roofy

2661 Marion Avenue

Bronx, NY 10458BBL 2-03287-0100Map

Owner of record: Fordham Terrace Apartment Corp (The)

2661 Marion Avenue is an elevator apartment building built in 1966 in Bronx, 10458. It has 73 residential units across 6 floors. The owner of record is Fordham Terrace Apartment Corp (The). HPD has recorded 189 housing violations here, most recently on July 24, 2026. 31 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.

HPD violations
189
DOB violations
43
ECB violations
51
HPD complaints
302

What to know

Concern
7 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Jul 24, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
6
About 8% of the building's 73 apartments
Down from 8 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 189

  • B

    Properly repair or replace the broken or defective latch and its assembly at door at compactor closet, 4th story

    Jul 24, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at door at compactor closet, 4th story

    Jul 24, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that is defective in the entire apartment located at apt 4a, 4th story, 4th apartment from south at west

    Jul 24, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that is defective in the entire apartment located at apt 4a, 4th story, 4th apartment from south at west

    Jul 24, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bahtub in the bathroom located at apt 4a, 4th story, 4th apartment from south at west

    Jul 24, 2026 · Apt 4A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq ft at south wall in the bathroom located at apt 4a, 4th story, 4th apartment from south at west

    Jul 24, 2026 · Apt 4A

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the bathroom located at apt 4a, 4th story, 4th apartment from south at west

    Jul 24, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4a, 4th story, 4th apartment from south at west

    Jul 24, 2026 · Apt 4A

    Open — Nov sent out
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Jul 13, 2026

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Jul 13, 2026

    Closed — Violation closed
Show 40 more ↓
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Jul 13, 2026

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective heavy duty lock on at entrance door to building at public hall, 1st story

    Jun 22, 2026

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak concealed water leak at ceiling and south wall in the bathroom located at apt 4a, 4th story, 4th apartment from south at west

    Jun 22, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and south wall in the bathroom located at apt 4a, 4th story, 4th apartment from south at west

    Jun 22, 2026 · Apt 4A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective latch set and assembly at door at compactor closet, 3rd story

    Jun 10, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 3rd story

    Jun 10, 2026

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules that missing in the entire apartment located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations that missing in the entire apartment located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Notice of issuance sent to tenant
  • B

    M/d law abate the nuisance consisting of broken and lifting vinyl floor tiles creating trip hazard in the private hallway located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color east wall in the 1st room from north located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the bathroom located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... less than 30 sq.ft at east, north walls and ceiling in the bathroom located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — First no access to re- inspect violation
  • B

    Properly repair with similar material the broken or defective wooden floor broken and lifting in the 1st room from north located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Open — Nov sent out
  • C

    M/d law abate the nuisance consisting of broken and lifting vinyl floor tiles creating trip hazard in the 3rd room from north located at apt lla, 1st apartment from north at east

    Jun 10, 2026 · Apt LLA

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective marble floor tiles at walking area in the foyer located at cellar apt lla, 1st cellar apt from north at east

    Oct 9, 2025 · Apt LLA

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective marble floor tiles at walking area in the 1st room from north located at cellar apt lla, 1st cellar apt from north at east

    Oct 9, 2025 · Apt LLA

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading to staircase at public hall, 2nd story

    Jul 17, 2025

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at public hall, 1st story

    Jul 17, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story

    Jul 17, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 1st story

    Jul 17, 2025

    Closed — Violation closed
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Jun 5, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at north and south walls at public hall, 4th story

    Jun 1, 2025

    Open — Not complied with
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling at public hall, 4th story

    Jun 1, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the fire retardant material at ceiling in vestibule , 1st story

    Mar 12, 2025

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling in vestibule , 1st story

    Mar 12, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door at fire stairs, 2nd story

    Mar 12, 2025

    Closed — Violation closed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 4th apartment from south at west

    Mar 12, 2025 · Apt 2B

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 4th apartment from south at west

    Mar 12, 2025 · Apt 2B

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective base sink cabinet in the kitchen located at apt 2b, 2nd story, 4th apartment from south at west

    Mar 12, 2025 · Apt 2B

    Open — Nov sent out
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 1 in the entire apartment located at apt 4f, 4th story, 4th apartment from north at east

    Feb 24, 2025 · Apt 4F

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the kitchen located at apt 4f, 4th story, 4th apartment from north at east

    Feb 24, 2025 · Apt 4F

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective wood base cabinet at north wall in the kitchen located at apt 4f, 4th story, 4th apartment from north at east

    Feb 24, 2025 · Apt 4F

    Open — Nov sent out
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Jan 16, 2025

    Open — Not complied with
  • C

    Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing sign

    Jan 16, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.

    Jan 16, 2025

    Closed — Violation closed
  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper.

    Jan 16, 2025

    Open — Not complied with
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected

    Jan 16, 2025

    Open — Not complied with
  • A

    Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.

    Jan 16, 2025

    Closed — Violation closed

DOB building violations · 43

  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 22, 2025

    Dob violation - active
  • Construction other optional

    Partial vacate order due to severly hazardous conditions observed at all balconies at exposure 3, west elevation

    Nov 8, 2024

    Dob violation - active
  • Construction other optional

    Emergency work order due to severly damaged/spalling balcony concrete slabs at exposure #3-west elevation. remedy: immediately remove loose hazardous material and provide safety measures under direction of a licensed professional

    Oct 31, 2024

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Apr 3, 2024

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Oct 4, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2018 external low pressure inspection

    Jun 20, 2023

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Feb 2, 2022

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2021

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 15, 2021

    Dob violation - active
Show 33 more ↓
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 2, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 14, 2020

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 9, 2020

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    May 30, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 7, 2018

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Jan 24, 2018

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Sep 6, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 8, 2017

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 10, 2017

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2015 cat 1 insp/tst

    Jan 3, 2017

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 16, 2016

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 5, 2015

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2013 inspection/test

    Oct 31, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 16, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 17, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 17, 2013

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2011 inspection report

    Mar 1, 2013

    Dob violation - dismissed
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2011 inspection/test

    Oct 1, 2012

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 3, 2012

    Dob violation - resolved
  • Elevator annual inspection / test elevatorrequired

    Violation issued to elevator-failure to file category 1 2010 inspection/test

    Dec 13, 2011

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 20, 2010

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 19, 2009

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 27, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 6, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    2p3990

    Feb 23, 2002

    Dob violation - resolved
  • Elevator elevatoroptional

    1

    Oct 12, 1989

    Dob violation - dismissed
  • Elevator elevatorrequired

    51-secure smoke hole grating 52 repair main line switch box cover 53-eliminate excessive play car & rails

    Jan 10, 1989

    Dob violation - resolved

ECB violations · 51

  • Class - 1

    Failure to provide unobstructed exit passageway. at time of inspection, multiple a/c units installed at the fire escape along exposure #1, obstructing the required egress path and restricting safe passage durin

    Aug 25, 2026 · Penalty $2,500

    Active
  • Class - 1

    Failure to obey a vacate order from the commissioner per 28-207.4. at time of inspection it was observed at exposure 3 parking space being utilized despite partial vacate 110824ll07025b issued on 11/08/2024. re

    Dec 20, 2024 · Penalty $24,000

    Active
  • Class - 2

    Permit #x00883595.at time of inspection i observed 6 story residential buildings sidewalk shed in place exposure 1 upon review dob now and bis sidewalk shed has been expire since 06/05/2024 comply with chapter

    Nov 12, 2024

    Resolve
  • Class - 1

    Failure to take/provide required action to secure public safety at a designated unsafe building facade as per technical report #919331-9b-1 issued on 10/18/24. note: observed fisp building designated unsafe in

    Oct 31, 2024 · Penalty $25,000

    Active
  • Class - 2

    At time of inspection i observed sidewalk shed erected upon search in dob now and bis systems both showed permit x00883595 has expired on 6-05-24 and has not been renewed as required.renew and maintain permit i

    Jun 17, 2024 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to provide protection for tenants during demolition or construction activity in an occupied building. a.t.o.i. observed constructiondebris and blue tarp on fire escape. block means of egress to apartmen

    Jan 2, 2024 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to maintain adequate housekeeping per section requirements. a.t.o.i. observed excessive construction debris of masonary bricks pilednear leading edge of building roof at exp. #1. no workers on site a.t.

    Jan 2, 2024

    Resolve
  • Class - 1

    Work without a permit. a.t.o.i. observed erected scaffold with pulley/hoist installed. scaffold missing critical cross bracing components attop and bottom of scaffolding. all work is on roof. no permit on file

    Jan 2, 2024

    Resolve
  • Class - 2

    Failure to post or properly post permit for work at premises atoi observed sidewalk shed installed on exposure 1. no permits could be found posted anywhere in the building. for more information call dob at 212-

    Oct 23, 2023

    Resolve
  • Class - 1

    Upon inspection observed at exp.#1/front & #3/rear, several ac units are installed on the fire escape window & blocking egress. creating a hazard to tenants & first responders in the event of a emergency evacua

    Jun 28, 2023 · Penalty $1,280

    Active
Show 40 more ↓
  • Class - 1

    Upon inspection observed at exp. #3/rear, numerous concrete balconies are in state of disrepair with multiple cracks, spalling concrete & exposed steel reinforcement. several areas of concrete have detached lea

    Jun 28, 2023 · Penalty $25,000

    Active
  • Class - 2

    Failure to comply with commissioner's order contained in summons/violation #35631812y issued 11/06/21 and file certificate of correction pursuant to 28-201.1 and 1rcny 102-01.for failure to maintain building wa

    Jan 25, 2022 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building walls or appurtenances.observed at rear of building concrete/cement balconies currently deteriorating cracking chipping exposing metal rebar and i beams.remedy:maintain building rep

    Nov 6, 2021 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v35577223c issued6/14/21 &to file c/c pursuant to28-201.1&1rcny102-01.failure to maintain comply w/commissioner's order &/or file c/c.

    Sep 24, 2021 · Penalty $1,250

    Active
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v35577226l issued6/14/20 &to file c/c pursuant to28-201.1&1rcny102-01.failure to maintain bldg walls or appurtenance comply w/commissioner's order &

    Aug 9, 2021 · Penalty $1,250

    Active
  • Class - 1

    Failure to maintain building wall(s) or appurtenances.noted:during inspection observed at exp #3 rear of building several balconies with step cracks,chipped and/or missing mortar/cement and exposing rusted reba

    Jun 14, 2021 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/v35467983r issued2/29/20&to file c/c pursuant to28-201.1&1rcny102-01.for cracks@exp3@rear of bldg.comply w/commissioner's order &/or file c/c.

    Mar 15, 2021 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35467983r issued on 02/29/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls or appurtenances.

    Dec 21, 2020 · Penalty $3,125

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35467983r issued on 02/29/20 & to file a cert of correction pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls:at exp# are several

    Sep 30, 2020 · Penalty $1,280

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances. note: at time of inspection observed at exp#3/rear of the bldg. there are several balconiesthat have horizontal cracks,missing &/or chipped mortar/cement. this

    Feb 29, 2020 · Penalty $6,250

    Active
  • Class - 2

    Failure to comply w/comm's order contained in summ#35454857n issued on10/19/19 and to file a cofc pursuant to 28-2011 and 1rcny 102-01.rem:comply w/comm's order and/or file a cofc.

    Dec 19, 2019 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building walls and appurtenances at exposure 3 rear of building balconies have horizontal cracks,missing mortar,concretestreet visible at various locations throughout.remedy:comply with code

    Oct 19, 2019 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35322551x issued on 03-10-18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain bldg

    Aug 30, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/commissioner's order contained in summons/violation #35322551x issued on 03/10/18 and to file a certificate of correct ion pursuant to 29-201.1 and 1rcny 102-01. for failure to maintain at

    Jun 18, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35322551x issued on 03-10-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no compliance recorded. remedy: comply w/comm's order &/or file

    Apr 6, 2019 · Penalty $3,125

    Resolve
  • Class - 2

    39x10,52m07,80m07. 39x-repair car top light, *52m0-provide and install tags; 80m-provide and install.

    Mar 12, 2019 · Penalty $625

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation#35322551x issued on 3/10/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. remedy:comply w/ commissio

    Feb 1, 2019 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35392948h issued on 03/10/2018 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.rem:comply with commis

    Dec 12, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioners order contained in summons/violation #35322537x issued on 3/10/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102.01.comply with commisioners

    Oct 24, 2018 · Penalty $1,250

    Active
  • Class - 2

    Failed to comply with commissioner's order contained in summons/viola tion #35322551x issued on 03/10/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for cracks of exposure 3

    Aug 18, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35322551x issued 03/10/18 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. failure to maintain build

    Jul 13, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order contained in summons/violation# 35322551x issued on 3/10/18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls or appurtenance.

    May 31, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35322551x issued on 03-10-18 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. failure to maintain bldg walls & appurtenances. note: at exp#3

    Apr 18, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    53m07,80m07,80m07,70o02,52b14,52m07,26d07,68b07,68b07,59b07,56y13,56i10,42t07,57b11,41b10,40i10,24i10. 53-provide missing gov rope data tag 80-missing runby signage; 80-provide crosby on cwt; 70-pit dirty; 52

    Apr 18, 2018 · Penalty $625

    Active
  • Class - 1

    Failure to maintain building walls or appurtenances.at the time of inspection observed at expo#3 rear of building 6 story building on each end of rear building balconies,horizontal cracks and under the balconie

    Mar 10, 2018 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply with the commissioner's order contained in summons/violation #35272547n issued 12/07/17 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. noted: failure to maintai

    Jan 23, 2018

    Resolve
  • Class - 1

    Failure to maintain bldg walls or appurtenances. noted: at exp#3 at the rear of the bldg at 2nd & 3rd sty,north west balconies,horizontal cracks approx 12ft long. remedy: comply w/code/repair the cracks.

    Dec 7, 2017 · Penalty $1,000

    Active
  • Class - 1

    Failure to maintain building walls or appurtenances noted.at exp#3,building rear,at 2nd and 3rd story north-west balconies,horizontal cracksapprox 12ft long,also at exp#3 south-west at 2nd story balcony,crack

    Nov 3, 2017 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in sum/vio#35270908h issued on 06/10/17 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. note: no document file for failure to maintain bldg w/i code compli

    Aug 6, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain building walls or appurtenances.noted:at expo#3 building rear,at 2nd & 3rd story north-west balconies,horizontal crack approximately 12'long.also at expo#3 at 2nd story,south west balcony al

    Jun 10, 2017 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in summons/vio#35222315x issued on 12/09/16 & to file a c of c pursuant to 28-201.1 & 1rcny 102-01. no c of c on file. remedy: comply w/comm's order &/or file a c

    Mar 25, 2017 · Penalty $800

    Resolve
  • Class - 1

    Failure to maintain bldg in code complaint manner. violation conditions are as follows: in rear of bldg, exp#3 @ 2nd story level, concrete balcony w/ 2 horizontal cracks approx 12' (entire length of balcony). r

    Dec 9, 2016 · Penalty $2,500

    Active
  • Class - 2

    Failure to comply w/the comm's order contained in nov #35172175k issued on 08/18/16 & to file a c of c pursuant to 28-201.1;28-204.4 & 1rcny102-01. for defective balcony at rear of bldg. remedy: comply w/comm's

    Oct 22, 2016 · Penalty $800

    Resolve
  • Class - 1

    Failrue to maintain building in code compliant manner. violating conditions are as follows:inrear of bldg exp#3 at second story level concrete balcony with 2 horizontal cracks aprx 12'(entire length of balcony)

    Aug 18, 2016 · Penalty $1,000

    Active
  • Class - 2

    19m07,52m07,60x10,60q03,67x10,71x10,71q03,76q03,77x10,77103. 19m07-provide bottom safety retainer (fire gibbs) for hoistway doors; 52m07-provide crosby for hoist ropes spin out; 67x10-repair communication in ca

    Mar 11, 2015 · Penalty $500

    Resolve
  • Class - 2

    05l10.02x10.70o02.40o02.44h10.56y10.24x10.11x10.68b07.67x10. 02-alarm system for alarm button & emergency stop switch. 05-door has to be pulled by hand at times to make elevator run. 44-showing uneven groove we

    Jun 4, 2014 · Penalty $500

    Resolve
  • Class - 2

    02x10 20m07 19m07 39o02 40o02 52m07 56y13 60x10 60q03 67x10 68b07 70o02 71q03 77x10 77q03. 20m07-provide vision guard for car door vision panel. 19m07-provide bottom hoistway doors safety retainer (fire gibbs)

    May 19, 2014 · Penalty $1,250

    Resolve
  • Class - 2

    10h10 05e10 02x10 40v02 56y10 100x10 03q03 71q03 73o02 74o02 77x10 39o02 39x10 68b07. 100-restore emergency communication (phone) in elevator cab. 03-provide cover for fan in elev cab. 77-repair work lighting

    Feb 7, 2012 · Penalty $500

    Resolve
  • Class - 2

    56y13,40o02,15m07,70o02,100x10,03q03,70q03,71x10,11m07,10h10,08v10,05e10,39o02,06q03,73o02,74o02: 15-reinstall certificate frame. 05-cab clutch. 100x10-restore emergency communication phone/in elev cab. 03q03-c

    Nov 28, 2011 · Penalty $500

    Resolve
  • Non-hazardous

    47k30o50y36p35p25m22d 25-door operator cover missing

    Apr 17, 1998

    Resolve

Complaints

  • Water leak

    Heavy flow

    Jul 4, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Mold

    Jun 21, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Pests

    Jun 21, 2026 · Apt 4A

    Close
  • Water leak

    Heavy flow

    Jun 21, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Jun 21, 2026 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Jun 21, 2026 · Apt 4A

    Close
  • Water leak

    Heavy flow

    Jun 18, 2026 · Apt 4A

    Close
  • Water leak

    Heavy flow

    May 12, 2026 · Apt 3E

    Close
  • Flooring/stairs

    Floor

    Apr 30, 2026 · Apt LLA

    Close
  • Flooring/stairs

    Floor

    Apr 30, 2026 · Apt LLA

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Nov 13, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 12, 2025 · Apt 6E

    Close
  • Flooring/stairs

    Floor

    Oct 1, 2025 · Apt LLA

    Close
  • Door/window

    Door

    Aug 25, 2025 · Apt 5E

    Close
  • Door/window

    Door

    Aug 9, 2025 · Apt 3G

    Close
  • Safety

    Fire escape

    Aug 4, 2025 · Apt 1A

    Close
  • Safety

    Window guard broken/missing

    Jul 11, 2025 · Apt 2B

    Close
  • Safety

    Window guard broken/missing

    May 29, 2025 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Apr 21, 2025 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Mar 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2025 · Apt BLDG

    Close
  • Water leak

    Heavy flow

    Feb 22, 2025 · Apt 6E

    Close
  • General

    Cabinet

    Feb 20, 2025 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2025 · Apt 3E

    Close
  • Safety

    Window guard broken/missing

    Jan 3, 2025 · Apt 2B

    Close
  • Appliance

    Refrigerator

    Dec 31, 2024 · Apt 4F

    Close
  • Paint/plaster

    Wall

    Dec 31, 2024 · Apt 4F

    Close
  • Flooring/stairs

    Floor

    Dec 31, 2024 · Apt 4F

    Close
  • Unsanitary condition

    Pests

    Dec 31, 2024 · Apt 4F

    Close
  • Unsanitary condition

    Mold

    Dec 31, 2024 · Apt 4F

    Close
  • Plumbing

    Basin/sink

    Dec 31, 2024 · Apt 4F

    Close
  • Paint/plaster

    Ceiling

    Dec 31, 2024 · Apt 4F

    Close
  • Plumbing

    Basin/sink

    Dec 24, 2024 · Apt 4F

    Close
  • Unsanitary condition

    Mold

    Dec 24, 2024 · Apt 4F

    Close
  • Plumbing

    Radiator

    Dec 24, 2024 · Apt 4F

    Close
  • Appliance

    Refrigerator

    Dec 24, 2024 · Apt 4F

    Close
  • Electric

    Outlet/switch

    Dec 24, 2024 · Apt 4F

    Close
  • Unsanitary condition

    Pests

    Dec 24, 2024 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2024 · Apt BLDG

    Close
  • Appliance

    Refrigerator

    Dec 20, 2024 · Apt 4F

    Close
  • Flooring/stairs

    Floor

    Dec 20, 2024 · Apt 4F

    Close
  • Plumbing

    Radiator

    Dec 20, 2024 · Apt 4F

    Close
  • Paint/plaster

    Wall

    Dec 20, 2024 · Apt 4F

    Close
  • Unsanitary condition

    Mold

    Dec 20, 2024 · Apt 4F

    Close
  • Plumbing

    Basin/sink

    Dec 20, 2024 · Apt 4F

    Close
  • Heat/hot water

    Entire building

    Dec 18, 2024 · Apt BLDG

    Close
  • General

    Ventilation system

    Nov 25, 2024 · Apt 5G

    Close
  • Flooring/stairs

    Floor

    Oct 1, 2024 · Apt LLA

    Close
  • Door/window

    Window frame

    Jul 24, 2024 · Apt 4D

    Close
  • Unsanitary condition

    Pests

    May 22, 2024 · Apt 1A

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D4)
Year built
1966
Floors
6
Residential units
73
Building area
81,730 ft²
Lot area
23,100 ft²
Zoning
R7B
Community board
207
Council district
15
Block / lot
3287 / 100
Assessed value
$1,951,650
Landmark / historic district
No

HPD registration #221649, last renewed Aug 11, 2025.

Questions about 2661 Marion Avenue

Who owns 2661 Marion Avenue?

The owner of record in NYC Department of City Planning PLUTO data is Fordham Terrace Apartment Corp (The).

Does 2661 Marion Avenue have violations?

Yes. NYC HPD has recorded 189 housing violations at this property.

Is 2661 Marion Avenue rent stabilized?

NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 8% of its 73 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2661 Marion Avenue built?

City records list 1966 as the year it was built.

How many apartments are in 2661 Marion Avenue?

It has 73 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.