364 East 194th Street
Bronx, NY 10458BBL 2-03276-0028Map
Owner of record: Fordham Vaja LLC
364 East 194th Street is an elevator apartment building built in 2017 in Bronx, 10458. It has 12 residential units across 6 floors. The owner of record is Fordham Vaja LLC. HPD has recorded 38 housing violations here, most recently on October 7, 2025. City tax records listed 12 rent-stabilized apartments here in 2024.
- HPD violations
- 38
- DOB violations
- 4
- ECB violations
- 30
- HPD complaints
- 123
What to know
No open immediately-hazardous violations among recent records.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 38
- BHazardous
Properly repair or replace the broken or defective latch at door at public hall stairs, 2nd story
Oct 7, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door at public hall stairs, 2nd story
Oct 7, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 30 sq.ft. at west and south walls and around window casing in the 2nd room from east located at apt 2b, 2nd story, 1st apartment from east at south
Oct 7, 2025 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Abate the nuisnace consisting of rodents ..rats in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 13, 2014 · Apt 1
Closed — Violation closed - CImmediately hazardous
§ 27-2028, 2032 admin.code: provide an adequate supply of heat from an approved central heating system or an approved system of gas or electrical heating in good operating condition for the dwelling unit in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 13, 2014 · Apt 1
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceilings and walls through out in the entire apartment located at apt 1, 1st story, 1st apartment from north at east
Jan 13, 2014 · Apt 1
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the front yard at entire apartment, apartment
Oct 4, 2012 · Apt 1
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the ... yard at east
Jun 25, 2012
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the south court
Jun 23, 2012
Closed — Violation closed - BHazardous
Properly repair the broken or defective cement riser 4th up from bottom at front court
Jun 23, 2012
Closed — Violation closed
Show 28 more ↓
- BHazardous
Abate the nuisance consisting of roaches in the entire apartment located at apt 1, 1st story
Feb 1, 2011 · Apt 1
Closed — Violation closed - BHazardous
Abate the nuisance consisting of bedbugs in the entire apartment located at apt 1, 1st story
Feb 1, 2011 · Apt 1
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceiling light fixtre in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in uniform color the ceiling in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceiling light fixture in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - ANon-hazardous
Refit wooden door in the 2nd room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - ANon-hazardous
Refit wooden door in the 1st room from east located at apt 2, 2nd story, 1st apartment from east at south
Sep 30, 2008 · Apt 2
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective cement and ceramic floor tiles in the bathroom located at apt 1fl, 1st story
Sep 4, 2008 · Apt 1FL
Closed — Violation closed - BHazardous
Replace with new the broken or defective sink base cabinet in the kitchen located at apt 1fl, 1st story
Sep 4, 2008 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rats in the entire apartment located at apt 1fl, 1st story
Sep 4, 2008 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Abate the nuisnace consisting of rodents rat excreta throughtout in the entire apartment located at apt 2, 2nd story, 1st apartment from south at west
Aug 5, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceiling light fixture in the 1st room from east located at apt 2, 2nd story
Aug 5, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective ceiling light fixture in the 2nd room from north located at apt 2, 2nd story
Aug 5, 2008 · Apt 2
Closed — Violation closed - BHazardous
Replace with new the broken or defective diverter and spindle at faucet at bathtub in the bathroom located at apt 2, 2nd story, 1st apartment from east at south
Aug 5, 2008 · Apt 2
Closed — Violation closed - CImmediately hazardous
Remove the illegal fastening lockable devise at entrance door to vestibule at public hall
Feb 23, 2008
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin roaches in the entire apartment located at apt 2, 2nd story
Feb 23, 2008 · Apt 2
Closed — Violation closed - BHazardous
Abate the nuisance consisting of vermin mice in the entire apartment located at apt 2, 2nd story
Jan 25, 2007 · Apt 2
Closed — Violation closed - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall, 1st story
Jan 25, 2007
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1fl, 1st story, apartment at east
Apr 19, 2003 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the entire apartment located at apt 1fl, 1st story, apartment at east
Apr 19, 2003 · Apt 1FL
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures , in the entire apartment located at apt 2fl, 2nd story
Mar 20, 2003 · Apt 2FL
Closed — Violation closed - ANon-hazardous
Properly repair the broken or defective refrigerator gasket in the kitchen located at apt 2fl, 2nd story
Dec 3, 2002 · Apt 2FL
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 2fl, 2nd story
Dec 3, 2002 · Apt 2FL
Closed — Violation closed - BHazardous
Cleanse and disinfect to the satisfaction of this department after removing the rubbish at south rear. in the yard located at public parts bldg
Feb 10, 2002 · Apt BLDG
Closed — Violation closed - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the north, south, east and west yard
Apr 20, 2001
Closed — Violation closed
DOB building violations · 4
- Construction other optional
Notice of order to stop work immediately due to withdrawal of applicant-special inspections appl #220399824. unable to gain access to verify the percentage of work completed.
Sep 29, 2023
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 5, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 6, 2017
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jan 16, 2002
V%*-dob violation - dismissed
ECB violations · 30
- Class - 1
Class 1 item: car door hangs up on door restrictor on 6th floor and does not open, forcing tenants to use the 5th floor stairs for access. in violation of asme a17.1-2013 2.14.5.7 and 8.6.1.2.1.
May 8, 2026 · Penalty $1,250
Resolve - Class - 2
Class 2 item: failure to provide required in-car emergencey communication. emergencey phone not connected to a location staffed by authorized personnel, in violation of nyc bc 3002.1, appendix k; asme a17.1 2.2
Feb 25, 2026 · Penalty $655
Resolve - Class - 2
Bc 3301.2 : fail to maintain safety measures. at time of inspection i observed missing circuit breaker cover panels. inadequately maintained guardrails at elevator shaft and holes larger than 2 inches allowing
Jan 9, 2024 · Penalty $2,500
Resolve - Class - 2
Competent person : at time of inspection i observed 5 workers upon request to see construction super none was present upon request to see competent person the 1 present was for 368 east 194 st. failure to prov
Jan 9, 2024
Resolve - Class - 2
Bc 3301.7: documents to be kept on site. at time of inspection i observed active construction work in progress upon request to see super's daily log book, pre shift , site plans none where provided for this sit
Jan 9, 2024 · Penalty $1,250
Resolve - Class - 2
Temporary construction equipment on site-expired permit. as noted:at time of inspection const site of a proposed 5 story building was closed. observed const fence permit had expired on the 5/26/23 w/ permit#220
Jun 6, 2023
Resolve - Class - 1
Failure to communicate required information to workers during pre-shift safety meetings.at time of inspection on active 5 story nb construction site observed workers on site and the building at the 5th floor wh
Aug 24, 2021 · Penalty $5,000
Resolve - Class - 2
Superintendent failed to perform duties as per rule.at time of inspectin on active 5 story nb construction site.observed conditions on site that went uncorrected by superintendent on site.failure to maintain an
Aug 24, 2021 · Penalty $10,000
Resolve - Class - 1
Failure to maintain guardrails on site as per code.at time of inspectin on active 5 story nb construction site observed at elevator shaft inadequate guard rail not maintained and throughout the site the contrac
Aug 24, 2021 · Penalty $2,500
Resolve - Class - 1
Permit holder failed to ensure workers receive site safety orientationat time of inspection of a 5 story new bldg active job site observed workers performing cmu block work & housekeeping.upon request for work
Jun 25, 2021 · Penalty $5,000
Resolve
Show 20 more ↓
- Class - 2
Construction superintendent failed to perform his duties as per code. at time of inspection of 5 story active jobsite observed 9 workers performing cmu block work & after full inspection,observed that construct
Jun 25, 2021 · Penalty $2,500
Resolve - Class - 1
Failure to maintain adequate housekeeping.at the time of inspection of5 story new bldg active job observed excessive amount of debris throughout the site.debris consisting of brick,cmu,garbage bags,wood,lumber,
Jun 25, 2021 · Penalty $6,250
Resolve - Class - 1
Permit holder failed to ensure workers attend pre-shift safety meetingprior to commencement to work.at time of inspection of 5 story new bldg active job site,observed 9 workers at the site performing cmu blockw
Jun 25, 2021 · Penalty $5,000
Resolve - Class - 1
Bc3309.1 failure to provide adjacent property protection.at time of inspection of active job site,5 story new bldg observed 9 workers performing block work of 5th fl,also observe that there is no protection for
Jun 25, 2021 · Penalty $2,500
Resolve - Class - 1
Bc3301.2 failure to maintain adequate fall protection,guardrails system bc3308.7,vertical netting system bc3308.5 at time of inspection of 5story new bldg active job site,observed 9 workers performing cmu block
Jun 25, 2021 · Penalty $6,250
Resolve - Class - 2
Work without permit / expired permit. at time of inspection, observed, at 2nd floor, erecting side wall, partition wall by cmu block and other construction works is in progress where permit # 220399824-01-nb (i
Oct 20, 2020 · Penalty $620
Resolve - Class - 2
Construction superintendent failed to perform duties as per rule at time of inspection i observed an active construction site with cmu blockwalls & steel c-joints on progress.during inspection i ask workers for
Sep 19, 2020 · Penalty $2,500
Resolve - Class - 2
Bc3301.2 no overhead protection at time of inspection i observed an active construction site with cmu block walls and steel work on progressduring inspection noted at the plan at exposure 3 and also at exposure
Sep 19, 2020
Resolve - Class - 2
Bc 3303.4 failure to maintain adequate housekeeping per section required at time of inspection i observed an active construction site with cmu block walls & steel on progress.during inspection noted at pile of
Sep 19, 2020
Resolve - Class - 1
Failure to have construction superintendent present at site as required.at time of inspection on an active jobsite of a 5-story nb,observed that no construction superintendent and or competent person was on sit
Oct 21, 2019 · Penalty $10,000
Resolve - Class - 1
Failure to designate and/or have construction superintendent present at site as required.at time of inspection i observed two(2) worker conductiong construction activites on the ground floor of the new structur
Oct 10, 2019
Resolve - Class - 2
Failure to safeguard all persons & property affected by construction operation & equipment. proposed nb 5 sty stalled site. i observed fence at exp#1 leaning heavily towards public sidewalk. members of the comm
Feb 7, 2019 · Penalty $5,000
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operation & equipment. at time of inspection,i observed a stalled site w/site fence leaning outward towards the public sidewalk. a community
Feb 7, 2019
Resolve - Class - 1
Unlawfully continued work while on notice of stop work order. on 6-5-17 ecb#35247583n due to unsafe excavation operation which exposed the adjacent properties doorway to the construction site & undermined a blo
May 21, 2018
Resolve - Class - 1
Construction super failed to perform duties.at the time of inspection the following unsafe conditions observed while under the supervision of(dilbag singh #023135)missing rebar caps,missing guard rails.the cons
Jun 5, 2017 · Penalty $1,600
Resolve - Class - 1
Failure to safeguard all persons and property affected by constructionoperations while performing excavation work contractors did not install proper safeguards.the excavation exposed the adjacent properties sid
Jun 5, 2017 · Penalty $5,000
Resolve - Class - 2
3307.7.7 condition of fences. note: demolition jobsite fence of exp#1is not being maintained sections leaning towards public sidewalk,pro truding nai/screws splitered wood,gaps in fence towards right side of
Aug 18, 2016
Resolve - Class - 2
Failure to post permit at jobsite fence. at time of inspection noted that the jobsite permit was not posted at exp#1 of the jobsite fence as per code requirement. rmdy: comply w/code post demo permit and fenc
Mar 10, 2016
Resolve - Class - 2
Fence viewing panel. at time of inspection noted that the jobsite fence did not have the required viewing panels as required by code.12"x12"square 4' to 6' from grade at sidewalk.with plexiglass on non fragile
Mar 10, 2016
Resolve - Class - 2
Job site fence not painted hunter green. at time of inspection noted that the jobsite fence had a door on the fence in white therefore the job site fence is not in compliance not fully painted hunter green as
Mar 10, 2016
Resolve
Complaints
- Unsanitary condition
Mold
Sep 13, 2026 · Apt 2F
Close - Water leak
Slow leak
Sep 13, 2026 · Apt 2F
Close - Door/window
Window pane
May 4, 2026 · Apt 1F
Close - Unsanitary condition
Garbage/recycling storage
Feb 25, 2026 · Apt BLDG
Close - Unsanitary condition
Mold
Oct 3, 2025 · Apt 2B
Close - Appliance
Electric/gas range
Oct 3, 2025 · Apt 2B
Close - Paint/plaster
Radiator
Jan 10, 2014 · Apt 1
Close - Nonconst
Vermin
Jan 10, 2014 · Apt 1
Close - Heating
Heat related
Dec 2, 2013 · Apt 1
Close - Nonconst
Rubbish
Oct 8, 2013 · Apt 1
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Oct 8, 2013 · Apt 1
Close - Plumbing
Water-leaks
Oct 8, 2013 · Apt 1
Close - General
Mold
Oct 8, 2013 · Apt 1
Close - Nonconst
Vermin
Oct 8, 2013 · Apt 1
Close - General
Cabinet
Jan 3, 2013 · Apt 1
Close - Paint/plaster
Ceiling
Jan 3, 2013 · Apt 1
Close - Paint/plaster
Wall
Jan 3, 2013 · Apt 1
Close - General
Floor
Jan 3, 2013 · Apt 1
Close - General
Floor
Jan 3, 2013 · Apt 1
Close - Paint/plaster
Ceiling
Jan 3, 2013 · Apt 1
Close - Paint/plaster
Ceiling
Jan 3, 2013 · Apt 1
Close - Nonconst
Rubbish
Sep 12, 2012 · Apt 1
Close - Nonconst
Rubbish
Sep 12, 2012 · Apt 1
Close - Nonconst
Vermin
Sep 12, 2012 · Apt 1
Close - Nonconst
Vermin
Sep 12, 2012 · Apt 1
Close - Plumbing
Water-leaks
Sep 12, 2012 · Apt 1
Close - Paint/plaster
Ceiling
Sep 12, 2012 · Apt 1
Close - Nonconst
Vermin
Jun 21, 2012 · Apt 2
Close - General
Stairs
Jun 21, 2012 · Apt 1
Close - Nonconst
Vermin
Jun 21, 2012 · Apt 1
Close - Nonconst
Vermin
Jun 21, 2012 · Apt 2
Close - Nonconst
Rubbish
Jun 21, 2012 · Apt 1
Close - Nonconst
Rubbish
Jun 21, 2012 · Apt 2
Close - Nonconst
Vermin
Jun 21, 2012 · Apt 2
Close - Nonconst
Vermin
Jun 21, 2012 · Apt 2
Close - General
Stairs
Jun 21, 2012 · Apt 2
Close - Plumbing
Water-leaks
Apr 5, 2012 · Apt 1
Close - Plumbing
Water-leaks
Apr 5, 2012 · Apt 1
Close - Paint/plaster
Wall
Apr 5, 2012 · Apt 1
Close - Nonconst
Vermin
Feb 9, 2011 · Apt 1
Close - Nonconst
Vermin
Jan 28, 2011 · Apt 1
Close - Nonconst
Rubbish
Jan 28, 2011 · Apt 1
Close - Heating
Heat related
Jan 28, 2011 · Apt 1
Close - Nonconst
Vermin
Jan 28, 2011 · Apt 1
Close - Heating
Heat related
Jan 6, 2011 · Apt 1
Close - Nonconst
Rubbish
Jan 6, 2011 · Apt 1
Close - Nonconst
Vermin
Jan 6, 2011 · Apt 1
Close - Paint/plaster
Ceiling
Aug 19, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Aug 19, 2009 · Apt 2
Close - Paint/plaster
Ceiling
Aug 19, 2009 · Apt 2
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D3)
- Year built
- 2017
- Floors
- 6
- Residential units
- 12
- Building area
- 9,385 ft²
- Lot area
- 2,757 ft²
- Zoning
- R7B
- Community board
- 207
- Council district
- 15
- Block / lot
- 3276 / 28
- Assessed value
- $703,800
- Landmark / historic district
- No
HPD registration #229093, last renewed Sep 17, 2025.
Questions about 364 East 194th Street
Who owns 364 East 194th Street?
The owner of record in NYC Department of City Planning PLUTO data is Fordham Vaja LLC.
Does 364 East 194th Street have violations?
Yes. NYC HPD has recorded 38 housing violations at this property.
Is 364 East 194th Street rent stabilized?
NYC Department of Finance tax bills listed 12 rent-stabilized units here in 2024 (about 100% of its 12 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 364 East 194th Street built?
City records list 2017 as the year it was built.
How many apartments are in 364 East 194th Street?
It has 12 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.