roofy

400 East 199 Street

Bronx, NY 10458BBL 2-03279-0035Map

Owner of record: 400 Webster Housing Development Fund Co.

400 East 199 Street is a walk-up apartment building built in 1928 in Bronx, 10458. It has 30 residential units across 6 floors. The owner of record is 400 Webster Housing Development Fund Co.. HPD has recorded 27 housing violations here, most recently on September 16, 2026. 10 of the 27 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.

HPD violations
27
DOB violations
9
ECB violations
9
HPD complaints
85

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 16, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
30
About 100% of the building's 30 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 27

  • B

    Repair the leaky and/or defective faucets at sink in the kitchen located at apt 26, 3rd story, 1st apartment from south at west

    Sep 16, 2026 · Apt 26

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in waste drain pipe at bathtub in the bathroom located at apt 26, 3rd story, 1st apartment from south at west

    Sep 16, 2026 · Apt 26

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 26, 3rd story, 1st apartment from south at west

    Sep 16, 2026 · Apt 26

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 26, 3rd story, 1st apartment from south at west

    Sep 16, 2026 · Apt 26

    Open — Nov sent out
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at west yard

    Sep 16, 2026

    Open — Nov certified on time
  • A

    File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.

    Apr 30, 2026

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 34, 4th story, 2nd apartment from south at west

    Jun 8, 2025 · Apt 34

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 34, 4th story, 2nd apartment from south at west

    Jun 8, 2025 · Apt 34

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective bottom shelf at sink base cabinet in the kitchen located at apt 34, 4th story, 2nd apartment from south at west

    Jun 8, 2025 · Apt 34

    Open — Nov sent out
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 26, 3rd story, 1st apartment from south at west

    Jun 3, 2025 · Apt 26

    Open — Notice of issuance sent to tenant
Show 17 more ↓
  • C

    Trace and repair the source and abate the visible mold condition... more than 10 sq ft at all walls and ceiling in the bathroom located at apt 26, 3rd story, 1st apartment from south at west

    Jun 3, 2025 · Apt 26

    Open — Notice of issuance sent to tenant
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 53, 6th story, 1st apartment from north at east

    Jan 3, 2022 · Apt 53

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 53, 6th story, 1st apartment from north at east

    Jan 3, 2022 · Apt 53

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 53, 6th story, 1st apartment from north at east

    Jan 3, 2022 · Apt 53

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector inoperable located at apt 53, 6th story, 1st apartment from north at east

    Jan 3, 2022 · Apt 53

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 53, 6th story, 1st apartment from north at east

    Jan 3, 2022 · Apt 53

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation radiator in the 1st room from east located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective grout and coulking around bathtub in the bathroom located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • B

    Abate the nuisance consisting of mice in the entire apartment located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing in the entire apartment located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation radiator in the 2nd room from east at north located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation radietor in the 2nd room from east located at apt 56, 6th story, 1st apartment from south at west

    May 26, 2016 · Apt 56

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 1st room from east at south located at apt 12, 2nd story, 1st apartment from west at north

    Sep 28, 2012 · Apt 12

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 4th room from east located at apt 12, 2nd story, 1st apartment from west at north

    Sep 28, 2012 · Apt 12

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 12, 2nd story, 1st apartment from west at north

    Sep 28, 2012 · Apt 12

    Closed — Violation dismissed
  • B

    Provide dwelling with a janitor or responsible person or janitorial service.

    Apr 20, 2011

    Closed — Violation closed

DOB building violations · 9

  • Construction other optional

    Failure to maintain bldg in code compliant manner. deterioration of bldg @ exp1,2&3:cracks,step cracks damaged joints and bowed lintels crack window pane at exp3.exp4 damaged window sill, spalling and damaged joints. remedy: repair and/or replace

    Jul 23, 2026

    Dob violation - active
  • Construction other optional

    Failure to maintain building in code compliant manner. note: observed @ exp#1 multiple cracked spalling window sill @ exp#2 multiple cracked window sills and spalling. at exp#3-observed spalling paint/tar multiple location & a step crack. remedy: fix and/or replace

    Apr 4, 2025

    Dob violation - active
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Nov 13, 2019

    Dob violation - active
  • Construction other optional

    Emerg wrk ord:parapet coping stone@exp1/2 crnr fell on 8/22/19.coping stone@exp1/2 crnr@risk of collap onto 1story medical office roof.exp3 bricks@roof part detached from struct& @risk of collap into exp3 rear yard.own retain pe contr immed temp brace or remove loose coping stone instl [email protected] und cont&dir supv pe.file within 2 buss days strt

    Aug 23, 2019

    Dob violation - active
  • Construction other optional

    Ftm:coping stone@exp 1/2 fell to sidewalk on 8/22/19.steel dunnage@exp 3/4 crnr bearing on parapet wall.exp3 brick chimney had part detached bricks 4'long at risk of part collap into rear yard.ownr retain pe to eval entire bldg incl roof,parapet,connect,chim&facades.pe to prepare repr dwgs.reprs to start under permit by 9/30/19 & be cmpl by 12/30/19

    Aug 23, 2019

    Dob violation - active
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 9

  • Class - 2

    Pedestrian protection does not meet code specification: observed the following. loose/defected section of shed parapet corner of exposure 1 and 2. remedy: comply to code specification.

    Jul 23, 2026 · Penalty $2,400

    Active
  • Class - 2

    At time of inspection, observed sidewalk shed at exposure 1 of mixed-use 6-story building not maintained in compliance with code- shed posts installed less than 18 inches from curb, creating potential vehicle i

    Jun 8, 2026 · Penalty $2,400

    Active
  • Class - 1

    Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 east (1)step cracked brick/mortarjoints, north east corner of parapet.-exp #3 west-(1)cracked/spalling/

    Mar 25, 2026 · Penalty $5,000

    Active
  • Class - 2

    At time of inspection of a 6-story building, i observed a sidewalk shed erected exp#1-2 not maintain as per code as per code 3307.6.4.10 founding and 5-feet pathway not maintain as per 3307.2.6..

    Oct 2, 2025

    Resolve
  • Class - 2

    Failure to provide pedestrian protection.ato my insp of occupied 6stybw/sws erected@exp1,2.i noticed@exp2 sws isnt 5'w&additional pathway for public is creating uncapped bolts creating sharp edge.comply w/code&

    Feb 8, 2022 · Penalty $2,400

    Resolve
  • Class - 2

    Failure to maintain bldg in code compliant manner/bldg walls on appurtenances. observed coping stone approx 10 in x 3ft fallen from left handcorner. remedy: maintain bldg walls.

    Oct 8, 2019 · Penalty $3,125

    Active
  • Class - 1

    Failure to maintain building walls noted at time of inspection observed coing stone approx 10 in x 3 ft fallen from to left hand corner 9exposure 1&2) and landed on pulic sidewalk repair defects maintain buildi

    Aug 22, 2019 · Penalty $12,500

    Active
  • Class - 2

    Work w/o a permit. work noted: in salon on ground level. removed sheetrock replaced w/new sheet rock installed a bathroom. also remove storefront and replaced w/new store front. remedy: obtain a permit.

    Mar 26, 2009 · Penalty $400

    Resolve
  • Class - 2

    Work w/o a permit work noted in store on ground level user group open store currently partition created for 5 office spaces remedy: obtain permit

    Mar 10, 2009 · Penalty $800

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Oct 23, 2026 · Apt 26

    Open
  • Plumbing

    Bathtub/shower

    Oct 23, 2026 · Apt 26

    Open
  • Plumbing

    Basin/sink

    Oct 23, 2026 · Apt 26

    Open
  • Water leak

    Heavy flow

    Oct 17, 2026 · Apt 56

    Open
  • Plumbing

    Bathtub/shower

    Oct 17, 2026 · Apt 56

    Open
  • Unsanitary condition

    Garbage/recycling storage

    Sep 6, 2026 · Apt BLDG

    Close
  • Electric

    Outlet/switch

    Aug 14, 2026 · Apt 26

    Close
  • Plumbing

    Basin/sink

    Aug 14, 2026 · Apt 26

    Close
  • Plumbing

    Bathtub/shower

    Aug 14, 2026 · Apt 26

    Close
  • Heat/hot water

    Apartment only

    Nov 14, 2025 · Apt 53

    Close
Show 40 more ↓
  • Unsanitary condition

    Sewage

    Nov 10, 2025 · Apt 805

    Close
  • Unsanitary condition

    Pests

    May 2, 2025 · Apt 34

    Close
  • General

    Cabinet

    May 2, 2025 · Apt 34

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2025 · Apt BLDG

    Close
  • Plumbing

    Basin/sink

    Jan 16, 2025 · Apt 26

    Close
  • Plumbing

    Basin/sink

    Jan 16, 2025 · Apt 26

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Mar 8, 2024 · Apt 56

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2024 · Apt 2C

    Close
  • Heat/hot water

    Entire building

    Feb 21, 2024 · Apt BLDG

    Close
  • Appliance

    Electric/gas range

    Dec 26, 2023 · Apt 56

    Close
  • Heat/hot water

    Entire building

    Dec 23, 2023 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Aug 3, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 15, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 11, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 7, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 2, 2022 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 9, 2021 · Apt 53

    Close
  • Heat/hot water

    Entire building

    Dec 9, 2021 · Apt 34

    Close
  • Heat/hot water

    Entire building

    Dec 8, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 17, 2021 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Mar 8, 2021 · Apt 11

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2021 · Apt 34

    Close
  • Heat/hot water

    Apartment only

    Feb 19, 2021 · Apt 12

    Close
  • Heat/hot water

    Entire building

    Dec 1, 2020 · Apt BLDG

    Close
  • Safety

    Smoke detector

    Sep 10, 2020 · Apt 46

    Close
  • Safety

    Carbon monoxide detector

    Sep 10, 2020 · Apt 46

    Close
  • Electric

    Outlet/switch

    Sep 10, 2020 · Apt 46

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2020 · Apt 16

    Close
  • Heat/hot water

    Apartment only

    Nov 13, 2019 · Apt 54

    Close
  • Plumbing

    Basin/sink

    Sep 5, 2019 · Apt 1

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Walk-up apartment building (C7)
Year built
1928
Floors
6
Residential units
30
Building area
31,200 ft²
Lot area
5,800 ft²
Zoning
R7D
Community board
207
Council district
15
Block / lot
3279 / 35
Assessed value
$1,113,300
Landmark / historic district
No

HPD registration #201870, last renewed Sep 10, 2025.

Questions about 400 East 199 Street

Who owns 400 East 199 Street?

The owner of record in NYC Department of City Planning PLUTO data is 400 Webster Housing Development Fund Co..

Does 400 East 199 Street have violations?

Yes. NYC HPD has recorded 27 housing violations at this property.

Is 400 East 199 Street rent stabilized?

NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 400 East 199 Street built?

City records list 1928 as the year it was built.

How many apartments are in 400 East 199 Street?

It has 30 residential units and 36 units in total.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.