2487 Grand Avenue
Bronx, NY 10468BBL 2-03213-0085Map
Owner of record: Mgsa Vii LLC
2487 Grand Avenue is a walk-up apartment building built in 1920 in Bronx, 10468. It has 41 residential units across 5 floors. The owner of record is Mgsa Vii LLC. HPD has recorded 1,209 housing violations here, most recently on September 16, 2026. 50 of the 50 most recent violations are still open. City tax records listed 42 rent-stabilized apartments here in 2024.
- HPD violations
- 1,209
- DOB violations
- 25
- ECB violations
- 30
- HPD complaints
- 1,834
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,209
- BHazardous
Repair the roof so that it will not leak at ceiling in the private hallway located at apt 6e, 5th story, 2nd apartment from north at east
Sep 16, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6e, 5th story, 2nd apartment from north at east
Sep 16, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at ceiling in the 5th room from east located at apt 6e, 5th story, 2nd apartment from north at east
Sep 16, 2026 · Apt 6E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 6e, 5th story, 2nd apartment from north at east
Sep 16, 2026 · Apt 6E
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles at floor in the kitchen located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective counter balance at lower window sash of both windows in the 2nd room from east located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out
Show 40 more ↓
- ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling of south section at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at south section at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at vestibule door at public hall, 1st story
Sep 16, 2026
Open — Nov sent out - BHazardous
Properly repair the broken or defective paving concrete, building entrance at front yard, 1st story
Sep 16, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Notice of issuance sent to tenant - BHazardous
Provide a safe and adequate supply of electric service to the fixtures outlet at north wall in the bathroom located at apt 2d, 4th story, 1st apartment from south at west
Sep 16, 2026 · Apt 2D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story, section at south
Aug 26, 2026
Open — Nov sent out - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling inside closeat, 4sq feet in the foyer located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Notice of issuance sent to tenant - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 5th story, section at north
Aug 26, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story, section at north
Aug 26, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 2d, 2nd story, 1st apartment from east at south , section at north
Aug 26, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective grout at ceramic wall tiles around bathtub in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west , section at north
Aug 26, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west , section at north
Aug 26, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 2d, 2nd story, 1st apartment from south at west , section at north
Aug 26, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Provide a safe and adequate supply of electric service to the fixtures electric outlet at north wall in the bathroom located at apt 2d, 2nd story, 1st apartment from south at west , section at north
Aug 26, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter balance lower sash window, window at south wall in the 2nd room from east located at apt 2d, 2nd story, 1st apartment from south at west , section at north
Aug 26, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective roof covering material, roof
Aug 26, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair or replace the broken or defective covering material at roof
Aug 26, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling at public hall, 5th story, section at south
Aug 26, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling at public hall, 5th story, section at south
Aug 26, 2026
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 2nd room from east located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and all wall inside closet in the foyer located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling inside closet in the foyer located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the foyer located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the foyer located at apt 5e, 5th story, 1st apartment from north at east
Aug 26, 2026 · Apt 5E
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story, section at north
Aug 26, 2026
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and south wall in the 5th room from east located at apt 6e, 5th story, 2nd apartment from north at east
Aug 21, 2026 · Apt 6E
Open — Nov sent out - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak concealed leak at ceiling and south wall in the 5th room from east located at apt 6e, 5th story, 2nd apartment from north at east
Aug 21, 2026 · Apt 6E
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective refit door and frame at 1st public hall bulkhead from north
Aug 21, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling at public hall, 5th story
Aug 21, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at public hall, 5th story
Aug 21, 2026
Open — Nov sent out - CImmediately hazardous
Repair the roof so that it will not leak at ceiling at public hall, 5th story
Aug 21, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective mechanical door closing arm at entrance door to public hall at public hall, 1st story
Aug 11, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of washing machine with door intact. at public hall, 2nd story
Aug 11, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of refrigerator with door intact at south section at public hall, 1st story
Aug 11, 2026
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt d6, 4th story, 2nd apartment from north at east , section at south
May 15, 2026 · Apt D6
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 8d, 4th story, 2nd apartment from south at west , section at south
May 15, 2026 · Apt 8D
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at all walls in the bathroom located at apt 8d, 4th story, 2nd apartment from south at west , section at south
May 15, 2026 · Apt 8D
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balance at lower window sash at north wall in the bathroom located at apt 8d, 4th story, 2nd apartment from south at west , section at south
May 15, 2026 · Apt 8D
Open — Nov sent out
DOB building violations · 25
- Immediate emergency anythingoptional
Remedy: install approx 60 ft of sws along exp #1 from the right side of the bldg and wrap around exp# 2 (courtyard) by approx 30 ft to provide overhead protection to up the entrance of the bldg. the sws shall be installed tight back to the bldg and extend over the entrance bldg. exp# 1: approx. 60 ft of sws courtyard: approx 30 ft of sws
Sep 25, 2026
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Plumbing none
Based on lmp# 1343 being inactive, stop all plumbing work under job# 210025970
Jul 17, 2025
Dob violation - active - Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Construction other optional
Failure to maintain building in a code complaint manner - missing bricks at the 5th floor front exposure with vertical and horizontal cracks at various location on the parapet level - engineer's report requested along with sidewalk shed for the entire front exposure - approx 100 linear feet of overhead protection.
May 18, 2024
Dob violation - active - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 2, 2023
Dob violation - active - Construction other optional
C-construction other optional
Jun 3, 2019
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Feb 11, 2015
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed
Show 15 more ↓
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 15, 2010
Dob violation - dismissed - Low pressure boiler boiler required
Lblvio-low pressure boiler boiler required
Dec 31, 2009
Dob violation - dismissed - Construction other optional
C-construction other optional
Mar 12, 2008
Dob violation - dismissed - Immediate emergency anythingoptional
Amended
Feb 2, 2007
Dob violation - dismissed - Immediate emergency anythingoptional
Imegncy-immediate emergency anythingoptional
Jan 31, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Seu none
Cracks, displaced concrete & collapsed sections of 200 ft. (approx.) l ongrear retaining wall at rear yard of premises.remedy:repair/replace wall under pemrit & application
Jun 9, 2006
Dob violation - dismissed - Emergency none
Egncy-emergency none
Jul 30, 1998
Dob violation - dismissed - Unsafe buildings none
Ub-unsafe buildings none
Jul 30, 1998
V%*-dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Construction other optional
C-construction other optional
Aug 17, 1995
Vh*-violation hazardous dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 30
- Class - 1
Failure to maintain building in a code-compliant manner. at time of inspection, observed parapet in deteriorated condition at exposure #1, with missing bricks at the 5th-floor level and vertical/horizontal crac
Sep 24, 2026 · Penalty $6,250
Active - Class - 2
Failure to maintain building in code compliant manner due to at time of inspection observed broken/ uneven & cracks on steps in stairwel with broken light electrical fixture in overhead and debris stored in pub
Oct 9, 2025 · Penalty $1,250
Active - Class - 1
Failure to provide & maintain unobstructed egress, due to at time of inspection observed on platform stairs leading from 5th floor to roof is obstructed with furniture (sofa) preventing access to roof., remove
Oct 9, 2025 · Penalty $1,250
Active - Class - 2
Failure to maintain building in a code complain manner, due to at time of inspection observed at grand avenue, court yard and on west 190 st. various window a/c units missing required support brackets., repair
Oct 9, 2025 · Penalty $1,250
Active - Class - 1
Failure to comply and provide nyspe engineer's report as required as per complaint# 2392188 (05/18/2024), that was issued to same respodent by badge # 2617 and now past due as of 10/09/2025 at 8:30 am., comply
Oct 9, 2025
Resolve - Class - 1
Failure to maintain building in a code complaint manner - missing bricks at the 5th floor front exposure with vertical and horizontal cracks at various location on the parapet level - engineer's report requeste
May 18, 2024 · Penalty $6,250
Active - Class - 2
Failure to comply w/the comm's order to file c of c w/the dob's for notice of vio #35108393m issued on 11/19/14 pursuant to 28-204.4 & 1rcny102-01. remedy: file a c of c.
Jan 13, 2015
Resolve - Class - 1
Multiple dwelling occupied with one more dwelling unit than legally authorized y the c/o or official records. illegal conversion noted: atbasement level created 1 sro with poor lighting and ventilation with
Nov 19, 2014 · Penalty $1,200
Resolve - Class - 1
Work w/o a permit. on 11/7/14 at 10:30am during physical inspection i observed new waste,vent,hot/cold water lines installed in the basementfront left side of the bldg for a 3pc bathroom installed w/o a permit.
Nov 7, 2014 · Penalty $1,600
Resolve - Class - 3
Failure to maintain bldg in code complaint manner.defect noted in apt.1a flrs are sloping approx. 2"to1"& cracks on ceiling in different locations on bedroom areas.remedy:repair/or replace.
May 10, 2014 · Penalty $500
Resolve
Show 20 more ↓
- Class - 2
Failure to maintain building in code-complaint manner. defect noted: at north section of bldg,north-west apts on line"1",from 2nd story to 5th story,all fire stopping has been removed from walls,there are holes
Sep 29, 2011 · Penalty $500
Resolve - Class - 1
Failure to maintain iin a code compliant manner.retaining wall @ rear of bldg has been reduced in height approx 2ft causing soil to errode,also there are vertical cracks in several location.drop ladder on rear
Jun 3, 2010 · Penalty $5,000
Resolve - Class - 1
Failure to maintain egress clear & unobstructed.noted:fire corridor leading to street is obstructed by garbage rear gate leading to street obstructed by debris & is chained with padlock,fire escape drop ladder
Jun 3, 2010 · Penalty $1,600
Resolve - Class - 1
Failure to comply with an order of the commissioner.respondent failed to correct conditions cited in the prior nov#34646577z for missing approx 2 1/2ft of top of retaining wall causing errosion.rem:comply with
Jun 3, 2010 · Penalty $2,400
Resolve - Hazardous
Failure to maintain exterior bldg wall. noted: numerous improperly installed window mounted a/c units w/o exterior support brackets. remedy:provide manufactures or proper support brackets or remove a/c and
May 14, 2008 · Penalty $800
Resolve - Hazardous
Failure to maintain. noted: missing apprx two and half feet of parapetwall at the rear yard of the bldg. the length of the exposing soil to erosion. remedy: install parapet wall.
Apr 18, 2008 · Penalty $800
Resolve - Hazardous
Failure to maintain. noted: missing approx 2 & a half feet of retaining wall at the rear yard of the building(no) length of the lot exposingthe soil to erosion. remedy: maintain retaining wall.
Apr 18, 2008 · Penalty $800
Resolve - Hazardous
Failure to provide required of egress from every flr. noted: egress from rear yard w/ 4 fire escapes is no longer viable due to padlocking of 8ft (apprx) high iron gate. remedy: provide required egress
Jan 31, 2008 · Penalty $480
Resolve - Hazardous
Work w/o a permit. work noted: at apt #b1 new drywall is being installed over fl joist that was burned due to a fire. some fl joist were sistered with 2x6 fl joist inadequately. the entire apt have been 90%
Oct 11, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain adequate housekeeping. at the rear of premises rear yard there is a pile of construction debris due to a fire and 5 aptsbeing burned 90% damaged there is burned lumber fl joist plaster bags
Oct 11, 2007 · Penalty $500
Resolve - Non-hazardous
Work w/out a permit.work noted entire interior of apt c5 gutted out for renovation including plumbing & electrical work gut rehab throughoutthe entire bldg including, but not limited to apt e1,d1,b1,d7.
Oct 9, 2007 · Penalty $500
Resolve - Hazardous
Failure to maintain.defect noted:rear of premises concrete retaining wall approx. 5' high extending onto adjacent property of 2497 grand avenue is cracked & leaning out of plumb approx. 8".remedy:make all
Jun 14, 2007 · Penalty $800
Resolve - Hazardous
Failure to maintain hazardous defects are: in rear of premises retain ing wall constructed of poured concrete is approx 6'high and 150'long extending onto adjacent property of 2497 grand ave.
Jan 27, 2007 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior wall. approx 5'h x 15'l concretes retaining wall cracked & leaning out of plumb approx 8" to 10". location measyards- west elevation. remedy: make all necessary repairs immediately
Jan 10, 2007 · Penalty $800
Resolve - Non-hazardous
Failure to maintain exterior building wall defectd noted south and east parapet walls are leaning inward with open step crack on south facebottom of parapet wall also noted rear yard retaining wall has horizon
Dec 7, 2004 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior building wall defect noted south and eastbrick parapets are leaning ineard with open sted on south face bottom of parapet wall also noted rear yard concrete retaining wall also
Jul 30, 2004 · Penalty $2,000
Resolve - Hazardous
Failure to maintain.defects noted:south and west parapets are leaning inward with open step crack on south face,bottom of parapet wall at southeast corner.rear yard concrete retaining wall is cracking throughou
Mar 22, 2004 · Penalty $2,000
Resolve - Hazardous
Failure to maintain exterior. defect noted- (1) concrete retaining wall collapsing inward towards yard in rear. (2) south & west parapet wall are leaning inwards. (3) throut various windows white capping has be
Sep 16, 2003 · Penalty $2,500
Resolve - Non-hazardous
Failure to maintain exterior building wall defect is concrete retaining wall at rear approx 5'-" high x 50'-0" long is cracked, leaning and defective. remedy: make all necessary safe and lawfull reparis with ad
Jun 26, 1997 · Penalty $350
Resolve - Hazardous
Failure to maintain exterior noted the south east masonary corner of grand ave and west 188 st.missing broken and defective the masonary coping stove has been comprimised and prapet is of plumb on w 188 st sid
Sep 19, 1996
Resolve
Complaints
- Appliance
Refrigerator
Oct 15, 2026 · Apt D6
Open - Door/window
Door frame
Oct 14, 2026 · Apt 5E
Open - Unsanitary condition
Pests
Oct 14, 2026 · Apt 5E
Open - Unsanitary condition
Pests
Oct 14, 2026 · Apt 5E
Open - Plumbing
Toilet
Oct 14, 2026 · Apt 5E
Open - Plumbing
Bathtub/shower
Oct 14, 2026 · Apt 5E
Open - Unsanitary condition
Mold
Oct 14, 2026 · Apt 5E
Open - Water leak
Slow leak
Oct 14, 2026 · Apt 5E
Open - Water leak
Slow leak
Oct 14, 2026 · Apt 5E
Open - Water leak
Slow leak
Oct 14, 2026 · Apt 5E
Open
Show 40 more ↓
- Water leak
Slow leak
Oct 14, 2026 · Apt 5E
Open - Door/window
Window frame
Oct 13, 2026 · Apt 2D
Open - Door/window
Window frame
Oct 13, 2026 · Apt 2D
Open - Flooring/stairs
Floor
Oct 13, 2026 · Apt 2D
Open - Electric
Outlet/switch
Sep 3, 2026 · Apt 2D
Close - Door/window
Window frame
Sep 3, 2026 · Apt 2D
Close - Paint/plaster
Ceiling
Sep 3, 2026 · Apt 2D
Close - Flooring/stairs
Floor
Sep 3, 2026 · Apt 2D
Close - Unsanitary condition
Mold
Aug 21, 2026 · Apt 6E
Close - Water leak
Heavy flow
Aug 21, 2026 · Apt 6E
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt E5
Close - Paint/plaster
Ceiling
Aug 7, 2026 · Apt E5
Close - Unsanitary condition
Mold
Aug 7, 2026 · Apt APTE5
Close - Electric
Power outage
Aug 3, 2026 · Apt 2D
Close - Door/window
Window frame
Jun 26, 2026 · Apt 2D
Close - Appliance
Electric/gas range
Jun 26, 2026 · Apt 2D
Close - Unsanitary condition
Mold
Jun 26, 2026 · Apt 5E
Close - Electric
Outlet/switch
Jun 26, 2026 · Apt 2D
Close - Flooring/stairs
Floor
Jun 26, 2026 · Apt 2D
Close - Unsanitary condition
Mold
Jun 26, 2026 · Apt 5E
Close - Heat/hot water
Entire building
Jun 19, 2026 · Apt 2D
Close - Door/window
Window frame
Jun 12, 2026 · Apt 2D
Close - Electric
Outlet/switch
Jun 12, 2026 · Apt 2D
Close - Flooring/stairs
Floor
Jun 12, 2026 · Apt 2D
Close - Appliance
Electric/gas range
Jun 12, 2026 · Apt 2D
Close - Water leak
Heavy flow
May 25, 2026 · Apt 6E
Close - Outside building
Roofing
May 25, 2026 · Apt 6E
Close - Paint/plaster
Ceiling
May 25, 2026 · Apt 6E
Close - Water leak
Slow leak
May 25, 2026 · Apt 6E
Close - Paint/plaster
Wall
May 13, 2026 · Apt D6
Close - Safety
Smoke detector
May 13, 2026 · Apt D6
Close - Plumbing
Basin/sink
May 13, 2026 · Apt D6
Close - Unsanitary condition
Mold
May 13, 2026 · Apt D6
Close - General
Cabinet
May 13, 2026 · Apt D6
Close - Flooring/stairs
Floor
Apr 26, 2026 · Apt 8D
Close - Water leak
Heavy flow
Apr 26, 2026 · Apt 8D
Close - Unsanitary condition
Sewage
Apr 26, 2026 · Apt 8D
Close - Door/window
Door
Apr 23, 2026 · Apt 8E
Close - Plumbing
Toilet
Apr 23, 2026 · Apt 8E
Close - Paint/plaster
Ceiling
Apr 3, 2026 · Apt 5E
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1920
- Floors
- 5
- Residential units
- 41
- Building area
- 33,650 ft²
- Lot area
- 9,675 ft²
- Zoning
- R6
- Community board
- 207
- Council district
- 14
- Block / lot
- 3213 / 85
- Assessed value
- $1,345,500
- Landmark / historic district
- No
HPD registration #200661, last renewed Aug 29, 2025.
Questions about 2487 Grand Avenue
Who owns 2487 Grand Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Mgsa Vii LLC.
Does 2487 Grand Avenue have violations?
Yes. NYC HPD has recorded 1,209 housing violations at this property.
Is 2487 Grand Avenue rent stabilized?
NYC Department of Finance tax bills listed 42 rent-stabilized units here in 2024 (about 100% of its 41 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2487 Grand Avenue built?
City records list 1920 as the year it was built.
How many apartments are in 2487 Grand Avenue?
It has 41 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.