111 East 182 Street
Bronx, NY 10453BBL 2-03171-0044Map
Owner of record: 111 East 182 Corp
111 East 182 Street is a walk-up apartment building built in 1926 in Bronx, 10453. It has 22 residential units across 5 floors. The owner of record is 111 East 182 Corp. HPD has recorded 220 housing violations here, most recently on September 23, 2026. 39 of the 50 most recent violations are still open. City tax records listed 21 rent-stabilized apartments here in 2024.
- HPD violations
- 220
- DOB violations
- 3
- ECB violations
- 5
- HPD complaints
- 264
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 220
- CImmediately hazardous
Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate presumed lead paint that is xrf tested inconclusive at 0.5 mg/cm2 (28 rcny §11-07(b)) from required window and/or door friction surfaces and make floors smooth and cleanable, in an apartment with a child under six located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) ceiling, north wall, south wall, east wall, west wall in the bathroom located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door frame from south at west wall, west wall, ceiling in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the 1st door frame from south at west wall in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from south at west wall door frame in the private hallway located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st window frame from north at east wall in the 2nd room from north at west located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the 3rd room from north at west located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, west wall in the foyer located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall, 1st window frame from north at east wall in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from south at west wall in the bathroom located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling, west wall in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation the 1st riser from south at west wall in the bathroom located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the north wall, 1st closet from south at west wall door in the private hallway located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Sep 23, 2026
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 3, wg to replace = 1, wg to repair = 0 in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Notice of issuance sent to tenant - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall, west wall, south wall in the 2nd room from north at west located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall, south wall, west wall in the 3rd room from north at west located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at north wall in the foyer located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint metal in accordance with dept. regulation at 1st riser from south at west wall in the bathroom located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st door from south at west wall, 1st window frame from west at north wall in the bathroom located at apt e1, 5th story, 1st apartment from east at south
Sep 23, 2026 · Apt E1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak over ceiling at intermediate landing at public hall stairs, 5th story
Aug 20, 2026
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of plexiglass installed at vestibule door (from vestibule to public hall) , 2nd story
Aug 20, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Aug 20, 2026
Open — Nov sent out - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 2nd story
Aug 20, 2026
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of household garbage at public hall, 3rd story
Aug 20, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling, north wall, east wall and south wall at public hall stairs, 5th story
Aug 20, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling, north wall, east wall and south wall at public hall stairs, 5th story
Aug 20, 2026
Open — Nov sent out - BHazardous
Provide approved glass at vestibule door (from vestibule to public hall) , 2nd story
Aug 20, 2026
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and west wall at public hall, 6th story
Aug 20, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling and west wall at public hall, 6th story
Aug 20, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak over ceiling at public hall, 6th story
Aug 20, 2026
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt ge, 1st story, 2nd apartment from west at north
Mar 23, 2026 · Apt GE
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling and all walls in the entire apartment located at bsmt-apt b
Mar 16, 2026 · Apt B
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling in the 1st room from north located at bsmt-apt b, 1st bsmt-apt from north at east
Mar 16, 2026 · Apt B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 24, 2026
Closed — Violation closed - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Jan 24, 2026 · Apt E1
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Jan 24, 2026 · Apt E1
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at fire door at bulkhead , 5th story
Jan 24, 2026
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of gas range at public hall, 4th story
Jan 24, 2026
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective latch set and assembly at fire door at bulkhead , 5th story
Jan 24, 2026
Closed — Violation dismissed - BHazardous
Properly secure the loose electrical light fixture on the ceiling at public hall, 3rd story
Jan 18, 2026
Open — Nov sent out - BHazardous
Repair the roof so that it will not leak at the ceiling in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Jan 18, 2026 · Apt E1
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the kitchen located at apt e1, 5th story, 1st apartment from east at south
Jan 18, 2026 · Apt E1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Jan 18, 2026 · Apt E1
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt e1, 5th story, 1st apartment from east at south
Jan 18, 2026 · Apt E1
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt e1, 5th story, 1st apartment from east at south
Dec 25, 2025 · Apt E1
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Dec 25, 2025
Closed — Violation closed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 5
- Class - 1
Observed second bedroom ceiling & wall instate of disrepair conditions with section missing, cracks, loose and potential falling condition in apt # e1 on 5th floor. this unsafe bedroom has fire escape emergency
Sep 28, 2022 · Penalty $1,250
Resolve - Hazardous
Required means of egress obstructed noted front sidewalk shed has no opening in shed roof for front east and west side firescape drop ladders shed roof corrugated metal with no opening remedy provide opening
Nov 21, 2003
Resolve - Hazardous
Sidewalk shed not adequately maintained noted all three lights missing bulbs at front sidewalk shed remedy maintain shed install bulbs
Nov 21, 2003 · Penalty $1,000
Resolve - Hazardous
Failure to maintain exterior walls. defect noted: bricks cracking horozontally thruout parapit walls bricks buldging thruout &cracked in danger of collapsing. location: entire front facade. remedy: provide over
Jun 2, 2003 · Penalty $800
Resolve - Hazardous
Failure to maintain exterior. defect bricks cracking seperating thruout-fire escapes possibly unstable-cracking all around structural steel of fire escapes 3rd& 4th & 5th floors east & west side. remedy: make a
Jun 2, 2003 · Penalty $800
Resolve
Complaints
- Water leak
Slow leak
Sep 5, 2026 · Apt E1
Close - Unsanitary condition
Mold
Sep 5, 2026 · Apt E1
Close - Water leak
Damp spot
Jul 28, 2026 · Apt E2
Close - Heat/hot water
Apartment only
Feb 20, 2026 · Apt 4D
Close - Heat/hot water
Apartment only
Jan 27, 2026 · Apt GE
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 22, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 23, 2025 · Apt E2
Close - Heat/hot water
Apartment only
Dec 2, 2025 · Apt D2
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 27, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 26, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Dec 23, 2024 · Apt E7
Close - Heat/hot water
Entire building
Dec 23, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 8, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 2, 2024 · Apt C1
Close - Plumbing
Bathtub/shower
Nov 19, 2024 · Apt C1
Close - Flooring/stairs
Floor
Sep 27, 2024 · Apt E2
Close - Plumbing
Basin/sink
Sep 27, 2024 · Apt E2
Close - Plumbing
Bathtub/shower
Sep 27, 2024 · Apt E2
Close - Flooring/stairs
Floor
Sep 16, 2024 · Apt E2
Close - Plumbing
Bathtub/shower
Sep 16, 2024 · Apt E2
Close - Unsanitary condition
Pests
Jul 11, 2024 · Apt BSMT
Close - Appliance
Refrigerator
Jul 11, 2024 · Apt BSMT
Close - Appliance
Electric/gas range
Jul 11, 2024 · Apt BSMT
Close - Paint/plaster
Wall
Jul 11, 2024 · Apt BSMT
Close - Flooring/stairs
Floor
Jul 11, 2024 · Apt BSMT
Close - Paint/plaster
Ceiling
Jul 11, 2024 · Apt BSMT
Close - Flooring/stairs
Floor
Jul 11, 2024 · Apt BSMT
Close - Paint/plaster
Ceiling
Jul 11, 2024 · Apt BSMT
Close - Door/window
Window frame
Jul 11, 2024 · Apt BSMT
Close - Unsanitary condition
Mold
Jul 11, 2024 · Apt BSMT
Close - Paint/plaster
Wall
Jul 11, 2024 · Apt BSMT
Close - Appliance
Refrigerator
Jul 11, 2024 · Apt BSMT
Close - Unsanitary condition
Pests
Jul 11, 2024 · Apt BSMT
Close - Unsanitary condition
Mold
Jul 11, 2024 · Apt BSMT
Close - Door/window
Window frame
Jul 11, 2024 · Apt BSMT
Close - Water leak
Heavy flow
Jul 11, 2024 · Apt BSMT
Close - Door/window
Door frame
Apr 1, 2024 · Apt C1
Close - Heat/hot water
Entire building
Feb 1, 2023 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 19, 2022 · Apt B3
Close - Paint/plaster
Ceiling
Sep 27, 2022 · Apt E1
Close - Paint/plaster
Wall
Sep 27, 2022 · Apt E1
Close - Paint/plaster
Ceiling
Sep 27, 2022 · Apt E1
Close - Unsanitary condition
Mold
Sep 27, 2022 · Apt E1
Close - Door/window
Window frame
Sep 27, 2022 · Apt E1
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1926
- Floors
- 5
- Residential units
- 22
- Building area
- 18,685 ft²
- Lot area
- 5,141 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 14
- Block / lot
- 3171 / 44
- Assessed value
- $450,450
- Landmark / historic district
- No
HPD registration #207795, last renewed Sep 17, 2025.
Questions about 111 East 182 Street
Who owns 111 East 182 Street?
The owner of record in NYC Department of City Planning PLUTO data is 111 East 182 Corp.
Does 111 East 182 Street have violations?
Yes. NYC HPD has recorded 220 housing violations at this property.
Is 111 East 182 Street rent stabilized?
NYC Department of Finance tax bills listed 21 rent-stabilized units here in 2024 (about 95% of its 22 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 111 East 182 Street built?
City records list 1926 as the year it was built.
How many apartments are in 111 East 182 Street?
It has 22 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.