3810 Bailey Avenue
Bronx, NY 10463BBL 2-03263-0007Map
Owner of record: 3810 LLC
3810 Bailey Avenue is a walk-up apartment building built in 1925 in Bronx, 10463. It has 57 residential units across 5 floors. The owner of record is 3810 LLC. HPD has recorded 186 housing violations here, most recently on May 19, 2026. 12 of the 50 most recent violations are still open. City tax records listed 56 rent-stabilized apartments here in 2024.
- HPD violations
- 186
- DOB violations
- 24
- ECB violations
- 18
- HPD complaints
- 7,701
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 186
- CImmediately hazardous
Provide adequate supply of cold water for the fixtures at bathroom and in the kitchen located at apt 1e, 1st story, 1st apartment from west at north , section ''3810''
May 19, 2026 · Apt 1E
Closed — Violation dismissed - CImmediately hazardous
Provide adequate supply of hot water for the fixtures at bathroom and in the kitchen located at apt 1e, 1st story, 1st apartment from west at north , section ''3810''
May 19, 2026 · Apt 1E
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Apr 26, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Apr 26, 2026
Open — Nov sent out - BHazardous
Replace with new the missing latch and it's assembly at building entrance door 1st story (street to vestibule door) (section 3810)
Apr 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at building entrance door 1st story (street to vestibule door) (section 3810)
Apr 26, 2026
Closed — Violation closed - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd.
Apr 26, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in private dwellings signage missing
Apr 26, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective latch and it's assembly at door (street to vestibule) (door a and b) at street level at basement, section ''3810'', at south
Apr 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule door 1st story public hall (section 3810)
Apr 26, 2026
Closed — Violation closed
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective latch and it's assembly at vestibule door 1st story public hall (section 3810)
Apr 26, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective latch at vestibule door ( intercom at vestibule ) , 2nd story
Mar 5, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at vestibule , 2nd story
Mar 5, 2026
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system lock door at boiler room
Feb 10, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge at door in the entrance located at apt a, 1st story, 1st apartment from east at south
Feb 10, 2026 · Apt A
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1b, 2nd story, 1st apartment from south at west
Feb 10, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1b, 2nd story, 1st apartment from south at west
Feb 10, 2026 · Apt 1B
Open — Nov sent out - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt a, 1st story, 1st apartment from east at south
Feb 10, 2026 · Apt A
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Feb 6, 2026
Open — Not complied with - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt grb, 1st story, 1st apartment from north at east
Feb 6, 2026 · Apt GRB
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt grb, 1st story, 1st apartment from north at east
Feb 6, 2026 · Apt GRB
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective heavy duty lock at vestibule door leading into public hall , 2nd story, section ''3810''
Feb 6, 2026
Open — Not complied with - CImmediately hazardous
M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 1d, 2nd story, 1st apartment from north at east , section ''3820''
Dec 4, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 4, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule door , 2nd story, section ''3820''
Dec 4, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set at vestibule door , 2nd story, section ''3820''
Dec 4, 2025
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 square feet at north east and west walls in the bathroom located at apt 1d, 2nd story, 1st apartment from north at east , section ''3820''
Dec 4, 2025 · Apt 1D
Open — First no access to re- inspect violation - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 2nd story, 1st apartment from north at east , section ''3820''
Dec 4, 2025 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 4th room from east located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and the north wall in the 1st room from east located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing escutcheon plate at ceiling riser in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the steam riser in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective marble saddle ( cracked )at entrance door in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling and north wall in the 1st room from east located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 4th room from east located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4c, 5th story, 1st apartment from east at south
Oct 22, 2025 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective glass window at vestibule door , 1st story
Feb 23, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at vestibule leading to public hall , 1st story, section ''3810''
Jan 27, 2025
Closed — Violation closed - BHazardous
Repair the roof so that it will not leak at ceiling in the 1st room from east located at apt 5c, 6th story, 1st apartment from east at south , section ''3810'', at south
Dec 17, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 1st room from east located at apt 5c, 6th story, 1st apartment from east at south , section ''3810'', at south
Dec 17, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 5c, 6th story, 1st apartment from east at south , section ''3810'', at south
Dec 17, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the roof so that it will not leak at ceiling in the foyer located at apt 5c, 6th story, 1st apartment from east at south , section ''3810'', at south
Dec 17, 2024 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Repair the roof so that it will not leak active water leak at ceiling in the 4th room from east located at apt 5c, 6th story, 1st apartment from east at south , section ''3810'', at south
Dec 17, 2024 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector defective in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Dec 7, 2024 · Apt 4C
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water above 130 degrees. in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Dec 7, 2024 · Apt 4C
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). defective in the entire apartment located at apt 4c, 4th story, 1st apartment from east at south
Dec 7, 2024 · Apt 4C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the kitchen , the bathroom located at apt 5c, 5th story, 1st apartment from east at south
Jun 18, 2024 · Apt 5C
Closed — Violation dismissed
DOB building violations · 24
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2023
Dob violation - active - Construction other optional
Request additional information-respondents requested to provide a s/s letter along w/detailed calcs,dwgs,foundation details,soil types,etc in accordance w/1rcny 103-09 identifying the factural basis(incl dates pe personally visited the site)of the eng'r assesment report regarding the struct stability of the r/w
Feb 16, 2023
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - active - Retaining wall none
Failed to file cycle 1 technical report by 12/31/2018 per rcny 103-09
Oct 1, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed
Show 14 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 30, 2016
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Nov 16, 2016
Dob violation - dismissed - Construction other optional
Emergency work. owner to proceed with immediate emergency stabilization as indicated in drawings prepared by titan engineers pc the emerg stabilization will include the removal of the top 6ft of the existing r/w. and the installation of a stone strong block wall remedy:owner will file all permits by 11/28/16 and obtain all permits
Nov 15, 2016
Dob violation - dismissed - Construction other optional
Ftm retaining wall in a safe condition. r/w under demolition are leaning forward and are in danger of collapse. there is an unprotective excavation at site.remedy: owner to immed retain a lic design professional to prepare a mitigation and stabilizatin plan plan t/be submitted to retaining wall unit no later than 09/19/16
Sep 2, 2016
Dob violation - dismissed - Failure to submit eer none
Failure to submit an energy efficiency report (eer) per ad. code sec. 28-308.4
Dec 31, 2013
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Jul 17, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jan 1, 2012
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2011
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 19, 2003
Dob violation - dismissed
ECB violations · 18
- Class - 2
1rcny 103-09(e). failure to file a retaining wall condition assessmentreport by the deadline as required by 1rcny 103-09(e)(2) and (5). to date, the department has not received a retaining wall condition assess
Feb 25, 2025 · Penalty $1,250
Active - Class - 1
Failure to comply w/the comm's order contained in nov #35197564p issued on 08/17/16 & to file a c of c pursuant to 28-201.1,28-204.4 & 1rcny102-01. for work w/o a permit at rear of premises(retainig wall)
Nov 5, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to file evidence of liability and or property damage insurancenoted: at the time of inspection (august 22,2016) as well as at the time of complaint(august 17,2016) the general liability policy (mpu767
Sep 2, 2016 · Penalty $2,400
Resolve - Class - 1
Illegally engaging in any business or occupation w/o the required license. noted: at the time of inspection (august 22,2016) as well as the time of the complaint (august 17, 2016),the general contractor license
Sep 2, 2016 · Penalty $2,500
Resolve - Class - 1
Failure to provide protection at sides of excavation. noted: at the time of inspection observed along exp#3 (rear of the building) unpro tected excavation. rmdy: provide protection at all sides of excavation
Sep 2, 2016 · Penalty $2,400
Resolve - Class - 1
Failure to notify the dept prior to commencement of earthwork.noted:attime of inspection observed along exp#3 excavation and earthwork operations.earthwork ops was limiting access to fire escapes at rear of bld
Sep 2, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to immediately notify dept of a dangerous or unsafe condition noted: at the time of inspection alogn exp#3 (rear of the building) weobserved that the retaining wall had become structurally compromised
Sep 2, 2016 · Penalty $1,200
Resolve - Class - 1
Failure to file retaining wall assessment report as specified in the administrative code ac 28-305.4.4.1 and rcny 103-09 (d)(5)(ii) noted: a review of our records indicates that you are in violation of the adm
Aug 24, 2016 · Penalty $800
Resolve - Class - 1
Failure to maintain retaining wall in a safe condition. noted:at the time of inspection along exp#3 (rear) of the bldg the existing retain ing wall has collapsed and is also partially demolished.retaining wall
Aug 24, 2016 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit. noted: at the time of inspection along exp#3 (rear)of the bldg, the existing retaining wall has been demolished/rehabilitated.in addition we observed extensive evidence of earthwork done.
Aug 24, 2016 · Penalty $1,600
Resolve
Show 8 more ↓
- Class - 1
Failure to safeguard persons and property affected by construction operations. noted: at the time of inspection at the site observed along exp#3 (rear of bldg) retaining walls under demolition/reconstruction
Aug 24, 2016 · Penalty $10,000
Resolve - Class - 1
Work w/o a permit. noted: at rear of premises exp#3 rear yard,rubble stone retaining wall approx 20ft high at time of inspection observed a compact excavator & a loader on site evidence of earth work being done
Aug 17, 2016 · Penalty $1,600
Resolve - Class - 1
Occupancy contrary to that allowed by building dept records illegal occupancy noted apt #5c illegally converted from class "a"apt into 2 srorooms. rmdy: discontinue illegal occupancy.
Apr 26, 2013 · Penalty $2,400
Resolve - Class - 1
Failure to comply w/the commissioner's order contained in notice of violation #34912585h issued on 10/4/11. sections of retaining wall,at rear,missing. remedy: comply w/the comm's order.
Dec 21, 2011
Resolve - Class - 2
Failure to comply w/the commissioner's order to file a c of c w/the dept of buildings for notice of violation #34912585h issued on 10/4/11 pursuant to 28-204.4 & 1rcny 102-01. remedy: file a c of c.
Dec 21, 2011 · Penalty $400
Resolve - Class - 1
Failure to maintain building in code-complaint manner. section of stone retaining wall at rear is missing & loose stone observed. retaining wall is approx 30ft high & 100ft long. remedy: maintain building: obta
Oct 4, 2011 · Penalty $1,000
Resolve - Class - 1
Work w/o a permit note appx 40' of block pipe 3" ran on the outside of the bldg along the wall no permits issued to this properly for the above work rem: obtain permit
Jul 30, 2010 · Penalty $1,600
Resolve - Non-hazardous
Plumbing work w/o plermit, in that piping has work on w/o permit remedy :obtain permit
Oct 27, 1994
Resolve
Complaints
- Plumbing
Water supply
Aug 30, 2026 · Apt 4B
Close - Heat/hot water
Entire building
Aug 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt 4B
Close - Plumbing
Water supply
May 19, 2026 · Apt 2D
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt 5C
Close - Plumbing
Water supply
May 19, 2026 · Apt 5C
Close
Show 40 more ↓
- Plumbing
Water supply
May 19, 2026 · Apt 5E
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 19, 2026 · Apt 5D
Close - Plumbing
Water supply
May 19, 2026 · Apt 4E
Close - Heat/hot water
Apartment only
May 19, 2026 · Apt 5C
Close - Plumbing
Water supply
May 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2026 · Apt BLDG
Close - Plumbing
Water supply
May 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 23, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 22, 2026 · Apt BA
Close - Heat/hot water
Apartment only
Feb 8, 2026 · Apt GRAGRO
Close - Heat/hot water
Entire building
Feb 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 6, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 3, 2026 · Apt GRA
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 1, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Jan 29, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Water leak
Heavy flow
Jan 16, 2026 · Apt 4C
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt 1D
Close - Unsanitary condition
Mold
Oct 30, 2025 · Apt 4C
Close - General
Cabinet
Oct 30, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Oct 30, 2025 · Apt 4C
Close - Paint/plaster
Wall
Oct 30, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Oct 30, 2025 · Apt 4C
Close - Paint/plaster
Wall
Oct 30, 2025 · Apt 4C
Close - Flooring/stairs
Floor
Oct 30, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Oct 30, 2025 · Apt 4C
Close - Unsanitary condition
Pests
Oct 30, 2025 · Apt 4C
Close - Paint/plaster
Ceiling
Oct 22, 2025 · Apt 4C
Close - Unsanitary condition
Mold
Oct 22, 2025 · Apt 4C
Close - Heat/hot water
Entire building
Jan 25, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1925
- Floors
- 5
- Residential units
- 57
- Building area
- 54,001 ft²
- Lot area
- 21,320 ft²
- Zoning
- R7-1
- Community board
- 208
- Council district
- 11
- Block / lot
- 3263 / 7
- Assessed value
- $1,040,850
- Landmark / historic district
- No
HPD registration #203315, last renewed Oct 15, 2025.
Questions about 3810 Bailey Avenue
Who owns 3810 Bailey Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 3810 LLC.
Does 3810 Bailey Avenue have violations?
Yes. NYC HPD has recorded 186 housing violations at this property.
Is 3810 Bailey Avenue rent stabilized?
NYC Department of Finance tax bills listed 56 rent-stabilized units here in 2024 (about 98% of its 57 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 3810 Bailey Avenue built?
City records list 1925 as the year it was built.
How many apartments are in 3810 Bailey Avenue?
It has 57 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.