349 East 193 Street
Bronx, NY 10458BBL 2-03276-0038Map
Owner of record: Scg 349, LLC
349 East 193 Street is a walk-up apartment building built in 1911 in Bronx, 10458. It has 11 residential units across 5 floors. The owner of record is Scg 349, LLC. HPD has recorded 261 housing violations here, most recently on August 11, 2026. 26 of the 50 most recent violations are still open. City tax records listed 11 rent-stabilized apartments here in 2024.
- HPD violations
- 261
- DOB violations
- 5
- ECB violations
- 4
- HPD complaints
- 296
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 261
- BHazardous
Provide adequate supply of hot water for the fixtures inadequate hot water temperture 110 degrees on thermometer #7173 in the kitchen located at apt 7, 4th story, 2nd apartment from west at north
Aug 11, 2026 · Apt 7
Open — Civ14 mailed - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, presumed lead paint in an apartment with a child under six located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 6th room from north located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from west at north wall, south wall, 1st window frame from west at north wall in the 5th room from north located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall in the kitchen located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st riser from north at east wall, north wall in the 3rd room from north located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st riser from west at north wall in the bathroom located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall in the 1st room from north at west located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, 1st door frame from west at north wall, south wall in the 1st room from north at east located at apt 10, 5th story, 2nd apartment from west at north
Aug 2, 2026 · Apt 10
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Jul 28, 2026
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jul 28, 2026
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 10, 5th story, 2nd apartment from west at north
Jul 28, 2026 · Apt 10
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 28, 2026 · Apt 10
Open — Civ14 mailed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 4, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 28, 2026 · Apt 10
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 28, 2026 · Apt 10
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide ready access to buildings heating system door lock at boiler room
Jul 28, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 28, 2026 · Apt 10
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Jul 22, 2026
Closed — Violation closed - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings missing
Jul 22, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 2, 1st story, 2nd apartment from west at north
Jul 22, 2026 · Apt 2
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 6, 3rd story, 2nd apartment from west at north
Jul 22, 2026 · Apt 6
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures water supply fixtures at bathtub, wash basin and kitchen sink in the entire apartment located at apt 8, 4th story, 2nd apartment from west at north
Jul 22, 2026 · Apt 8
Open — Not complied with - CImmediately hazardous
Provide adequate supply of cold water for the fixtures water supply fixtures at bathtub, wash basin, water closet and kitchen sink in the entire apartment located at apt 8, 4th story, 2nd apartment from west at north
Jul 22, 2026 · Apt 8
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 8, 4th story, 2nd apartment from west at north
Jul 22, 2026 · Apt 8
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 22, 2026 · Apt 10
Open — Nov sent out - BHazardous
Provide adequate supply of hot water for the fixtures water supply fixtures at bathtub, wash basin and kitchen sink in the entire apartment located at apt 2, 1st story, 2nd apartment from west at north
Jul 22, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures water supply fixtures at bathtub, wash basin, water closet and kitchen sink in the entire apartment located at apt 2, 1st story, 2nd apartment from west at north
Jul 22, 2026 · Apt 2
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures water supply fixtures at bathtub, wash basin, water closet and kitchen sink in the entire apartment located at apt 6, 3rd story, 2nd apartment from west at north
Jul 22, 2026 · Apt 6
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures water supply fixtures at bathtub, wash basin and kitchen sink in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 22, 2026 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of cold water for the fixtures water supply fixtures at bathtub, wash basin, water bowl and kitchen sink in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Jul 22, 2026 · Apt 10
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures water supply fixtures at bathtub, wash basin and kitchen sink in the entire apartment located at apt 6, 3rd story, 2nd apartment from west at north
Jul 22, 2026 · Apt 6
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at building entrance , 1st story
Mar 3, 2026
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building vestibule , 1st story
Feb 4, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and assembly at building vestibule door , 1st story
Feb 4, 2026
Closed — Violation dismissed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall, 5th story
Jan 5, 2025
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at walls and ceiling in the 6th room from north located at apt 10, 5th story, 2nd apartment from west at north
Jan 5, 2025 · Apt 10
Closed — Violation dismissed - BHazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling and walls in the 5th room from north located at apt 10, 5th story, 2nd apartment from west at north
Jan 5, 2025 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures no volume in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Dec 19, 2024 · Apt 10
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective electrical light fixture from ceiling to east wall in the private hallway located at apt 10, 5th story, 2nd apartment from west at north
Dec 19, 2024 · Apt 10
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixture from ceiling to west wall in the 5th room from north located at apt 10, 5th story, 2nd apartment from west at north
Dec 19, 2024 · Apt 10
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical light fixture from ceiling to west wall in the 4th room from north located at apt 10, 5th story, 2nd apartment from west at north
Dec 19, 2024 · Apt 10
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Dec 9, 2024 · Apt 10
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Dec 9, 2024 · Apt 10
Open — Nov sent out - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Dec 9, 2024 · Apt 10
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in waste line at washbasin in the bathroom located at apt 10, 5th story, 2nd apartment from west at north
Dec 9, 2024 · Apt 10
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat from an approved central heating system, or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 10, 5th story, 2nd apartment from west at north
Dec 9, 2024 · Apt 10
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at bsmt-apt bsmt
Aug 29, 2024 · Apt BSMT
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at bsmt-apt bsmt
Aug 29, 2024 · Apt BSMT
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at bsmt-apt bsmt
Aug 29, 2024 · Apt BSMT
Closed — Violation dismissed
DOB building violations · 5
- Construction other optional
Ftc w/commissioner's order 042425pi20701sb control#348201 dated 04/24/2025 requiring owner to start bldg repairs under permit as of today's date 06/26/2025 there are no jobs filed in bis or dobnow to repair bldg. immed comply w/commissioner's order 042425pi20701sb control#348201 to repair bldg under permit
Jun 26, 2025
Dob violation - active - Construction other optional
Ftm bldg in a code compliant manner. obsv @ exp1 deteriorated cornice & at exp2 obsv a masonry crack at the parapet level. owner to immed retain nyspe to eval entire bldg, determine struct stab and prepare/ file dgws. bldg to be repaired under permit staring on may 24, 2025 and completed by june 22, 2025
Apr 24, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Apr 18, 2012
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed
ECB violations · 4
- Class - 2
Found weil mclain boiler was inoperable at time of inspection. talk tosuper he stated that the boiler was not working for a couple days. boiler switch was off at time of inspection.
Dec 10, 2024 · Penalty $310
Resolve - Class - 2
As of 11/13/2024 no final inspection filed for alt2 dob permit# 240243116 (expired: 01/03/2019). apartment at cellar renovated and fully occupied., conduct/file final inspection
Nov 13, 2024 · Penalty $1,280
Active - Class - 1
Work w/o a permit. based on physical observation of new work done in basement. no permits were issued/approved within 5 business days as stated and required on the emergency work notification (#7268) received o
Jan 6, 2012 · Penalty $800
Resolve - Class - 1
Failure to maintain bldg in code compliant manner.noted:@ stair case from 2 to 3fl the landing collapsed & the remaining landings are in disrepair & in danger of collapse.remedy:repair and or replace immediate
Dec 4, 2008 · Penalty $1,000
Resolve
Complaints
- General
Cooking gas
Oct 16, 2026 · Apt 1
Open - Plumbing
Radiator
Oct 16, 2026 · Apt 1
Open - Appliance
Refrigerator
Oct 16, 2026 · Apt 1
Open - Heat/hot water
Entire building
Jul 27, 2026 · Apt APT10
Close - Heat/hot water
Entire building
Jul 26, 2026 · Apt APT10
Close - Appliance
Electric/gas range
Jul 26, 2026 · Apt APT10
Close - Appliance
Electric/gas range
Jul 21, 2026 · Apt 10
Close - Appliance
Electric/gas range
Jul 21, 2026 · Apt 10
Close - Heat/hot water
Apartment only
Jul 21, 2026 · Apt 10
Close - Appliance
Refrigerator
Feb 3, 2026 · Apt 10
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 3, 2026 · Apt 10
Close - Heat/hot water
Entire building
Feb 2, 2026 · Apt 8
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt 8
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt 10
Close - Heat/hot water
Entire building
Dec 19, 2024 · Apt BLDG
Close - Electric
Power outage
Dec 14, 2024 · Apt 10
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt 10
Close - General
Bell/buzzer/intercom
Dec 5, 2024 · Apt 10
Close - Heat/hot water
Entire building
Dec 5, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 11, 2024 · Apt BASEME
Close - Unsanitary condition
Mold
Feb 24, 2024 · Apt 10
Close - Water leak
Heavy flow
Feb 24, 2024 · Apt 10
Close - Paint/plaster
Wall
Feb 23, 2024 · Apt BASEME
Close - Unsanitary condition
Pests
Feb 23, 2024 · Apt BASEME
Close - Heat/hot water
Apartment only
Feb 23, 2024 · Apt BASEME
Close - Heat/hot water
Apartment only
Feb 13, 2024 · Apt BASEME
Close - Unsanitary condition
Pests
Aug 1, 2023 · Apt 10
Close - Appliance
Refrigerator
Jul 25, 2023 · Apt 10
Close - Unsanitary condition
Pests
Jul 11, 2023 · Apt 10
Close - Unsanitary condition
Pests
Jul 11, 2023 · Apt 10
Close - Safety
Window guard broken/missing
Jun 21, 2023 · Apt 10
Close - Unsanitary condition
Pests
Jun 21, 2023 · Apt 10
Close - Plumbing
Basin/sink
Jun 21, 2023 · Apt 10
Close - Flooring/stairs
Floor
Jun 21, 2023 · Apt 10
Close - Plumbing
Water supply
Jun 21, 2023 · Apt 10
Close - General
Mailbox
Jun 21, 2023 · Apt 10
Close - Heat/hot water
Apartment only
Nov 14, 2022 · Apt 10
Close - Unsanitary condition
Pests
Oct 25, 2022 · Apt 10
Close - Unsanitary condition
Pests
Jun 29, 2022 · Apt BASEME
Close - Unsanitary condition
Pests
Jun 29, 2022 · Apt BASEME
Close - Paint/plaster
Wall
Jun 29, 2022 · Apt BASEME
Close - Door/window
Window frame
Jun 29, 2022 · Apt BASEME
Close - General
Ventilation system
Jun 29, 2022 · Apt BASEME
Close - Water leak
Heavy flow
Mar 17, 2022 · Apt 7
Close - Plumbing
Basin/sink
Mar 17, 2022 · Apt 7
Close - Plumbing
Bathtub/shower
Mar 17, 2022 · Apt 7
Close - Paint/plaster
Wall
Mar 17, 2022 · Apt 7
Close - Paint/plaster
Radiator
Mar 17, 2022 · Apt 7
Close - Flooring/stairs
Floor
Mar 17, 2022 · Apt 7
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1911
- Floors
- 5
- Residential units
- 11
- Building area
- 13,000 ft²
- Lot area
- 3,143 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3276 / 38
- Assessed value
- $360,900
- Landmark / historic district
- No
HPD registration #213037, last renewed Oct 16, 2025.
Questions about 349 East 193 Street
Who owns 349 East 193 Street?
The owner of record in NYC Department of City Planning PLUTO data is Scg 349, LLC.
Does 349 East 193 Street have violations?
Yes. NYC HPD has recorded 261 housing violations at this property.
Is 349 East 193 Street rent stabilized?
NYC Department of Finance tax bills listed 11 rent-stabilized units here in 2024 (about 100% of its 11 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 349 East 193 Street built?
City records list 1911 as the year it was built.
How many apartments are in 349 East 193 Street?
It has 11 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.