roofy

2323 Walton Avenue

Bronx, NY 10468BBL 2-03187-0047Map

Owner of record: 2323 Walton Ave Hsngdev

2323 Walton Avenue is an elevator apartment building built in 1928 in Bronx, 10468. It has 66 residential units across 6 floors. The owner of record is 2323 Walton Ave Hsngdev. HPD has recorded 377 housing violations here, most recently on September 10, 2026. 22 of the 50 most recent violations are still open. City tax records listed 66 rent-stabilized apartments here in 2024.

HPD violations
377
DOB violations
44
ECB violations
16
HPD complaints
465

What to know

Concern
9 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 10, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
66
About 100% of the building's 66 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 377

  • A

    Paint metal in accordance with dept. regulation door in the entrance located at apt 3g, 3rd story, 3rd apartment from west at north

    Sep 10, 2026 · Apt 3G

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective silicone around bathtub in the bathroom located at apt 3g, 3rd story, 3rd apartment from west at north

    Sep 10, 2026 · Apt 3G

    Open — Nov sent out
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules signage missing at public hall, 1st story

    Aug 21, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Aug 21, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door dividing north and south section at public hall, 3rd story

    Aug 21, 2026

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at west wall at public hall, 6th story

    Aug 21, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective locks and assembly at building entrance door , 1st story

    Jul 7, 2026

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    May 11, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 2nd apartment from north at east

    May 11, 2026 · Apt 2B

    Closed — Violation closed
  • C

    Properly repair or replace the broken or defective lower window sash causing guillontine effect in the bathroom located at apt 5g, 5th story, 1st apartment from west at north , section ''north''

    May 6, 2026 · Apt 5G

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly repair or replace the broken or defective latch set and assembly to hopper door at public hall, 2nd story

    May 6, 2026

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latch to hopper door at public hall, 2nd story

    May 6, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges to door at vestibule at public hall, 1st story

    May 6, 2026

    Closed — Violation closed
  • B

    Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 2i, 2nd story, 1st apartment from south at west , section ''center''

    Feb 4, 2026 · Apt 2I

    Closed — Violation dismissed
  • B

    Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules missing in the entire apartment located at apt 2i, 2nd story, 1st apartment from south at west , section ''center''

    Feb 4, 2026 · Apt 2I

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 2nd story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading from north section to center section at public hall, 3rd story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at fire door leading from south section to center section at public hall, 3rd story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Remove the illegal fastening key operated lock panic bar installed at door (from roof to public hall) at 2nd public hall bulkhead from north, 6th story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at hopper door at public hall, 6th story

    Jan 23, 2026

    Closed — Violation closed
  • B

    Provide re entry from roof to public hall at 1st public hall bulkhead from north, 6th story

    Jan 23, 2026

    Closed — Violation closed
  • B

    Remove the illegal fastening keyoperated lock at door knob assemble at 1st public hall bulkhead from north, 6th story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door (from roof to public hall staircase) at 1st public hall bulkhead from north, 6th story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Remove device preventing door from being self-closing consisting of ceramic tiles at floor impeding door from closing at public hall, 6th story

    Jan 23, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective [hinge] hopper door at west wall at public hall, 1st story, section ''south''

    Dec 30, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective [hinge] door to roof at bulkhead at public hall, 6th story, section ''south''

    Dec 30, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective [hinge] 2nd door from south at public hall, 6th story, section ''south''

    Dec 30, 2025

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of hot water exceeding 130 degrees at all hot water fixtures in the entire apartment located at apt 2b, 2nd story, 1st apartment from north at east , section at south

    Dec 7, 2025 · Apt 2B

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 2b, 2nd story, 1st apartment from north at east , section at south

    Dec 7, 2025 · Apt 2B

    Closed — Violation closed
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    Oct 29, 2025

    Closed — Violation closed
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    Oct 29, 2025

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... lesss than 10 sqft at ceiling in the 1st bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south original violation 18288967 issued 10-oct-25 has been upgraded to class b per administrative code 27-2017.3a(3)(a) or (b).

    Oct 10, 2025 · Apt 2A

    Open — Defect letter issued
  • A

    Paint with light colored paint to the satisfaction of this department at north wall, east wall, south wall, west wall, ceiling, and entrance door frame in the 2nd bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... lesss than 10 sqft at ceiling in the 1st bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Closed — Violation closed
  • C

    Trace and repair the source and abate the visible mold condition... more than 30 sqft at north wall, east wall, south wall, west wall, ceiling, and entrance door frame in the 2nd bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Notice of issuance sent to tenant
  • B

    Repair the flushing apparatus and maintain same so as to flush effectively the water closet , in the 1st bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Nov certified late
  • B

    M/d law abate the nuisance consisting of lockable slide bolt installed at door in the entrance located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Nov certified late
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color ateast wall, south wall, and at ceiling in the 1st bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Nov certified late
  • B

    Properly repair the source and abate the evidence of a water leak ateast wall, south wall, and at ceiling in the 1st bathroom from north located at apt 2a, 2nd story, 3rd apartment from north at east , section at south

    Oct 10, 2025 · Apt 2A

    Open — Nov certified late
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 2nd apartment from north at east

    Sep 1, 2025 · Apt 3D

    Open — Notice of issuance sent to tenant
  • A

    Reset, so as to secure a proper and tight connection, the water closet bowl ... in the bathroom located at apt 3d, 3rd story, 2nd apartment from north at east

    Sep 1, 2025 · Apt 3D

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 1st story

    Aug 8, 2025

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the 2nd room from north at east located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Open — Nov sent out
  • A

    Properly repair with similar material the broken or defective ceramic tiles at south wall in the bathroom located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Open — Nov sent out
  • C

    Replace or repair the self-closing doors that is missing or defective due to unaligned door in the entrance located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Closed — Violation closed
  • C

    M/d law abate the nuisance consisting of household items and furniture blocking egress through fire escape window in the 1st room from north at west located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective inner glass pane at lower sash, 3rd window from east at south wall in the 2nd room from north at east located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Open — Nov sent out
  • C

    Properly repair or replace the broken or defective inner glass pane at upper sash, 1st from east at south wall in the 2nd room from north at east located at apt 6h, 6th story, 3rd apartment from south at west

    Aug 5, 2025 · Apt 6H

    Open — Nov sent out

DOB building violations · 44

  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2024 external low pressure inspection

    Nov 14, 2025

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2023 external low pressure inspection

    Sep 23, 2024

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2021 external low pressure inspection

    Jun 30, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Low pressure boiler boiler required

    Violation issued-failure to file 2022 external low pressure inspection

    Apr 25, 2023

    Dob violation - active
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2020)

    Jun 20, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2019)

    Jun 19, 2021

    Dob violation - dismissed
Show 34 more ↓
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 - multiple years (2018)

    Jun 18, 2021

    Dob violation - dismissed
  • Failure to submit eer none

    Failure to submit an eer per ad. code sec. 28-308.4 in 2017

    Jun 17, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 2, 2017

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 18, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 14, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7b technical report by 08/21/2012

    Aug 30, 2013

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 2, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 15, 2012

    Dob violation - resolved
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Jan 1, 2012

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Violation issued for failure to file annual boiler 2010 inspection report

    Dec 13, 2011

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2011

    Dob violation - resolved
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Low pressure boiler boiler required

    Lblvio-low pressure boiler boiler required

    Dec 31, 2009

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 25, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 30, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 16, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 26, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 29, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 18, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    2p655

    Aug 1, 2002

    Dob violation - resolved
  • Elevator elevatorrequired

    2p655

    Jul 12, 2001

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Sep 16, 1997

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 17, 1993

    Dob violation - dismissed
  • Elevator elevatorrequired

    (51) restore elevator to service so a proper inspection may be made by an inspector from this dept

    Sep 23, 1988

    Dob violation - resolved

ECB violations · 16

  • Class - 2

    Class 2 items: : elevator car ventilation openings or forced-ventilation equipment are obstructed, damaged, or inoperative, and required ventilation is not maintained.: asme a17.1-2013 2.14.2.3, in-car communic

    Aug 26, 2026 · Penalty $625

    Active
  • Class - 2

    Failure to submit acceptable 7th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4. agg2 history of noncompliance on 36023462k (agg1),36019890p.

    Aug 11, 2016 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to file an acceptable technical report in compliance w/code provisions: periodic inspection pf exterior walls & appurtenances as required by article 28.302 & the dob's rules & regulations. remedy: file

    Oct 28, 2015 · Penalty $2,000

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    Oct 3, 2014 · Penalty $800

    Resolve
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliancew/article 28-302 of the bldg code and dob's rules & regulations. 36018279x. respondent has demonstrated a history of non-compliance w/dept

    Jun 11, 2012 · Penalty $10,000

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dept of bldgs rules

    Jan 15, 2012 · Penalty $8,000

    Resolve
  • Class - 2

    03m11,10h11,17h11,37m07,37i10,40r09,41t07,67x10.(03m11)replace hand rail in cab.(17h11)replace worn hoistway door gibbs where necessary.(37m07)provide ladder for overhead sheave room.(37i10)repair damaged overh

    Apr 20, 2011

    Resolve
  • Class - 2

    Fail to file an acceptable 6th round technical report in compliance w/code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regualtions.36014132n

    Apr 15, 2011 · Penalty $8,000

    Resolve
  • Class - 2

    10h11,03m11,17h11,37x10,37q03,67x10. 03m11-replace missing handrail. 17h11-replace worn hoistway door gibbs where necessary. 37x10-repair light in the overhead sheave room. 37q03-install guard for light in the

    Jul 28, 2010

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance with code provisions: periodic inspection of exterior walls and appurtenances as required by article 28.302 and the department of buildin

    Jul 20, 2010 · Penalty $4,000

    Resolve
Show 6 more ↓
  • Class - 2

    Failure to file an acceptable 6th round technical report in compliance w/ code provisions:periodic inspection of exterior walls & appurtenances as required by article 28.302 & the dob rules & regulations.file t

    Jul 12, 2010 · Penalty $8,000

    Resolve
  • Class - 2

    Failure to file an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 and the dob rules & regulations

    Nov 27, 2009 · Penalty $4,000

    Resolve
  • Class - 2

    Failure to submit an acceptable sixth round technical report in compliance w/code provisions:periodic inspection of exterior walls and appurtenances as required by article 28.302 & the dob rules & regulations

    Jan 30, 2009 · Penalty $4,000

    Resolve
  • Non-hazardous

    12x11-57o2-33p17-30o2-35b9 30=clean car top & pit 35=remove partition for motor rm

    Oct 22, 2001 · Penalty $350

    Resolve
  • Non-hazardous

    73u16,3o2,75u16. 73-city id # tags. 3-car top.

    Nov 19, 1999 · Penalty $180

    Resolve
  • Non-hazardous

    3,10,14m,57o. car door slams open need adjustment, no number six button light out on car panel, no certificate frame, pit dirty.

    Feb 2, 1999

    Resolve

Complaints

  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 13, 2026 · Apt BLDG

    Close
  • Flooring/stairs

    Floor

    Aug 17, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Aug 17, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 17, 2026 · Apt 2B

    Close
  • Flooring/stairs

    Stairs

    Aug 17, 2026 · Apt 2B

    Close
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 2C

    Open
  • Unsanitary condition

    Pests

    Aug 7, 2026 · Apt 2C

    Open
  • Unsanitary condition

    Sewage

    Aug 7, 2026 · Apt 2C

    Open
  • General

    Bell/buzzer/intercom

    Aug 6, 2026 · Apt 5G

    Close
Show 40 more ↓
  • Heat/hot water

    Apartment only

    Jul 4, 2026 · Apt 2B

    Close
  • Electric

    No lighting

    Jul 2, 2026 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Jul 2, 2026 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    May 29, 2026 · Apt APT5G

    Close
  • Heat/hot water

    Entire building

    May 12, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    May 9, 2026 · Apt 2B

    Close
  • Heat/hot water

    Entire building

    May 4, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Apr 25, 2026 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Apr 20, 2026 · Apt 2B

    Close
  • General

    Bell/buzzer/intercom

    Mar 5, 2026 · Apt 5G

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 2, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2I

    Close
  • Heat/hot water

    Apartment only

    Feb 1, 2026 · Apt 2I

    Close
  • Door/window

    Door

    Jan 27, 2026 · Apt 3I

    Close
  • Heat/hot water

    Entire building

    Jan 21, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 5, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 3, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 28, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 4F

    Close
  • Heat/hot water

    Apartment only

    Dec 26, 2025 · Apt 5G

    Close
  • Heat/hot water

    Apartment only

    Dec 25, 2025 · Apt 2B

    Close
  • Heat/hot water

    Apartment only

    Dec 5, 2025 · Apt 2B

    Close
  • Plumbing

    Toilet

    Oct 9, 2025 · Apt 2A

    Close
  • Paint/plaster

    Ceiling

    Oct 9, 2025 · Apt 2A

    Close
  • Unsanitary condition

    Mold

    Oct 9, 2025 · Apt 2A

    Close
  • General

    Janitor/super

    Sep 29, 2025 · Apt 4F

    Close
  • Appliance

    Electric/gas range

    Aug 18, 2025 · Apt 3D

    Close
  • Appliance

    Electric/gas range

    Aug 18, 2025 · Apt 3D

    Close
  • Flooring/stairs

    Floor

    Aug 18, 2025 · Apt 3D

    Close
  • General

    Cabinet

    Aug 18, 2025 · Apt 3D

    Close
  • Unsanitary condition

    Pests

    Aug 18, 2025 · Apt 3D

    Close
  • Plumbing

    Toilet

    Aug 18, 2025 · Apt 3D

    Close
  • Water leak

    Slow leak

    Aug 1, 2025 · Apt 1F

    Close
  • Flooring/stairs

    Floor

    Jul 29, 2025 · Apt 6H

    Close
  • Safety

    Window guard broken/missing

    Jul 29, 2025 · Apt 6H

    Close
  • Door/window

    Window pane

    Jul 29, 2025 · Apt 6H

    Close
  • Unsanitary condition

    Mold

    Jul 29, 2025 · Apt 6H

    Close
  • Unsanitary condition

    Pests

    Jul 29, 2025 · Apt 6H

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1928
Floors
6
Residential units
66
Building area
73,204 ft²
Lot area
14,250 ft²
Zoning
R8
Community board
205
Council district
14
Block / lot
3187 / 47
Assessed value
$986,850
Landmark / historic district
No

HPD registration #211129, last renewed Aug 31, 2025.

Questions about 2323 Walton Avenue

Who owns 2323 Walton Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 2323 Walton Ave Hsngdev.

Does 2323 Walton Avenue have violations?

Yes. NYC HPD has recorded 377 housing violations at this property.

Is 2323 Walton Avenue rent stabilized?

NYC Department of Finance tax bills listed 66 rent-stabilized units here in 2024 (about 100% of its 66 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2323 Walton Avenue built?

City records list 1928 as the year it was built.

How many apartments are in 2323 Walton Avenue?

It has 66 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.