372 East 199 Street
Bronx, NY 10458BBL 2-03284-0032Map
Owner of record: Nv Property Group LLC
372 East 199 Street is a walk-up apartment building built in 2009 in Bronx, 10458. It has 8 residential units across 4 floors. The owner of record is Nv Property Group LLC. HPD has recorded 20 housing violations here, most recently on August 11, 2024. 7 of the 20 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 20
- DOB violations
- 0
- ECB violations
- 0
- HPD complaints
- 40
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 20
- ANon-hazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 3r, 3rd story, 1st apartment from east at south
Aug 11, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of rodents rats at front of building court, 1st story
Aug 11, 2024
Closed — Violation closed - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Aug 11, 2024
Open — Nov sent out - ANon-hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the building front , 1st story
Aug 11, 2024
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 1st room from east located at apt 3r, 3rd story, 1st apartment from east at south
Aug 11, 2024 · Apt 3R
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the 1st room from east located at apt 4r, 4th story, 1st apartment from east at south
Nov 25, 2023 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Nov 25, 2023
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective wood floor buckling upward in the 2nd room from east located at apt 4r, 4th story, 1st apartment from east at south
Nov 25, 2023 · Apt 4R
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing removable device (door sweeper) at apt entrance door in the entrance located at apt 4r, 4th story, 1st apartment from east at south
Nov 25, 2023 · Apt 4R
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 1, wg to repair = 0 in the entire apartment located at apt 4r, 4th story, 1st apartment from east at south
Nov 25, 2023 · Apt 4R
Closed — Violation dismissed
Show 10 more ↓
- CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 3r, 3rd story, 1st apartment from east at south
Nov 30, 2018 · Apt 3R
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system basement door locked
Nov 30, 2018
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination no light at ceiling fixture at public hall, 3rd story
Nov 30, 2018
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor at vestibule , 1st story
Nov 18, 2018
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper., 1st story
Nov 18, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building., 1st story
Nov 18, 2018
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system at vestibule , 1st story
Nov 18, 2018
Closed — Violation dismissed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling. , 1st story
Nov 18, 2018
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd., 1st story
Nov 18, 2018
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box at vestibule , 1st story
Nov 18, 2018
Open — Nov sent out
DOB building violations · 0
No DOB violations on record
ECB violations · 0
No ECB violations on record
Complaints
- Plumbing
Water supply
Dec 16, 2024 · Apt BLDG
Close - Unsanitary condition
Mold
Aug 3, 2024 · Apt 3R
Close - Unsanitary condition
Pests
Aug 3, 2024 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Aug 3, 2024 · Apt 3R
Close - Plumbing
Sewer
Aug 3, 2024 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 21, 2023 · Apt 4R
Close - Unsanitary condition
Pests
Sep 28, 2023 · Apt 3R
Close - Unsanitary condition
Garbage/recycling storage
Sep 28, 2023 · Apt 3R
Close - Flooring/stairs
Floor
Sep 28, 2023 · Apt 3R
Close - Heat/hot water
Apartment only
Jun 9, 2022 · Apt 4R
Close
Show 30 more ↓
- General
Cooking gas
Jun 6, 2022 · Apt 2R
Close - Heat/hot water
Apartment only
Jun 6, 2022 · Apt 2R
Close - Plumbing
Basin/sink
May 6, 2022 · Apt 2R
Close - General
Cooking gas
May 6, 2022 · Apt 2R
Close - Appliance
Refrigerator
May 6, 2022 · Apt 2R
Close - Heat/hot water
Apartment only
May 6, 2022 · Apt 2R
Close - Unsanitary condition
Garbage/recycling storage
Jun 29, 2020 · Apt BLDG
Close - General
Cabinet
Jun 29, 2020 · Apt 3R
Close - Water leak
Heavy flow
Jun 29, 2020 · Apt 3R
Close - Heat/hot water
Apartment only
Sep 17, 2019 · Apt 2R
Close - Heat/hot water
Entire building
Jul 11, 2019 · Apt 3R
Close - Water leak
Slow leak
May 13, 2019 · Apt 4F
Close - Heat/hot water
Apartment only
Nov 28, 2018 · Apt 3R
Close - Heat/hot water
Apartment only
Nov 15, 2018 · Apt 4F
Close - Unsanitary condition
Garbage/recycling storage
Jul 2, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Jul 2, 2018 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Dec 20, 2017 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 8, 2017 · Apt 4F
Close - General
Janitor/super
Dec 21, 2016 · Apt 2R
Close - Plumbing
Toilet
Dec 21, 2016 · Apt 2R
Close - Plumbing
Basin/sink
Dec 21, 2016 · Apt 2R
Close - Plumbing
Steam pipe/riser
Dec 21, 2016 · Apt 2R
Close - Heat/hot water
Apartment only
Aug 4, 2014 · Apt 4R
Close - Heat/hot water
Entire building
Aug 4, 2014 · Apt 2F
Close - Heat/hot water
Apartment only
May 19, 2014 · Apt 4R
Close - Heat/hot water
Apartment only
May 16, 2014 · Apt 4R
Close - Heat/hot water
Apartment only
May 4, 2014 · Apt 4R
Close - Heating
Heat related
Nov 22, 2012 · Apt NA
Close - Heating
Heat related
Nov 22, 2012 · Apt 3F
Close - Heating
Heat related
May 29, 2011 · Apt 1R
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 2009
- Floors
- 4
- Residential units
- 8
- Building area
- 9,450 ft²
- Lot area
- 2,500 ft²
- Zoning
- R5B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3284 / 32
- Assessed value
- $893,700
- Landmark / historic district
- No
HPD registration #226605, last renewed Aug 24, 2025.
Questions about 372 East 199 Street
Who owns 372 East 199 Street?
The owner of record in NYC Department of City Planning PLUTO data is Nv Property Group LLC.
Does 372 East 199 Street have violations?
Yes. NYC HPD has recorded 20 housing violations at this property.
Is 372 East 199 Street rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 100% of its 8 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 372 East 199 Street built?
City records list 2009 as the year it was built.
How many apartments are in 372 East 199 Street?
It has 8 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.