roofy

15 Evelyn Place

Bronx, NY 10468BBL 2-03198-0110Map

Owner of record: Mmikp Bronx Realty Ll

15 Evelyn Place is an elevator apartment building built in 1931 in Bronx, 10468. It has 30 residential units across 6 floors. The owner of record is Mmikp Bronx Realty Ll. HPD has recorded 230 housing violations here, most recently on August 5, 2026. 3 of the 50 most recent violations are still open. City tax records listed 29 rent-stabilized apartments here in 2024.

HPD violations
230
DOB violations
24
ECB violations
18
HPD complaints
739

What to know

Concern
3 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Aug 5, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
29
About 97% of the building's 30 apartments
Down from 30 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 230

  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 4c, 4th story, 2nd apartment from west at north

    Aug 5, 2026 · Apt 4C

    Open — First no access to re- inspect violation
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south

    Mar 16, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from east located at apt 2a, 2nd story, 2nd apartment from east at south

    Mar 16, 2026 · Apt 2A

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective air valve radiator in the 4th room from north located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
  • A

    Paint metal in accordance with dept. regulation radiator in the 4th room from north located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective wood floor in the 4th room from north located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the kitchen located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from north located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling and all walls in the entire apartment located at apt 6d, 6th story, 1st apartment from north at east

    Mar 16, 2026 · Apt 6D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective counter balance at upper window sash in the 1st room from north at east located at apt 4c, 4th story, 2nd apartment from west at north

    Mar 16, 2026 · Apt 4C

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective vinyl floor tiles in the foyer located at apt 4c, 4th story, 2nd apartment from west at north

    Mar 16, 2026 · Apt 4C

    Closed — Violation closed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 1st room from north located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • B

    Replace the broken or defective water supply valve at east wall in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • A

    Properly repair with similar material the broken or defective porcelain enamel finish by method of reglazing at bathtub in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 2nd apartment from east at south

    Mar 16, 2026 · Apt 2A

    Closed — Violation closed
  • A

    Properly repair with similar material the broken or defective wood window stool in the 2nd room from east at south located at apt 2a, 2nd story, 2nd apartment from east at south

    Mar 16, 2026 · Apt 2A

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective the ceiling light fixture in the 1st room from north at west located at apt 4c, 4th story, 2nd apartment from west at north

    Mar 16, 2026 · Apt 4C

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4c, 4th story, 2nd apartment from west at north

    Mar 16, 2026 · Apt 4C

    Closed — Violation closed
  • A

    Paint metal in accordance with dept. regulation metal riser in the bathroom located at apt 2a, 2nd story, 2nd apartment from east at south

    Mar 16, 2026 · Apt 2A

    Closed — Violation dismissed
  • A

    Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at ceiling (apprx.5 sq.ft.) in the bathroom located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the ceilng and all walls in the entire apartment located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4c, 4th story, 2nd apartment from west at north

    Mar 16, 2026 · Apt 4C

    Closed — Violation closed
  • A

    Properly repair or replace the broken or defective the ceiling light fixture in the foyer located at apt 2d, 2nd story, 1st apartment from north at east

    Mar 16, 2026 · Apt 2D

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 4a, 4th story, 2nd apartment from east at south

    Mar 16, 2026 · Apt 4A

    Closed — Violation closed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at south yard yard

    Aug 6, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective radiator shut-off knob in the kitchen located at apt 2b, 2nd story, 1st apartment from west at north

    Dec 6, 2024 · Apt 2B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Dec 6, 2024 · Apt 2B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2b, 2nd story, 1st apartment from west at north

    Dec 6, 2024 · Apt 2B

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department all walls in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2024 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2024 · Apt 2B

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2b, 2nd story, 1st apartment from south at west

    Aug 18, 2024 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light fixture at ceiling in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east

    Jul 5, 2024 · Apt 2B

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective light switch at west wall in the private hallway located at apt 2b, 2nd story, 1st apartment from north at east

    Jul 5, 2024 · Apt 2B

    Closed — Violation dismissed
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color south wall, east wall, and the ceiling in the 1st room from north located at apt 6d, 6th story, 1st apartment from north at east

    Mar 29, 2024 · Apt 6D

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding the maximum allowable temperature of 130 degrees at all hot water fixtures in the entire apartment located at apt 2a, 2nd story, 2nd apartment from east at south

    Feb 8, 2024 · Apt 2A

    Closed — Violation closed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2a, 2nd story, 2nd apartment from south at west

    Dec 19, 2022 · Apt 2A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system cellar door lock east yard

    Dec 19, 2022

    Closed — Violation dismissed
  • C

    Provide an adequate supply of gas to the fixtures to range in the kitchen located at apt 5e, 5th story, 1st apartment from east at south

    Jul 24, 2022 · Apt 5E

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room at boiler room

    May 9, 2022

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the kitchen located at apt 2a, 2nd story, 2nd apartment from east at south

    May 9, 2022 · Apt 2A

    Closed — Violation dismissed
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and all walls in the 2nd room from north at east located at apt 2a, 2nd story, 2nd apartment from east at south

    May 9, 2022 · Apt 2A

    Closed — Violation dismissed
  • A

    Properly repair the broken or defective vinyl floor cover in the 2nd room from north at east located at apt 2a, 2nd story, 2nd apartment from east at south

    May 9, 2022 · Apt 2A

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees in the entire apartment located at apt 6a, 6th story, 2nd apartment from east at south

    Mar 2, 2022 · Apt 6A

    Open — Violation will be reinspected
  • C

    Replace or repair the self-closing doors that is missing or defective ... in the entrance located at apt 6a, 6th story, 2nd apartment from east at south

    Mar 2, 2022 · Apt 6A

    Closed — Violation dismissed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Mar 2, 2022

    Open — First no access to re- inspect violation
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6a, 6th story, 2nd apartment from east at south

    Mar 2, 2022 · Apt 6A

    Closed — Violation dismissed

DOB building violations · 24

  • Immediate emergency anythingoptional

    Install apprx 80 linear ft total of sidewalk shed for overhead protec tion @ expo#1 approximate 70 linear ft @ subject property additional 5 ft extending for adjacent property @ expo#2 additional 5 ft extending for adjacent property @ exposure 4 80 ft total

    Oct 23, 2025

    Dob violation - dismissed
  • Construction other optional

    At time of inspection observed facade is in disrepair with missing masonry joints, vertical/horizontal extended cracks up to parapet walls and in the center with loose window metal trim. this condition can be a fall hazard if not repair.

    Oct 20, 2025

    Dob violation - active
  • Construction other optional

    Failure to provide required annual parapet observations report for 2024 at building 15 evelyn place as required by 28-301.1.1.

    Oct 20, 2025

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2021

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 6, 2020

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 8, 2019

    Dob violation - resolved
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - dismissed
  • Fail to certify class 1 none

    Failure to certify correction on immediately hazardous (class 1) ecb violation

    Mar 7, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 8, 2018

    Dob violation - resolved
Show 14 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 10, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 29, 2016

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 27, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 25, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 3, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 13, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 17, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 4, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 17, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 10, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 8, 2004

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed

ECB violations · 18

  • Class - 1

    Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection, i observed exp #1 south (1)cracked brick/mortar joints along 6th floor lintel line. (2)cracked brick at window spandrels.

    Mar 25, 2026 · Penalty $5,000

    Active
  • Class - 1

    Responding on a 311 elevator complaint, upon inspection, cease use violation was issued, for safety issued, car door restrictor not working, lobby hoist way, damaged, remedy; repair then contact nycdob for rest

    Dec 9, 2025 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain bldg exterior facade and appurtenances.note:at time of inspection i observed exp#1 south cracked spalling brick/mortar joints from top fl window intel line and parapet.vertical cracked brick

    Oct 21, 2025

    Resolve
  • Class - 1

    Observed facade exterior in disrepair with missing masonry joints, vertical/ horizontal extended cracks up to parapet walls and in the center with loose window metal trim. this condition can be a fall hazard be

    Oct 20, 2025 · Penalty $5,000

    Active
  • Class - 2

    Observed at time of inspection ftm various a/c units installed at windows with missing anchored support brackets at front of building., repair and/or replace; /install brackets or remove a/c units.

    Oct 20, 2025 · Penalty $1,250

    Active
  • Class - 2

    31b10,64m07,67b10,71x10,10010,56y10. 31b10-rmdy repair leveling on device; 64m07-rmdy provide and insall; 67b10-rmdy repair in car phone 71x10-repair pit light; 100t10-rmdy repair in car phone; 100t10-rmdy

    Feb 1, 2019 · Penalty $312

    Active
  • Class - 1

    An unlawful act. failure to comply with an order of the commissioner. failure to correct and certify summons #35274454m, issued on 12/12/17 for defective wires. rem: comply with ec code/obtain permit.

    May 23, 2018 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to comply w/ the commissioner's order. failure to correct & certify# summons# 35274454k issued on 12/12/2017, for defective wiring in apt 4a. rem: comply w/ ec code/ obtain permit.

    Mar 2, 2018 · Penalty $800

    Resolve
  • Class - 1

    Unapproved,unsafe,usuitable electrical equipment,apparatus,materials,devices,appliances or wiring in use.apt#4a:defective wiring are in use defective ceiling for defective receptacle outlet are in use,two defec

    Dec 12, 2017 · Penalty $1,600

    Resolve
  • Class - 2

    Electrical work without a permit.the entire building hallways:replacing lighting fixtures,and repair in apt 4a."not on file"this is not a final inspection!! rem:obtain permit.

    Dec 12, 2017 · Penalty $400

    Resolve
Show 8 more ↓
  • Class - 1

    Failure to ground electrical systems basment service ground conductor no water main ground provided."please note"the ground conductor is notattach to the water pipe,defective and cutting!!rem:provide grounding!

    Dec 12, 2017 · Penalty $4,800

    Resolve
  • Class - 2

    05m10,1=71x10. 05-provide car door restrictor; 71-rebulb fixture.

    Nov 21, 2014 · Penalty $250

    Resolve
  • Non-hazardous

    5#, 9b, 15f, 57z, 950 car door is too loose needs adj. (9) insufficentdoor gibb (rusted) (15) lobby hoistway door lost motion, adjust(57) water in pit.

    Dec 1, 1999

    Resolve
  • Non-hazardous

    50y14,57z2,47h15,29m7,47y2. 29-roovide spin out cable on cwt side.

    Jan 16, 1999 · Penalty $350

    Resolve
  • Non-hazardous

    14i,75u,37q,50y,52y,22d,17q,05a,28h,32q,57z, 37q3-selector chain 05a12 car vision panel must

    Apr 29, 1998 · Penalty $180

    Resolve
  • Non-hazardous

    14m,03m,22d,35p, 03. provide capacity plate in cab.

    Jan 26, 1993 · Penalty $5,000

    Resolve
  • Non-hazardous

    14m,03m,22d,35p,(03)provide capcity plate in cab. (35)no supt.

    Oct 11, 1991 · Penalty $1,000

    Resolve
  • Non-hazardous

    73o,28h,14m,3m,22d,17q,35p,3 capacity plate 17 car

    Feb 7, 1991 · Penalty $1,000

    Resolve

Complaints

  • Unsanitary condition

    Mold

    Sep 18, 2026 · Apt 6C

    Close
  • General

    Bell/buzzer/intercom

    Apr 8, 2026 · Apt 1C

    Open
  • Heat/hot water

    Apartment only

    Apr 8, 2026 · Apt 1C

    Close
  • Heat/hot water

    Entire building

    Mar 6, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt 3E

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2026 · Apt 6A

    Close
  • Heat/hot water

    Apartment only

    Dec 14, 2025 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 3, 2025 · Apt BLDG

    Close
Show 40 more ↓
  • Unsanitary condition

    Garbage/recycling storage

    Jul 7, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Jun 24, 2025 · Apt 5A

    Close
  • Plumbing

    Water supply

    Jun 24, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Jan 21, 2025 · Apt 6A

    Close
  • Heat/hot water

    Apartment only

    Dec 22, 2024 · Apt 6A

    Close
  • Heat/hot water

    Apartment only

    Dec 13, 2024 · Apt 6A

    Close
  • Heat/hot water

    Apartment only

    Dec 7, 2024 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 5, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 2, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 29, 2024 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 29, 2024 · Apt BLDG

    Close
  • Unsanitary condition

    Pests

    Oct 24, 2024 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Oct 24, 2024 · Apt 2B

    Close
  • Plumbing

    Toilet

    Oct 22, 2024 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Oct 18, 2024 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Oct 18, 2024 · Apt 2B

    Close
  • General

    Janitor/super

    Aug 8, 2024 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Aug 8, 2024 · Apt 2B

    Close
  • Unsanitary condition

    Sewage

    Jun 5, 2024 · Apt 2B

    Close
  • Plumbing

    Basin/sink

    Jun 4, 2024 · Apt 2B

    Close
  • Electric

    No lighting

    Jun 4, 2024 · Apt 2B

    Close
  • Appliance

    Electric/gas range

    Jun 4, 2024 · Apt 2B

    Close
  • Plumbing

    Bathtub/shower

    Jun 4, 2024 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    Feb 6, 2024 · Apt 2A

    Close
  • Water leak

    Heavy flow

    Dec 27, 2023 · Apt 4C

    Close
  • Heat/hot water

    Entire building

    Dec 7, 2023 · Apt 2A

    Close
  • Heat/hot water

    Apartment only

    Dec 6, 2023 · Apt 6E

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Nov 24, 2023 · Apt BLDG

    Close
  • General

    Cabinet

    Aug 3, 2023 · Apt 4A

    Close
  • Flooring/stairs

    Floor

    Aug 3, 2023 · Apt 4A

    Close
  • Plumbing

    Bathtub/shower

    Aug 3, 2023 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Aug 3, 2023 · Apt 4A

    Close
  • Paint/plaster

    Wall

    Aug 3, 2023 · Apt 4A

    Close
  • Paint/plaster

    Ceiling

    Aug 3, 2023 · Apt 4A

    Close
  • Heat/hot water

    Entire building

    Feb 4, 2023 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2022 · Apt 6A

    Close
  • Heat/hot water

    Entire building

    Dec 30, 2022 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1931
Floors
6
Residential units
30
Building area
29,892 ft²
Lot area
6,900 ft²
Zoning
R7-1
Community board
207
Council district
14
Block / lot
3198 / 110
Assessed value
$692,550
Landmark / historic district
No

HPD registration #207648, last renewed Aug 5, 2025.

Questions about 15 Evelyn Place

Who owns 15 Evelyn Place?

The owner of record in NYC Department of City Planning PLUTO data is Mmikp Bronx Realty Ll.

Does 15 Evelyn Place have violations?

Yes. NYC HPD has recorded 230 housing violations at this property.

Is 15 Evelyn Place rent stabilized?

NYC Department of Finance tax bills listed 29 rent-stabilized units here in 2024 (about 97% of its 30 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 15 Evelyn Place built?

City records list 1931 as the year it was built.

How many apartments are in 15 Evelyn Place?

It has 30 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.