roofy

143 Father Zeiser Place

Bronx, NY 10468BBL 2-03219-0228Map

Owner of record: 188 Realty Associates

143 Father Zeiser Place is an elevator apartment building built in 1935 in Bronx, 10468. It has 49 residential units across 6 floors. The owner of record is 188 Realty Associates. HPD has recorded 290 housing violations here, most recently on March 25, 2026. 29 of the 50 most recent violations are still open. City tax records listed 49 rent-stabilized apartments here in 2024.

HPD violations
290
DOB violations
19
ECB violations
2
HPD complaints
308

What to know

Concern
2 open Class C

Immediately hazardous issues among recent violations are still open.

Good
Last violation Mar 25, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
49
About 100% of the building's 49 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 290

  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 25, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Replace with new the missing mechanical drain stoper at washbasin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 25, 2026 · Apt 2B

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 25, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly secure the loose washbasin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Mar 2, 2026 · Apt 2B

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Feb 16, 2026 · Apt 2B

    Open — Nov certified late
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective at time of inspection in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Feb 16, 2026 · Apt 2B

    Open — Nov certified late
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective at time of inspection in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south

    Feb 16, 2026 · Apt 2B

    Open — Nov certified late
  • B

    Properly secure the loose washbasin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Jan 22, 2026 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latch and assembly at door at compactor closet, 1st story

    Sep 25, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective arm closing device at building entrance door (from entrance to vestibule) , 1st story

    Sep 25, 2025

    Open — Not complied with
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective latch and assembly at door, at compactor closet, 2nd story

    Sep 25, 2025

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the heating riser pipe at south in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 25, 2025 · Apt 2B

    Open — Invalid certification
  • B

    Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 25, 2025 · Apt 2B

    Open — Invalid certification
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling, east & west walls in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 25, 2025 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation the heating riser pipe in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 25, 2025 · Apt 2B

    Open — Invalid certification
  • B

    Properly secure the loose washbasin cabinet in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south

    Sep 25, 2025 · Apt 2B

    Open — Invalid certification
  • C

    Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 1st story

    Sep 25, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 2nd story

    Sep 25, 2025

    Closed — Violation closed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Invalid certification
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Properly secure the loose wash basin at the east wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling, south wall, west wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 2nd room from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, east wall, west wall in the 2nd room from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 4th room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st closet from south at west wall door frame, 1st door frame from south at west wall in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective spring balances at lower sash of 1st window from the east wall at the south wall in the 4th room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Properly repair or replace the broken or defective string at ceiling light fixture in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Invalid certification
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective wood base sink cabinet floor in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic wall tiles at the east wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Remove all obstructions and repair all defects in the wasteline at the wash basin in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Invalid certification
  • A

    Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 2nd closet from north at east wall door in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Invalid certification
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north

    Sep 18, 2025 · Apt 2A

    Open — Nov sent out

DOB building violations · 19

  • Construction other optional

    Dob summons issued for structure rendered non compliant due to broken windows at exposure 4 from fire at 139 father zeiser place bronx ny

    May 16, 2023

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 14, 2020

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 12, 2018

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 19, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 30, 2015

    Dob violation - resolved
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2013 inspection report

    Mar 3, 2015

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 29, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 10, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 18, 2011

    Dob violation - resolved
Show 9 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 6, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 4, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 2, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 22, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 16, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    May 31, 1994

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 2

  • Class - 1

    Failure to provide unobstructed exit passageway.note:at the time of inspection observed,at expo#3 north elevation fire escape egress are blocking by flower vase at different floor/landing level of fire escape o

    Sep 18, 2024 · Penalty $1,250

    Resolve
  • Non-hazardous

    3m7 11q3 8v1 11x11 22l6 22o2 17m12 47b15 5j11 35o2 51b7 57o2 3m7=capacity plate 11x11=car top 17m12=car 5j11=too muxh gap to post. 51b7=oil

    Jul 10, 2000 · Penalty $180

    Resolve

Complaints

  • Unsanitary condition

    Pests

    Aug 26, 2026 · Apt 5B

    Open
  • Appliance

    Electric/gas range

    Aug 26, 2026 · Apt 5B

    Open
  • Heat/hot water

    Apartment only

    Mar 29, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Mar 24, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 2, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Mar 1, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 27, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 27, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 25, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 24, 2026 · Apt 2B

    Close
Show 40 more ↓
  • Heat/hot water

    Entire building

    Feb 22, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 17, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 15, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jan 26, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jan 22, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Jan 20, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 20, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 19, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 18, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 17, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 13, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2025 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Dec 1, 2025 · Apt 2B

    Close
  • Safety

    Smoke detector

    Dec 1, 2025 · Apt 2B

    Close
  • Appliance

    Refrigerator

    Dec 1, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Nov 6, 2025 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Sep 12, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Sep 12, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 12, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Sep 12, 2025 · Apt 2A

    Close
  • Door/window

    Window pane

    Sep 12, 2025 · Apt 2A

    Close
  • Paint/plaster

    Wall

    Sep 12, 2025 · Apt 2A

    Close
  • Flooring/stairs

    Floor

    Sep 12, 2025 · Apt 2A

    Close
  • Door/window

    Window frame

    Sep 12, 2025 · Apt 2A

    Close
  • Plumbing

    Basin/sink

    Sep 12, 2025 · Apt 2A

    Close
  • General

    Janitor/super

    Aug 19, 2025 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Aug 18, 2025 · Apt 2B

    Close
  • Paint/plaster

    Radiator

    Aug 18, 2025 · Apt 2B

    Close
  • Plumbing

    Water supply

    Jun 24, 2025 · Apt 6E

    Close
  • Heat/hot water

    Apartment only

    Mar 17, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 13, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 11, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 9, 2025 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Mar 7, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Mar 1, 2025 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 19, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 5, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Feb 2, 2025 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Jan 26, 2025 · Apt 2B

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1935
Floors
6
Residential units
49
Building area
49,248 ft²
Lot area
12,031 ft²
Zoning
R6
Community board
207
Council district
14
Block / lot
3219 / 228
Assessed value
$1,003,500
Landmark / historic district
No

HPD registration #200075, last renewed Aug 27, 2025.

Questions about 143 Father Zeiser Place

Who owns 143 Father Zeiser Place?

The owner of record in NYC Department of City Planning PLUTO data is 188 Realty Associates.

Does 143 Father Zeiser Place have violations?

Yes. NYC HPD has recorded 290 housing violations at this property.

Is 143 Father Zeiser Place rent stabilized?

NYC Department of Finance tax bills listed 49 rent-stabilized units here in 2024 (about 100% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 143 Father Zeiser Place built?

City records list 1935 as the year it was built.

How many apartments are in 143 Father Zeiser Place?

It has 49 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.