roofy

3130 Albany Crescent

Bronx, NY 10463BBL 2-03267-0020Map

Owner of record: House , Keith

3130 Albany Crescent is an elevator apartment building built in 1963 in Bronx, 10463. It has 59 residential units across 7 floors. The owner of record is House , Keith. HPD has recorded 109 housing violations here, most recently on January 4, 2025. 12 of the 50 most recent violations are still open. City tax records listed 59 rent-stabilized apartments here in 2024.

HPD violations
109
DOB violations
28
ECB violations
5
HPD complaints
185

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Jan 4, 2025

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
59
About 100% of the building's 59 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 109

  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the 1st room from east at south located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • B

    Replace the broken or defective the bathtub or reglaze the bathtub in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • B

    Replace the broken or defective cracked wssh basin in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and all walls in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective the ceramic tile grout at all walls in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective the ceramic tiles at west wall in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the south wall in the 1st room from east at north located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the stool to window at east in the 1st room from east at north located at apt 3c, 3rd story, 1st apartment from east at south

    Jan 4, 2025 · Apt 3C

    Closed — Violation dismissed
Show 40 more ↓
  • C

    Replace or repair the self-closing doors that is missing or defective frame at ''stair z'' at public hall stairs, 1st story

    Oct 16, 2024

    Closed — Violation dismissed
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 6f, 6th story, 3rd apartment from south at west

    Oct 7, 2024 · Apt 6F

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges, at laundry room

    Oct 7, 2024

    Closed — Violation closed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from north located at apt 4j, 4th story, 1st apartment from north at east , section ''north''

    Jun 11, 2024 · Apt 4J

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from north located at apt 4j, 4th story, 1st apartment from north at east , section ''north''

    Jun 11, 2024 · Apt 4J

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective refinish enamel at bathtub by method of reglazing in the bathroom located at apt 4j, 4th story, 1st apartment from north at east , section ''north''

    Jun 11, 2024 · Apt 4J

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 4j, 4th story, 1st apartment from north at east , section ''north''

    Jun 11, 2024 · Apt 4J

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 4j, 4th story, 1st apartment from north at east , section ''north''

    Jun 11, 2024 · Apt 4J

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the bathroom located at apt 4j, 4th story, 1st apartment from north at east , section ''north''

    Jun 11, 2024 · Apt 4J

    Open — Certification postponment denied
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 3c, 3rd story, 1st apartment from east at south

    Feb 29, 2024 · Apt 3C

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3c, 3rd story, 1st apartment from east at south

    Feb 29, 2024 · Apt 3C

    Open — Invalid certification
  • C

    Properly repair or replace the broken or defective radiator at east wall in the 3rd room from north at east located at apt 3c, 3rd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 3C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 3C

    Open — Nov certified late
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 3c, 3rd story, 1st apartment from east at south

    Feb 5, 2024 · Apt 3C

    Open — Nov certified late
  • C

    Provide an adequate supply of heat for the apartment in the 2nd room from east located at bsmt-apt l4, 1st bsmt-apt from west at north

    Jan 3, 2024 · Apt L4

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at bsmt-apt l4, 1st bsmt-apt from west at north

    Jan 3, 2024 · Apt L4

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all walls in the 3rd room from east at north located at apt l4, 1st apartment from west at north

    Dec 26, 2023 · Apt L4

    Closed — Violation closed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling and all walls in the 3rd room from east at north located at apt l4, 1st apartment from west at north

    Dec 26, 2023 · Apt L4

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at north and west wall in the 1st room from east at south located at apt l4, 1st apartment from west at north

    Dec 26, 2023 · Apt L4

    Closed — Violation closed
  • A

    Properly repair the source and abate the evidence of a water leak at north and west wall in the 1st room from east at south located at apt l4, 1st apartment from west at north

    Dec 26, 2023 · Apt L4

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective fire door at public hall, 2nd story

    Nov 13, 2023

    Closed — Violation closed
  • B

    Repair the roof so that it will not leak at ceiling in the private hallway located at apt 6g, 6th story, 1st apartment from north at east

    Oct 3, 2023 · Apt 6G

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6g, 6th story, 1st apartment from north at east

    Oct 3, 2023 · Apt 6G

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective basement door leading to rear parking lot south section at public hall

    Sep 16, 2023

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ceramic tiles at floor (cracked) in the bathroom located at bsmt-apt l4, 1st bsmt-apt from west at north

    Sep 16, 2023 · Apt L4

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing metal door stopper at 2nd door leading to rear yard north section basement at public hall

    Sep 16, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing metal door stopper at door leading to rear yard north section basement at public hall

    Sep 16, 2023

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at west wall in the private hallway located at apt l4, 1st apartment from west at north

    Sep 16, 2023 · Apt L4

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective 2nd door leading to rear parking lot south section basement at public hall

    Sep 16, 2023

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing metal door stopper at basement door leading to rear yard north section at public hall

    Sep 16, 2023

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood at bottom of wash basin cabinet in the bathroom located at apt l4, 1st apartment from west at north

    Sep 16, 2023 · Apt L4

    Closed — Violation dismissed
  • C

    Repair the broken or defective connection waste line pipe at sink in the kitchen located at bsmt-apt l4, 1st bsmt-apt from west at north

    Sep 16, 2023 · Apt L4

    Closed — Violation closed
  • C

    Properly repair with similar material the broken or defective ceramic tiles cracked at east wall in the bathroom located at bsmt-apt l4, 1st bsmt-apt from west at north

    Sep 16, 2023 · Apt L4

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective porcelain enamel by method of reglazing at bathtub in the bathroom located at apt l4, 1st apartment from west at north

    Sep 16, 2023 · Apt L4

    Closed — Violation closed
  • B

    Repair or replace the carbon monoxide detecting device(s). missing located at apt 3d, 3rd story, 1st apartment from south at west

    Jun 29, 2023 · Apt 3D

    Open — Nov sent out
  • B

    Trace and repair the source and abate the visible mold condition... ( approx. 4 sq. ft.) at north wall in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west original violation 16068009 issued 29-jun-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    Jun 29, 2023 · Apt 3D

    Closed — Violation dismissed
  • B

    Repair or replace the smoke detector missing located at apt 3d, 3rd story, 1st apartment from south at west

    Jun 29, 2023 · Apt 3D

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... ( approx. 4 sq. ft.) at north wall in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Jun 29, 2023 · Apt 3D

    Closed — Violation closed
  • C

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3d, 3rd story, 1st apartment from south at west

    Jun 29, 2023 · Apt 3D

    Closed — Violation dismissed
  • B

    Trace and repair the source and abate the visible mold condition... at wood floor inside cabinet under the sink ( basement apartment ) in the kitchen located at apt l4, 1st apartment from west at north original violation 15990613 issued 19-may-23 has been upgraded to class b per administrative code §27-2017.3a(3)(a) or (b).

    May 19, 2023 · Apt L4

    Closed — Violation closed

DOB building violations · 28

  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9b technical report by 2/21/2023

    Feb 22, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 11, 2020

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Mar 18, 2019

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Mar 17, 2019

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 20, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 1, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 29, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 29, 2016

    Dob violation - resolved
Show 18 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 24, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Sep 22, 2014

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2012 inspection report

    May 15, 2014

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2013

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jun 3, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 28, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 21, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 23, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 16, 2008

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Mar 21, 2008

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 27, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 31, 2005

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Feb 19, 2002

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed

ECB violations · 5

  • Class - 2

    Failure to submit an acceptable required cycle 9b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #908135. remedy: submit acceptable requ

    Apr 11, 2024 · Penalty $1,250

    Active
  • Class - 2

    Failure to submit a required cycle 8b report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control #808135.rmdy: submit required technical report.

    Oct 15, 2018 · Penalty $625

    Active
  • Class - 2

    B254 15.34a.50. 15 exposed wood over boiler 50 debris in bsmt waste oil and rags

    Jul 1, 2009 · Penalty $250

    Active
  • Non-hazardous

    Failure to maintain plumbing and appurtenances non-hazardous.found all trhough brains at base of pitchen paveo parking lot paked full of debris and not capeable of excepting storm water.causing storm water to

    Sep 1, 2000

    Resolve
  • Non-hazardous

    03m 05j 22l 50y 52y #03m7 capacity plate #05j11 too much gap topost

    Nov 9, 1998 · Penalty $180

    Resolve

Complaints

  • Door/window

    Window frame

    Sep 27, 2026 · Apt 6F

    Open
  • Paint/plaster

    Ceiling

    Sep 4, 2026 · Apt 2D

    Close
  • Heat/hot water

    Entire building

    Jan 16, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Wall

    Dec 30, 2025 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Oct 28, 2025 · Apt 604

    Close
  • Heat/hot water

    Apartment only

    Oct 27, 2025 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Apr 8, 2025 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Jan 2, 2025 · Apt 3F

    Close
  • Paint/plaster

    Wall

    Dec 17, 2024 · Apt 3C

    Close
  • Heat/hot water

    Entire building

    Nov 9, 2024 · Apt BLDG

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Nov 3, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 28, 2024 · Apt 3F

    Close
  • Paint/plaster

    Ceiling

    Oct 15, 2024 · Apt 6G

    Close
  • Heat/hot water

    Entire building

    Oct 15, 2024 · Apt 6G

    Close
  • Safety

    Carbon monoxide detector

    Jun 7, 2024 · Apt 4J

    Close
  • Heat/hot water

    Entire building

    Mar 23, 2024 · Apt BLDG

    Close
  • Paint/plaster

    Door/frame

    Feb 3, 2024 · Apt 3C

    Close
  • Paint/plaster

    Wall

    Feb 3, 2024 · Apt 3C

    Close
  • Heat/hot water

    Apartment only

    Feb 3, 2024 · Apt 3C

    Close
  • Paint/plaster

    Ceiling

    Dec 19, 2023 · Apt L4

    Close
  • Paint/plaster

    Wall

    Dec 19, 2023 · Apt L4

    Close
  • Water leak

    Heavy flow

    Dec 19, 2023 · Apt L4

    Close
  • Heat/hot water

    Apartment only

    Dec 19, 2023 · Apt L4

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2023 · Apt L4

    Close
  • Heat/hot water

    Entire building

    Nov 27, 2023 · Apt L4

    Close
  • Heat/hot water

    Entire building

    Nov 11, 2023 · Apt L4BUIL

    Close
  • Heat/hot water

    Entire building

    Nov 10, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Nov 9, 2023 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Nov 1, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Oct 31, 2023 · Apt 3F

    Close
  • Heat/hot water

    Entire building

    Oct 31, 2023 · Apt BLDG

    Close
  • Unsanitary condition

    Mold

    Oct 4, 2023 · Apt 6G

    Close
  • Water leak

    Slow leak

    Sep 25, 2023 · Apt 6G

    Close
  • Water leak

    Slow leak

    Sep 15, 2023 · Apt L4

    Close
  • Paint/plaster

    Wall

    Sep 15, 2023 · Apt L4

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2023 · Apt L4

    Close
  • Unsanitary condition

    Mold

    Sep 15, 2023 · Apt L4

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2023 · Apt L4

    Close
  • Water leak

    Heavy flow

    Sep 15, 2023 · Apt L4

    Close
  • Paint/plaster

    Wall

    Sep 15, 2023 · Apt L4

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2023 · Apt L4

    Close
  • Flooring/stairs

    Floor

    Sep 15, 2023 · Apt L4

    Close
  • Plumbing

    Bathtub/shower

    Sep 15, 2023 · Apt L4

    Close
  • Plumbing

    Basin/sink

    Sep 15, 2023 · Apt L4

    Close
  • General

    Cabinet

    Sep 15, 2023 · Apt L4

    Close
  • Paint/plaster

    Wall

    Sep 15, 2023 · Apt L4

    Close
  • Unsanitary condition

    Mold

    Sep 15, 2023 · Apt L4

    Close
  • Water leak

    Slow leak

    Sep 15, 2023 · Apt L4

    Close
  • Door/window

    Door

    Sep 15, 2023 · Apt L4

    Close
  • Unsanitary condition

    Mold

    Sep 15, 2023 · Apt L4

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1963
Floors
7
Residential units
59
Building area
58,000 ft²
Lot area
14,625 ft²
Zoning
R6
Community board
208
Council district
14
Block / lot
3267 / 20
Assessed value
$1,823,400
Landmark / historic district
No

HPD registration #221419, last renewed Aug 28, 2025.

Questions about 3130 Albany Crescent

Who owns 3130 Albany Crescent?

The owner of record in NYC Department of City Planning PLUTO data is House , Keith.

Does 3130 Albany Crescent have violations?

Yes. NYC HPD has recorded 109 housing violations at this property.

Is 3130 Albany Crescent rent stabilized?

NYC Department of Finance tax bills listed 59 rent-stabilized units here in 2024 (about 100% of its 59 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 3130 Albany Crescent built?

City records list 1963 as the year it was built.

How many apartments are in 3130 Albany Crescent?

It has 59 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.