window at fire escape in the 1st room from east located at apt 2a, 3rd story, 1st apartment from north at east
Sep 14, 2026 · Apt 2A
Open — Civ14 mailed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the bathroom located at apt 2a, 3rd story, 1st apartment from north at east
Sep 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at 2nd, 4th and 5th story balcony at building front at fire escape, 3rd story
Sep 14, 2026
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods at 3rd story balcony at building front at fire escape, 3rd story
Sep 14, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). south wall, east wall in the 3rd room from east at north located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) west wall in the 3rd room from east at north located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 4th room from east, the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Civ14 mailed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 4th room from east located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at 1st window frame from west at north, east wall, north wall and west wall in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall in the 3rd room from east at north located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Civ14 mailed
Show 40 more ↓
- BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at north wall and east wall in the 3rd room from east at north located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 4th room from east located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective lower window sash spring balance at 1st window from south at west in the 4th room from east located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective door at entrance in the 4th room from east located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective door frame ( casing & jamb) at entrance in the 4th room from east located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective 1st closet door from east at south in the 1st private hallway from east located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective door at entrance in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Replace with new the missing electrical outlet cover plate at north wall in the kitchen located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Properly repair or replace the broken or defective upper window sash glass pane ( inner part) at 1st window from west at north in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Invalid certification - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Aug 5, 2026 · Apt 1E
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose light fixture at ceiling at public hall, 1st story
Apr 29, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective shattered wired glass pane at lower sash at north wall window at public hall, 1st story
Dec 9, 2025
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic tiled floor in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 30 sq ft at ceiling, the north wall, west wall, east wall and 1st window frame from west at north wall in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 1E
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the bathroom , the foyer , the 4th room from east, the kitchen located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 1E
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 25, 2025 · Apt 1E
Open — Nov sent out - ANon-hazardous
§ 300 m/d law file plans and application and legalize the following alteration or restore to the legal condition existing prior to the making of said alteration illegal partation made of sheetrocks walls,beams from floor to ceiling subdivided room in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 13, 2025 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside closet in the 1st room from east located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 13, 2025 · Apt 1E
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... ,more than 10 sqft at ceiling and east wall in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Nov 13, 2025 · Apt 1E
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [latch] door from street to vestibule at 1st story at public hall
Nov 8, 2025
Closed — Violation closed - BHazardous
Provide adequate lighting at ceiling at fire passage way
Nov 8, 2025
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of stove range at east wall at 1st story at public hall
Nov 8, 2025
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch set at door from street to vestibule at public hall
Nov 8, 2025
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the 1st room from east, the bathroom located at apt 1e, 2nd story, 1st apartment from south at west
Oct 24, 2025 · Apt 1E
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 1st room from east, the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper sash glass pane in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the east wall in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak the south wall in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq. ft. at ceiling ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west
Oct 8, 2025 · Apt 1E
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... less then 10 sq. ft. at ceiling ceiling in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west original violation 18283096 issued 08-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).
Oct 8, 2025 · Apt 1E
Open — First no access to re- inspect violation - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door , 1st story
Oct 3, 2025
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set at building entrance door , 1st story
Oct 3, 2025
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq.ft at ceiling, south wall and north wall in the bathroom located at apt 1e, 2nd story, 2nd apartment from south at west original violation 18202342 issued 02-sep-25 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
Sep 2, 2025 · Apt 1E
Open — Notice of issuance sent to tenant
DOB building violations · 6
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
May 29, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 4
- Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35407602j issued on 3/1/19 and to file a certificate of cor rection pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commissi
Apr 30, 2019 · Penalty $625
Resolve - Class - 1
Work w/o permit. at time of inspection noted partition added new drywall,new electric fixtures,new lighting,new exterior door,and windows. work w/o permit noted on ground fl rear of building exp 3. drywall and
Mar 6, 2019 · Penalty $1,250
Resolve - Class - 2
Failure to comply with the commissioner's order contained in nov#35117306j issued on 12/18/14 and to file certificate of correction pursuantto 28-201.1,28-204.4 and 1rcny 102.01.rem:comply with commissioner's o
Jun 30, 2015 · Penalty $800
Resolve - Class - 1
Noted @ apt 4e window leading to rear fire escape.sealed wedged unoperational unable to open(failure to maintain)rem:maintain bldg in code compliant manner.
Dec 18, 2014 · Penalty $5,000
Resolve
Complaints
- Unsanitary condition
Mold
Sep 10, 2026 · Apt 2A
Close - Safety
Fire escape
Sep 10, 2026 · Apt 2A
Close - Paint/plaster
Ceiling
Sep 10, 2026 · Apt 2A
Close - Electric
Power outage
Aug 2, 2026 · Apt 1E
Close - Appliance
Refrigerator
Jun 26, 2026 · Apt B
Close - Heat/hot water
Entire building
May 21, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Electric
Power outage
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt 1B
Close
Show 40 more ↓
- Electric
Power outage
Apr 9, 2026 · Apt 1B
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Electric
Power outage
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Feb 11, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Water leak
Heavy flow
Nov 25, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Nov 25, 2025 · Apt 1E
Close - Paint/plaster
Ceiling
Nov 25, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 11, 2025 · Apt 4D
Close - Heat/hot water
Entire building
Nov 6, 2025 · Apt 3D
Close - Heat/hot water
Entire building
Nov 1, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Oct 24, 2025 · Apt GROUND
Close - Unsanitary condition
Mold
Oct 22, 2025 · Apt 1E
Close - Paint/plaster
Ceiling
Oct 22, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Oct 18, 2025 · Apt BLDG
Close - Water leak
Slow leak
Oct 6, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Oct 6, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Aug 28, 2025 · Apt 1E
Close - Door/window
Window pane
Aug 28, 2025 · Apt 1E
Close - Paint/plaster
Ceiling
Aug 28, 2025 · Apt 1E
Close - Unsanitary condition
Mold
Jul 21, 2025 · Apt 1E
Close - Door/window
Window frame
Jul 21, 2025 · Apt 1E
Close - Heat/hot water
Entire building
Feb 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 13, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Oct 24, 2024 · Apt 3E
Close - Electric
Outlet/switch
Oct 16, 2024 · Apt 3D
Close - General
Cabinet
Oct 16, 2024 · Apt 3D
Close - Appliance
Refrigerator
Oct 16, 2024 · Apt 3D
Close - Safety
Window guard broken/missing
Oct 16, 2024 · Apt 3D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1915
- Floors
- 5
- Residential units
- 26
- Building area
- 24,250 ft²
- Lot area
- 5,511 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3300 / 56
- Assessed value
- $810,900
- Landmark / historic district
- No
HPD registration #201932, last renewed Sep 15, 2025.
Questions about 2707 Briggs Avenue
Who owns 2707 Briggs Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2707 Briggs Realty.
Does 2707 Briggs Avenue have violations?
Yes. NYC HPD has recorded 840 housing violations at this property.
Is 2707 Briggs Avenue rent stabilized?
NYC Department of Finance tax bills listed 26 rent-stabilized units here in 2024 (about 100% of its 26 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2707 Briggs Avenue built?
City records list 1915 as the year it was built.
How many apartments are in 2707 Briggs Avenue?
It has 26 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.