135 West Kingsbridge Rd
Bronx, NY 10468BBL 2-03248-0143Map
Owner of record: West Kingsbridge LLC
135 West Kingsbridge Rd is a walk-up apartment building built in 1922 in Bronx, 10468. It has 58 residential units across 6 floors. The owner of record is West Kingsbridge LLC. HPD has recorded 486 housing violations here, most recently on June 14, 2026. 15 of the 50 most recent violations are still open. City tax records listed 58 rent-stabilized apartments here in 2024.
- HPD violations
- 486
- DOB violations
- 12
- ECB violations
- 24
- HPD complaints
- 1,194
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 486
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling, east wall, west wall, north wall and south wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... more than 30 sq.ft at ceiling, east wall, west wall, north wall and south wall in the bathroom located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Properly secure the loose 1st closet door frame from east at south ( detached from wall) in the foyer located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair and abate unsafe electric wiring condition consisting of exposed electrical wires at fuse panel at south wall in the foyer located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from east located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective saddle at entrance in the kitchen located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Replace with new the missing cover at fuse panel at south wall in the foyer located at apt 2a, 3rd story, 1st apartment from south at west , section ''145''
Jun 14, 2026 · Apt 2A
Open — Nov sent out - BHazardous
Abate the infestation consisting of bedbugs in the entire apartment located at apt 1f, 1st story, 1st apartment from west at north
Apr 22, 2026 · Apt 1F
Open — Nov sent out - ANon-hazardous
Properly repair with similar material the broken or defective wood floors in the 1st room from north located at apt 1f, 1st story, 1st apartment from west at north
Apr 22, 2026 · Apt 1F
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Mar 15, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 5th story, 1st apartment from east at south , section ''west''
Mar 15, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at court to vestibule at west section , 2nd story
Mar 6, 2026
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at vestibule door, at public hall, 2nd story, section ''135''
Mar 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch and assemblies at vestiuble door at public hall, 2nd story, section ''135''
Mar 4, 2026
Open — Violation will be reinspected - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots, and household items, at 1st fire escape from north at west exterior wall, at 6th story balcony at fire escape
Mar 4, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and its assemblies at public hall, 2nd story, section ''145''
Mar 4, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch and itd assemblies, at vestibule door at public hall, 2nd story, section ''145''
Mar 4, 2026
Open — Not complied with - BHazardous
Properly repair or replace the broken or defective building entrance door lock at public hall, 1st story
Feb 18, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set and assemblies at building entrance door ( from street to vestibule door) at public hall, 1st story
Feb 7, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set and assemblies at building entrance door ( from street to vestibule door) at public hall, 1st story
Feb 7, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective counter balance of the upper sash in the window at east, at the intermediate landing at public hall stairs, 3rd story
Jan 3, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective (inoperative) upper sash in the window at east, at intermediate landing at public hall stairs, 2nd story
Jan 3, 2026
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch set at building entrance door (street to vestibule) at public hall, 2nd story, section ''145''
Dec 15, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and its assembly at building entrance door (street to vestibule) at public hall, 2nd story, section ''145''
Dec 15, 2025
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 5k, 5th story, 1st apartment from west at north
Nov 23, 2025 · Apt 5K
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 5k, 5th story, 1st apartment from west at north
Nov 23, 2025 · Apt 5K
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 5k, 5th story, 1st apartment from west at north
Nov 23, 2025 · Apt 5K
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system locked at boiler room
Nov 23, 2025
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 19, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 5th story, 1st apartment from north at east
Nov 19, 2025 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 5e, 5th story, 1st apartment from north at east
Nov 19, 2025 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 5e, 6th story, 1st apartment from west at north , section ''135''
Nov 15, 2025 · Apt 5E
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system locked door at boiler room
Nov 15, 2025
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Nov 5, 2025
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the kitchen located at apt 5k, 6th story, 1st apartment from east at south
Nov 5, 2025 · Apt 5K
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 3j, 3rd story, 1st apartment from south at west
Nov 5, 2025 · Apt 3J
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door in the entrance located at apt 1l, 1st story, 2nd apartment from north at east , section ''east''
Nov 3, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 1l, 1st story, 2nd apartment from north at east , section ''east''
Nov 3, 2025 · Apt 1L
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate from front rail to return rail at 2nd fire escape from east, north exterior wall (building rear) at 4th story balcony
Jul 29, 2025
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing gusset plate from front rail to return rail at 2nd fire escape from east, north exterior wall (building rear) at 6th story balcony
Jul 29, 2025
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective missing brick and morter at south extior wall [rear of building]
May 24, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch set and its assembiles at building entrance door from court to vesibule at public hall, 1st story, section ''145'', at west
May 24, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective lock and latch set at building entrance door from court to vesibule at public hall, 1st story, section ''145'', at west
May 24, 2025
Open — Not complied with - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing from front rail to return rail the gusset plate at 3rd story balcony at rear yard at 2nd fire escape from east at south
May 24, 2025
Open — First no access to re- inspect violation - BHazardous
Properly repair or replace the broken or defective transom glass pane at court entrance door , section ''135''
May 24, 2025
Open — Not complied with - BHazardous
Fire escape defective. replace with new the broken, defective and/or missing from front rail to return rail the gusset plate at 5th story balcony at rear yard at 2nd fire escape from east at south
May 24, 2025
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective wood floor in the foyer located at apt 5d, 5th story, 1st apartment from west at north , section ''section145''
May 24, 2025 · Apt 5D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective chipping, peeling, flashing cement at south exterior wall, from 6th story, to paripit wall, [rear of building]
May 24, 2025
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from south at west wall in the bathroom located at apt 5d, 6th story, 1st apartment from west at north , section ''bdg145''
Jul 5, 2024 · Apt 5D
Closed — Violation closed
DOB building violations · 12
- Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2022)
Apr 22, 2023
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2021)
Aug 21, 2022
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Aug 2, 2022
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2019
Jun 29, 2020
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 17, 2019
Dob violation - dismissed - Construction other optional
Notice of order to stop work immediately due to permit holder withdraw al for job #220578863
Sep 6, 2018
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2017
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
Jun 3, 2013
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2012
Dob violation - dismissed
Show 2 more ↓
- Construction other optional
C-construction other optional
Sep 27, 2008
Vw*-violation - work w/o permit dismissed - Electric signs none
Es-electric signs none
Nov 25, 1992
Dob violation - dismissed
ECB violations · 24
- Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35581270x issued on 08/09/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to provide unobs
Sep 28, 2021
Resolve - Class - 2
Failure to comply with the commissioner's order contained in summons/violation#35562846x issued on 08/09/21 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01.failure to maintain buil
Sep 28, 2021
Resolve - Class - 1
Failure to provide unobstructed exit passageway total obstruction:at rear of premises erected wood deck at rear leaving inadequate passageway 30 in width as per building code from fire escape.remedy:remove obst
Aug 9, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to maintain building in code compliant manner:improper exit/exit access doorway arrangement per building code 1014.2;27-361 at rear of premises exit door has deadbolt lock with lock at time of inspectio
Aug 9, 2021 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35385481h issued on 7/23/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work w/o a permit. rem
Oct 30, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply w/ the commissioner's order contained in summons/violation#35385484n issued on 7/23/19 and to file a certificate of correction pursuant to 28-201.1 and 1rcny 102-01. for work w/o a permit. rem
Oct 30, 2019 · Penalty $1,250
Resolve - Class - 1
Failure to comply with the commissioner's order contained in summons/violation#35385484n issued on 7/23/19 and to file a certificate of cor rection pursuant to 28-201.1 and 1rcny 102-01.rem; comply with commiss
Sep 17, 2019 · Penalty $2,500
Resolve - Class - 3
Work without a permit. at the time of my inspection i noticed in apt 3c construction work framing and sheet rocking being done. work is approximately 75% completed. remedy: obtain permit/restore
Jul 23, 2019 · Penalty $500
Resolve - Class - 1
Work without a permit. 1)at the time of my inspection i noted electrical work done(new breaker panel installed) work is approximately 90% finished in apt 3c. also electrical work(new breaker panel and
Jul 23, 2019 · Penalty $800
Resolve - Class - 1
Work w/o a permit. at time of inspection i observed plumbing work (newcopper piping, pvc sewer lines) installed in apt 3c and in basement. work was 90% complete in bathroom, kitchen, walls were ot yet sheetroc
Jul 23, 2019 · Penalty $2,500
Resolve
Show 14 more ↓
- Class - 1
Electrical work without a permit.observed at 9:45am fixtures switches outlets hvac unit installed in reign boutique also fixtures installed outside building 135-145.no application on file for electrical work.re
Nov 7, 2018 · Penalty $1,600
Resolve - Class - 2
Unapproved unsafe unsuitable electrical equipment devices apparatus appliances materials or wiring in use.flexible cords used as permanent wiring in apartment 1c also indoor fixtures used outdoors under awning
Nov 7, 2018 · Penalty $400
Resolve - Class - 2
Failure to maintain building in code-compliant manner reinstallation/maintenance of plumbing materials/equipment per pc 102.3; 27-902. i observed in the cellar area of the boiler room on the sanitary discharge
Nov 7, 2018 · Penalty $3,125
Resolve - Class - 1
Failure to ground electrical systems.no service ground provided to service switches in basement.rem;provide grounding.
Nov 7, 2018 · Penalty $4,800
Resolve - Class - 2
Failed to provide effective electrical continuity for metal raceways enclosures cable armor.electrical raceway in hallway not continuous to electrical fixtures.rem:provide effective electrical continuity.
Nov 7, 2018 · Penalty $1,200
Resolve - Class - 2
Operation of a place of assembly without a current certificate of operation.at time of inspection restuarantz "caridad"open for business an d operating without a current certificate of operation as a p.a.rem:ob
Nov 13, 2017 · Penalty $4,000
Active - Class - 2
Altered/changed bldg occupied w/o a valid c of o as per 28-118.3.1;28-118.3.2. noted: alteration type 1 #200417343 was filed & permit was issued on 4-10-17 to legalize enlarged resturant,bldg is now occupied as
Jun 1, 2017 · Penalty $500
Active - Non-hazardous
Work without a permit. work noted. 1) opening created in cellar level east section leading to street. passageway leading to w. kingsbridge is obstructed with rolled down gate. remedy: file plans obtain permit a
Mar 1, 2002
Resolve - Non-hazardous
Failure to maintain: defect noted: accumulation of garbage and rubbish and debris throughout the entire rear yard. remedy: remove all debris.
Mar 1, 2002
Resolve - Non-hazardous
Work w/o a permit. work noted : bathroom, mezzanine constructed at rear of store. remedy : file plans, obtain permit and approvals from this dept.
Nov 13, 2001 · Penalty $500
Resolve - Hazardous
Occupancy contrary to that allowed by certificate of occupancy or bldg dept. records cellar converted from ordinary use into class a apart. at west.
Jul 27, 2001
Resolve - Non-hazardous
Failure to maintain the structural condition of the fls in apt 5h. bath & rear bdrm fls saf approx 1" & greater. note: plywood was addedto the bdrm fl & tile w/ mud to the bath fl to raise the existing fl.
Apr 16, 1998 · Penalty $2,500
Resolve - Hazardous
Failure to maintian defect is: sagging floor in apt 5h fifth floor aprox 4" adjacent to bathroom. remedy: obtain a letter from architect or licensed engeneer for structural stability and then necessary repairs.
Sep 19, 1997
Resolve - Non-hazardous
Failure to maintain the floor beams within apartment 5h. bathroom, west bedroom and east livingroom floor sags approximately 3-4 inches.
Sep 15, 1997 · Penalty $350
Resolve
Complaints
- Unsanitary condition
Mold
Jun 11, 2026 · Apt 2A
Close - Heat/hot water
Entire building
Apr 23, 2026 · Apt BLDG
Close - Water leak
Slow leak
Apr 3, 2026 · Apt 1A
Close - Unsanitary condition
Mold
Apr 3, 2026 · Apt 1A
Close - Unsanitary condition
Pests
Mar 25, 2026 · Apt 1F
Close - Paint/plaster
Wall
Mar 25, 2026 · Apt 1F
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 13, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 12, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 8, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 6, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 4, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 23, 2026 · Apt 5F
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 21, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 20, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 19, 2026 · Apt 5K
Close - Heat/hot water
Entire building
Feb 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 15, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 14, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 13, 2026 · Apt BLDG
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1922
- Floors
- 6
- Residential units
- 58
- Building area
- 79,000 ft²
- Lot area
- 15,875 ft²
- Zoning
- R6
- Community board
- 208
- Council district
- 14
- Block / lot
- 3248 / 143
- Assessed value
- $3,441,600
- Landmark / historic district
- No
HPD registration #209546, last renewed Oct 23, 2025.
Questions about 135 West Kingsbridge Rd
Who owns 135 West Kingsbridge Rd?
The owner of record in NYC Department of City Planning PLUTO data is West Kingsbridge LLC.
Does 135 West Kingsbridge Rd have violations?
Yes. NYC HPD has recorded 486 housing violations at this property.
Is 135 West Kingsbridge Rd rent stabilized?
NYC Department of Finance tax bills listed 58 rent-stabilized units here in 2024 (about 100% of its 58 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 135 West Kingsbridge Rd built?
City records list 1922 as the year it was built.
How many apartments are in 135 West Kingsbridge Rd?
It has 58 residential units and 67 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.