143 Father Zeiser Place
Bronx, NY 10468BBL 2-03219-0228Map
Owner of record: 188 Realty Associates
143 Father Zeiser Place is an elevator apartment building built in 1935 in Bronx, 10468. It has 49 residential units across 6 floors. The owner of record is 188 Realty Associates. HPD has recorded 290 housing violations here, most recently on March 25, 2026. 29 of the 50 most recent violations are still open. City tax records listed 49 rent-stabilized apartments here in 2024.
- HPD violations
- 290
- DOB violations
- 19
- ECB violations
- 2
- HPD complaints
- 308
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 290
- ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 2b, 2nd story, 1st apartment from east at south
Mar 25, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Replace with new the missing mechanical drain stoper at washbasin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Mar 25, 2026 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at east wall in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Mar 25, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Mar 2, 2026 · Apt 2B
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Feb 16, 2026 · Apt 2B
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective at time of inspection in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Feb 16, 2026 · Apt 2B
Open — Nov certified late - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective at time of inspection in the entire apartment located at apt 2b, 2nd story, 1st apartment from east at south
Feb 16, 2026 · Apt 2B
Open — Nov certified late - BHazardous
Properly secure the loose washbasin in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Jan 22, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch and assembly at door at compactor closet, 1st story
Sep 25, 2025
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective arm closing device at building entrance door (from entrance to vestibule) , 1st story
Sep 25, 2025
Open — Not complied with
Show 40 more ↓
- BHazardous
Properly repair or replace the broken or defective latch and assembly at door, at compactor closet, 2nd story
Sep 25, 2025
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the heating riser pipe at south in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Sep 25, 2025 · Apt 2B
Open — Invalid certification - BHazardous
Properly repair with similar material the broken or defective caulking around bathtub in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Sep 25, 2025 · Apt 2B
Open — Invalid certification - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling, east & west walls in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Sep 25, 2025 · Apt 2B
Closed — Violation dismissed - ANon-hazardous
Paint metal in accordance with dept. regulation the heating riser pipe in the kitchen located at apt 2b, 2nd story, 1st apartment from east at south
Sep 25, 2025 · Apt 2B
Open — Invalid certification - BHazardous
Properly secure the loose washbasin cabinet in the bathroom located at apt 2b, 2nd story, 1st apartment from east at south
Sep 25, 2025 · Apt 2B
Open — Invalid certification - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 1st story
Sep 25, 2025
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at compactor closet, 2nd story
Sep 25, 2025
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from south at west wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Invalid certification - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the east wall in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Properly secure the loose wash basin at the east wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the north wall, ceiling, south wall, west wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the 1st room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from west at north wall, 1st door frame from west at north wall in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall in the 1st private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard-paint that is xrf tested inconclusive for lead content at 0.5mg/cm2 and is presumed lead paint as set forth in (28 rcny §11-07(b)) and that is peeling or on a deteriorated subsurface-using work practices set forth in 28 rcny §11-06(b)(2) 1st door from east at south wall in the 2nd room from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, north wall, east wall, west wall in the 2nd room from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st radiator from east at south wall in the 4th room from north at west located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door frame, 1st closet from south at west wall door frame, 1st door frame from south at west wall in the foyer located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at lower sash of 1st window from the east wall at the south wall in the 4th room from north at east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective string at ceiling light fixture in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Invalid certification - CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood base sink cabinet floor in the kitchen located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic wall tiles at the east wall in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Remove all obstructions and repair all defects in the wasteline at the wash basin in the 2nd bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, east wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door from east at south wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Invalid certification - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st radiator from east at south wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the 1st bathroom from east located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st closet from north at east wall door, 2nd closet from north at east wall door in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Invalid certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd private hallway from north located at apt 2a, 2nd story, 2nd apartment from west at north
Sep 18, 2025 · Apt 2A
Open — Nov sent out
DOB building violations · 19
- Construction other optional
Dob summons issued for structure rendered non compliant due to broken windows at exposure 4 from fire at 139 father zeiser place bronx ny
May 16, 2023
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 14, 2020
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 12, 2018
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2017
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jan 19, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 30, 2015
Dob violation - resolved - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2013 inspection report
Mar 3, 2015
Dob violation - active - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 29, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 10, 2013
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 18, 2011
Dob violation - resolved
Show 9 more ↓
- Elevator elevatorrequired
E-elevator elevatorrequired
Nov 6, 2009
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jun 4, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Aug 2, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Nov 14, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 22, 2006
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
May 31, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 2
- Class - 1
Failure to provide unobstructed exit passageway.note:at the time of inspection observed,at expo#3 north elevation fire escape egress are blocking by flower vase at different floor/landing level of fire escape o
Sep 18, 2024 · Penalty $1,250
Resolve - Non-hazardous
3m7 11q3 8v1 11x11 22l6 22o2 17m12 47b15 5j11 35o2 51b7 57o2 3m7=capacity plate 11x11=car top 17m12=car 5j11=too muxh gap to post. 51b7=oil
Jul 10, 2000 · Penalty $180
Resolve
Complaints
- Unsanitary condition
Pests
Aug 26, 2026 · Apt 5B
Open - Appliance
Electric/gas range
Aug 26, 2026 · Apt 5B
Open - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 2, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Mar 1, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 27, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 27, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 25, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 24, 2026 · Apt 2B
Close
Show 40 more ↓
- Heat/hot water
Entire building
Feb 22, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 17, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 15, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Feb 12, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 22, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 20, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 19, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 17, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Jan 13, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Dec 5, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Dec 1, 2025 · Apt 2B
Close - Safety
Smoke detector
Dec 1, 2025 · Apt 2B
Close - Appliance
Refrigerator
Dec 1, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Nov 6, 2025 · Apt 2B
Close - Unsanitary condition
Pests
Sep 12, 2025 · Apt 2A
Close - Flooring/stairs
Floor
Sep 12, 2025 · Apt 2A
Close - Paint/plaster
Wall
Sep 12, 2025 · Apt 2A
Close - Unsanitary condition
Mold
Sep 12, 2025 · Apt 2A
Close - Door/window
Window pane
Sep 12, 2025 · Apt 2A
Close - Paint/plaster
Wall
Sep 12, 2025 · Apt 2A
Close - Flooring/stairs
Floor
Sep 12, 2025 · Apt 2A
Close - Door/window
Window frame
Sep 12, 2025 · Apt 2A
Close - Plumbing
Basin/sink
Sep 12, 2025 · Apt 2A
Close - General
Janitor/super
Aug 19, 2025 · Apt 2B
Close - Plumbing
Basin/sink
Aug 18, 2025 · Apt 2B
Close - Paint/plaster
Radiator
Aug 18, 2025 · Apt 2B
Close - Plumbing
Water supply
Jun 24, 2025 · Apt 6E
Close - Heat/hot water
Apartment only
Mar 17, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 13, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 11, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 9, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Mar 7, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 1, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Apartment only
Feb 5, 2025 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 2, 2025 · Apt 2B
Close - Heat/hot water
Entire building
Jan 26, 2025 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 1935
- Floors
- 6
- Residential units
- 49
- Building area
- 49,248 ft²
- Lot area
- 12,031 ft²
- Zoning
- R6
- Community board
- 207
- Council district
- 14
- Block / lot
- 3219 / 228
- Assessed value
- $1,003,500
- Landmark / historic district
- No
HPD registration #200075, last renewed Aug 27, 2025.
Questions about 143 Father Zeiser Place
Who owns 143 Father Zeiser Place?
The owner of record in NYC Department of City Planning PLUTO data is 188 Realty Associates.
Does 143 Father Zeiser Place have violations?
Yes. NYC HPD has recorded 290 housing violations at this property.
Is 143 Father Zeiser Place rent stabilized?
NYC Department of Finance tax bills listed 49 rent-stabilized units here in 2024 (about 100% of its 49 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 143 Father Zeiser Place built?
City records list 1935 as the year it was built.
How many apartments are in 143 Father Zeiser Place?
It has 49 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.