2732 Bainbridge Avenue
Bronx, NY 10458BBL 2-03287-0056Map
Owner of record: 2732 Bainbridge Associates
2732 Bainbridge Avenue is a walk-up apartment building built in 1924 in Bronx, 10458. It has 65 residential units across 5 floors. The owner of record is 2732 Bainbridge Associates. HPD has recorded 2,219 housing violations here, most recently on October 6, 2026. 41 of the 50 most recent violations are still open. City tax records listed 60 rent-stabilized apartments here in 2024.
- HPD violations
- 2,219
- DOB violations
- 5
- ECB violations
- 3
- HPD complaints
- 1,857
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 2,219
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from north at west located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 2nd room from north at west located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling inside closet in the foyer located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and north wall in the kitchen located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Open — Not complied with - BHazardous
Repair the broken or defective connection waste line at sink in the kitchen located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective shelf wood insisde wood base cabinet at sink in the kitchen located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Open — Not complied with - BHazardous
Provide a safe and adequate supply of electric service to the fixtures light fixture at ceiling in the kitchen located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Open — Not complied with - BHazardous
Trace and repair the source and abate the visible mold condition... at west wall aprox 5sq feet and north wall aprox 5 sq feet in the 1st room from north at west located at apt 4s, 1st apartment from west at north , section at south
Oct 6, 2026 · Apt 4S
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of refrigarator with door intact at public hall, 1st story
Oct 1, 2026
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at cieling leading to basement apt # 4s at public hall, 1st story, section ''south ''
Oct 1, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at west and east walls leading to basement apt #4s at public hall, 1st story, section ''south ''
Oct 1, 2026
Open — Not complied with - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at west wall leading to basement apt #4s at public hall, 1st story, section ''south ''
Oct 1, 2026
Open — Not complied with - CImmediately hazardous
Replace with new the missing building entrance door leading to basement apt # 4s at public hall, 1st story, section ''south ''
Oct 1, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective door in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Sep 28, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 1st apartment from south at west
Sep 28, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5l, 5th story, 1st apartment from west at north
Sep 24, 2026 · Apt 5L
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at basement
Sep 24, 2026
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5f, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 5F
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5f, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 5F
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling located at apt 5f, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 5F
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective spring balance lower window sash at north wall in the kitchen located at apt 1b, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1B
Open — Not complied with - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 1; in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1B
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1b, 1st story, 1st apartment from west at north
Sep 23, 2026 · Apt 1B
Open — Notice of issuance sent to tenant - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5f, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 5F
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5f, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt 5F
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt apt1i, 1st story
Sep 11, 2026 · Apt APT1I
Open — Notice of issuance sent to tenant - CImmediately hazardous
Properly repair or replace the broken or defective lower window sash balance at south wall intermediate landing between 1st and 2nd storys at public hall, 1st story, section ''north''
Sep 11, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective stainless saddle at building entrance door at public hall, 1st story, section ''north''
Sep 11, 2026
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective glass at building entrance door at public hall, 1st story, section ''north''
Sep 11, 2026
Closed — Violation closed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west , section ''north''
Sep 11, 2026 · Apt 5B
Open — First no access to re- inspect violation - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west , section ''north''
Sep 11, 2026 · Apt 5B
Open — First no access to re- inspect violation - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west , section ''north''
Sep 11, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5b, 5th story, 2nd apartment from south at west , section ''north''
Sep 11, 2026 · Apt 5B
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 3rd room from east located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from east located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from east at south wall door in the private hallway located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door frame in the private hallway located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the bathroom located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the 3rd room from east located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the 3rd room from east located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 50 sq. ft. at ceiling at public hall, 1st story, section at south
Sep 4, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq. ft. at ceiling in the 2nd room from north at west located at apt 4s, 1st story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 4S
Open — Notice of issuance sent to tenant - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sq. ft. at west wall and north wall in the 1st room from north at west located at apt 4s, 1st story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 4S
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 4s, 1st story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 4S
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Notice of issuance sent to tenant - CImmediately hazardous
M/d law abate the nuisance consisting of protruding nails from wood saddle in the kitchen located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Notice of issuance sent to tenant - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from east at south wall door in the private hallway located at apt 5l, 6th story, 1st apartment from west at north , section at south
Sep 4, 2026 · Apt 5L
Open — Nov sent out
DOB building violations · 5
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - active - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)
Mar 18, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2017
Mar 27, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2015 inspection report
Feb 24, 2017
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active
ECB violations · 3
- Class - 1
Failure to maintain building in code compliant manner. at time of inspection observed at exposure#1, 1st floor apartment windows sustained damage along with furniture lodged into damaged open window frame protr
Jan 16, 2026 · Penalty $12,500
Active - Class - 2
Sec. bc 1001.3, misc & 27-361. failure to maintain egress clear and unobstructed. noted in apt 5a of a multiple dwelling. window guard installed at window eress to fire escape is not operable/can not be opened
Mar 4, 2014 · Penalty $400
Resolve - Class - 1
Failure to maintain bldg interior defects noted: in entrance stairs. landing collapse in about 6ft deep leaving a opening apprx 10ft by 10ft. 6ft deep on north side. remedy: obtain permit. make all repair make
Mar 16, 2009 · Penalty $1,000
Resolve
Complaints
- Paint/plaster
Wall
Oct 8, 2026 · Apt 4S
Open - Unsanitary condition
Garbage/recycling storage
Oct 8, 2026 · Apt 4S
Open - Door/window
Door
Oct 8, 2026 · Apt 4S
Open - Plumbing
Basin/sink
Sep 22, 2026 · Apt 4S
Close - Unsanitary condition
Mold
Sep 22, 2026 · Apt 4S
Close - Plumbing
Steam pipe/riser
Sep 22, 2026 · Apt 4S
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 4S
Close - Plumbing
Basin/sink
Sep 22, 2026 · Apt 4S
Close - Door/window
Door
Sep 22, 2026 · Apt 4S
Close - Paint/plaster
Wall
Sep 22, 2026 · Apt 4S
Close
Show 40 more ↓
- Safety
Window guard broken/missing
Sep 18, 2026 · Apt 1B
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 1B
Close - Door/window
Door
Sep 18, 2026 · Apt 2A
Close - Unsanitary condition
Mold
Sep 18, 2026 · Apt 5F
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 2E
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 2E
Close - Door/window
Window pane
Sep 18, 2026 · Apt 5C
Close - Plumbing
Basin/sink
Sep 18, 2026 · Apt 5C
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 5C
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 5C
Close - Appliance
Electric/gas range
Sep 18, 2026 · Apt 5B
Close - Unsanitary condition
Mold
Sep 18, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Sep 18, 2026 · Apt 5B
Close - Plumbing
Basin/sink
Sep 18, 2026 · Apt 2A
Close - General
Cabinet
Sep 18, 2026 · Apt 2A
Close - Unsanitary condition
Pests
Sep 18, 2026 · Apt 2A
Close - Paint/plaster
Door/frame
Sep 18, 2026 · Apt 5F
Close - Paint/plaster
Ceiling
Sep 18, 2026 · Apt 5F
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 5F
Close - Paint/plaster
Wall
Sep 18, 2026 · Apt 2E
Close - Unsanitary condition
Mold
Sep 18, 2026 · Apt 2E
Close - Flooring/stairs
Floor
Sep 18, 2026 · Apt 2E
Close - Plumbing
Toilet
Sep 18, 2026 · Apt 5B
Close - Flooring/stairs
Floor
Sep 18, 2026 · Apt 5B
Close - Unsanitary condition
Pests
Sep 1, 2026 · Apt APT1I
Close - Water leak
Heavy flow
Sep 1, 2026 · Apt 1I
Close - Unsanitary condition
Mold
Sep 1, 2026 · Apt 1I
Close - Paint/plaster
Ceiling
Sep 1, 2026 · Apt 1I
Close - Paint/plaster
Wall
Sep 1, 2026 · Apt 1I
Close - Unsanitary condition
Pests
Aug 26, 2026 · Apt 4S
Close - Unsanitary condition
Mold
Aug 26, 2026 · Apt 4S
Close - Electric
Lighting
Aug 26, 2026 · Apt 4S
Close - Plumbing
Basin/sink
Aug 26, 2026 · Apt 4S
Close - Door/window
Door
Aug 26, 2026 · Apt 4S
Close - Paint/plaster
Ceiling
Aug 24, 2026 · Apt 2I
Close - Water leak
Damp spot
Aug 24, 2026 · Apt 2I
Close - Paint/plaster
Wall
Aug 24, 2026 · Apt 2I
Close - Unsanitary condition
Mold
Aug 24, 2026 · Apt 2I
Close - Plumbing
Water supply
Aug 21, 2026 · Apt 2G
Close - Unsanitary condition
Mold
Aug 19, 2026 · Apt 2I
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1924
- Floors
- 5
- Residential units
- 65
- Building area
- 61,000 ft²
- Lot area
- 12,750 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3287 / 56
- Assessed value
- $933,750
- Landmark / historic district
- No
HPD registration #204140, last renewed Oct 8, 2025.
Questions about 2732 Bainbridge Avenue
Who owns 2732 Bainbridge Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2732 Bainbridge Associates.
Does 2732 Bainbridge Avenue have violations?
Yes. NYC HPD has recorded 2,219 housing violations at this property.
Is 2732 Bainbridge Avenue rent stabilized?
NYC Department of Finance tax bills listed 60 rent-stabilized units here in 2024 (about 92% of its 65 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2732 Bainbridge Avenue built?
City records list 1924 as the year it was built.
How many apartments are in 2732 Bainbridge Avenue?
It has 65 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.