400 East 199 Street
Bronx, NY 10458BBL 2-03279-0035Map
Owner of record: 400 Webster Housing Development Fund Co.
400 East 199 Street is a walk-up apartment building built in 1928 in Bronx, 10458. It has 30 residential units across 6 floors. The owner of record is 400 Webster Housing Development Fund Co.. HPD has recorded 27 housing violations here, most recently on September 16, 2026. 10 of the 27 most recent violations are still open. City tax records listed 30 rent-stabilized apartments here in 2024.
- HPD violations
- 27
- DOB violations
- 9
- ECB violations
- 9
- HPD complaints
- 85
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 27
- BHazardous
Repair the leaky and/or defective faucets at sink in the kitchen located at apt 26, 3rd story, 1st apartment from south at west
Sep 16, 2026 · Apt 26
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste drain pipe at bathtub in the bathroom located at apt 26, 3rd story, 1st apartment from south at west
Sep 16, 2026 · Apt 26
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 26, 3rd story, 1st apartment from south at west
Sep 16, 2026 · Apt 26
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 26, 3rd story, 1st apartment from south at west
Sep 16, 2026 · Apt 26
Open — Nov sent out - CImmediately hazardous
Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at at west yard
Sep 16, 2026
Open — Nov certified on time - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 34, 4th story, 2nd apartment from south at west
Jun 8, 2025 · Apt 34
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 34, 4th story, 2nd apartment from south at west
Jun 8, 2025 · Apt 34
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective bottom shelf at sink base cabinet in the kitchen located at apt 34, 4th story, 2nd apartment from south at west
Jun 8, 2025 · Apt 34
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 26, 3rd story, 1st apartment from south at west
Jun 3, 2025 · Apt 26
Open — Notice of issuance sent to tenant
Show 17 more ↓
- CImmediately hazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at all walls and ceiling in the bathroom located at apt 26, 3rd story, 1st apartment from south at west
Jun 3, 2025 · Apt 26
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 53, 6th story, 1st apartment from north at east
Jan 3, 2022 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 53, 6th story, 1st apartment from north at east
Jan 3, 2022 · Apt 53
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing the doors that is missing or defective in the entrance located at apt 53, 6th story, 1st apartment from north at east
Jan 3, 2022 · Apt 53
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector inoperable located at apt 53, 6th story, 1st apartment from north at east
Jan 3, 2022 · Apt 53
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). inoperable located at apt 53, 6th story, 1st apartment from north at east
Jan 3, 2022 · Apt 53
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 1st room from east located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective grout and coulking around bathtub in the bathroom located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - BHazardous
Abate the nuisance consisting of mice in the entire apartment located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radiator in the 2nd room from east at north located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation radietor in the 2nd room from east located at apt 56, 6th story, 1st apartment from south at west
May 26, 2016 · Apt 56
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 1st room from east at south located at apt 12, 2nd story, 1st apartment from west at north
Sep 28, 2012 · Apt 12
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1; wg to replace = 0; wg to repair = 0; in the 4th room from east located at apt 12, 2nd story, 1st apartment from west at north
Sep 28, 2012 · Apt 12
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom located at apt 12, 2nd story, 1st apartment from west at north
Sep 28, 2012 · Apt 12
Closed — Violation dismissed - BHazardous
Provide dwelling with a janitor or responsible person or janitorial service.
Apr 20, 2011
Closed — Violation closed
DOB building violations · 9
- Construction other optional
Failure to maintain bldg in code compliant manner. deterioration of bldg @ exp1,2&3:cracks,step cracks damaged joints and bowed lintels crack window pane at exp3.exp4 damaged window sill, spalling and damaged joints. remedy: repair and/or replace
Jul 23, 2026
Dob violation - active - Construction other optional
Failure to maintain building in code compliant manner. note: observed @ exp#1 multiple cracked spalling window sill @ exp#2 multiple cracked window sills and spalling. at exp#3-observed spalling paint/tar multiple location & a step crack. remedy: fix and/or replace
Apr 4, 2025
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 13, 2019
Dob violation - active - Construction other optional
Emerg wrk ord:parapet coping stone@exp1/2 crnr fell on 8/22/19.coping stone@exp1/2 crnr@risk of collap onto 1story medical office roof.exp3 bricks@roof part detached from struct& @risk of collap into exp3 rear yard.own retain pe contr immed temp brace or remove loose coping stone instl [email protected] und cont&dir supv pe.file within 2 buss days strt
Aug 23, 2019
Dob violation - active - Construction other optional
Ftm:coping stone@exp 1/2 fell to sidewalk on 8/22/19.steel dunnage@exp 3/4 crnr bearing on parapet wall.exp3 brick chimney had part detached bricks 4'long at risk of part collap into rear yard.ownr retain pe to eval entire bldg incl roof,parapet,connect,chim&facades.pe to prepare repr dwgs.reprs to start under permit by 9/30/19 & be cmpl by 12/30/19
Aug 23, 2019
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 9
- Class - 2
Pedestrian protection does not meet code specification: observed the following. loose/defected section of shed parapet corner of exposure 1 and 2. remedy: comply to code specification.
Jul 23, 2026 · Penalty $2,400
Active - Class - 2
At time of inspection, observed sidewalk shed at exposure 1 of mixed-use 6-story building not maintained in compliance with code- shed posts installed less than 18 inches from curb, creating potential vehicle i
Jun 8, 2026 · Penalty $2,400
Active - Class - 1
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 east (1)step cracked brick/mortarjoints, north east corner of parapet.-exp #3 west-(1)cracked/spalling/
Mar 25, 2026 · Penalty $5,000
Active - Class - 2
At time of inspection of a 6-story building, i observed a sidewalk shed erected exp#1-2 not maintain as per code as per code 3307.6.4.10 founding and 5-feet pathway not maintain as per 3307.2.6..
Oct 2, 2025
Resolve - Class - 2
Failure to provide pedestrian protection.ato my insp of occupied 6stybw/sws erected@exp1,2.i noticed@exp2 sws isnt 5'w&additional pathway for public is creating uncapped bolts creating sharp edge.comply w/code&
Feb 8, 2022 · Penalty $2,400
Resolve - Class - 2
Failure to maintain bldg in code compliant manner/bldg walls on appurtenances. observed coping stone approx 10 in x 3ft fallen from left handcorner. remedy: maintain bldg walls.
Oct 8, 2019 · Penalty $3,125
Active - Class - 1
Failure to maintain building walls noted at time of inspection observed coing stone approx 10 in x 3 ft fallen from to left hand corner 9exposure 1&2) and landed on pulic sidewalk repair defects maintain buildi
Aug 22, 2019 · Penalty $12,500
Active - Class - 2
Work w/o a permit. work noted: in salon on ground level. removed sheetrock replaced w/new sheet rock installed a bathroom. also remove storefront and replaced w/new store front. remedy: obtain a permit.
Mar 26, 2009 · Penalty $400
Resolve - Class - 2
Work w/o a permit work noted in store on ground level user group open store currently partition created for 5 office spaces remedy: obtain permit
Mar 10, 2009 · Penalty $800
Resolve
Complaints
- Unsanitary condition
Mold
Oct 23, 2026 · Apt 26
Open - Plumbing
Bathtub/shower
Oct 23, 2026 · Apt 26
Open - Plumbing
Basin/sink
Oct 23, 2026 · Apt 26
Open - Water leak
Heavy flow
Oct 17, 2026 · Apt 56
Open - Plumbing
Bathtub/shower
Oct 17, 2026 · Apt 56
Open - Unsanitary condition
Garbage/recycling storage
Sep 6, 2026 · Apt BLDG
Close - Electric
Outlet/switch
Aug 14, 2026 · Apt 26
Close - Plumbing
Basin/sink
Aug 14, 2026 · Apt 26
Close - Plumbing
Bathtub/shower
Aug 14, 2026 · Apt 26
Close - Heat/hot water
Apartment only
Nov 14, 2025 · Apt 53
Close
Show 40 more ↓
- Unsanitary condition
Sewage
Nov 10, 2025 · Apt 805
Close - Unsanitary condition
Pests
May 2, 2025 · Apt 34
Close - General
Cabinet
May 2, 2025 · Apt 34
Close - Heat/hot water
Entire building
Jan 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 19, 2025 · Apt BLDG
Close - Plumbing
Basin/sink
Jan 16, 2025 · Apt 26
Close - Plumbing
Basin/sink
Jan 16, 2025 · Apt 26
Close - Heat/hot water
Entire building
Dec 3, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 8, 2024 · Apt 56
Close - Heat/hot water
Entire building
Feb 24, 2024 · Apt 2C
Close - Heat/hot water
Entire building
Feb 21, 2024 · Apt BLDG
Close - Appliance
Electric/gas range
Dec 26, 2023 · Apt 56
Close - Heat/hot water
Entire building
Dec 23, 2023 · Apt BLDG
Close - Plumbing
Water supply
Aug 3, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 15, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 11, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 7, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 3, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 2, 2022 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2021 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 9, 2021 · Apt 53
Close - Heat/hot water
Entire building
Dec 9, 2021 · Apt 34
Close - Heat/hot water
Entire building
Dec 8, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 17, 2021 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2021 · Apt 11
Close - Heat/hot water
Apartment only
Feb 19, 2021 · Apt 34
Close - Heat/hot water
Apartment only
Feb 19, 2021 · Apt 12
Close - Heat/hot water
Entire building
Dec 1, 2020 · Apt BLDG
Close - Safety
Smoke detector
Sep 10, 2020 · Apt 46
Close - Safety
Carbon monoxide detector
Sep 10, 2020 · Apt 46
Close - Electric
Outlet/switch
Sep 10, 2020 · Apt 46
Close - Heat/hot water
Entire building
Jan 21, 2020 · Apt 16
Close - Heat/hot water
Apartment only
Nov 13, 2019 · Apt 54
Close - Plumbing
Basin/sink
Sep 5, 2019 · Apt 1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1928
- Floors
- 6
- Residential units
- 30
- Building area
- 31,200 ft²
- Lot area
- 5,800 ft²
- Zoning
- R7D
- Community board
- 207
- Council district
- 15
- Block / lot
- 3279 / 35
- Assessed value
- $1,113,300
- Landmark / historic district
- No
HPD registration #201870, last renewed Sep 10, 2025.
Questions about 400 East 199 Street
Who owns 400 East 199 Street?
The owner of record in NYC Department of City Planning PLUTO data is 400 Webster Housing Development Fund Co..
Does 400 East 199 Street have violations?
Yes. NYC HPD has recorded 27 housing violations at this property.
Is 400 East 199 Street rent stabilized?
NYC Department of Finance tax bills listed 30 rent-stabilized units here in 2024 (about 100% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 400 East 199 Street built?
City records list 1928 as the year it was built.
How many apartments are in 400 East 199 Street?
It has 30 residential units and 36 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.