roofy

2191 Creston Avenue

Bronx, NY 10453BBL 2-03170-0040Map

Owner of record: 25 Realty Associates, LLC

2191 Creston Avenue is an elevator apartment building built in 1939 in Bronx, 10453. It has 55 residential units across 6 floors. The owner of record is 25 Realty Associates, LLC. HPD has recorded 310 housing violations here, most recently on October 8, 2026. 31 of the 50 most recent violations are still open. City tax records listed 54 rent-stabilized apartments here in 2024.

HPD violations
310
DOB violations
31
ECB violations
21
HPD complaints
199

What to know

Concern
4 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Oct 8, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
54
About 98% of the building's 55 apartments

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 310

  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from west at north wall in the kitchen located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the private hallway , the 1st room from north at west, the foyer located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from east at south wall, 1st window frame from west at north wall in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective broken glass at lower sash at window at west wall at public hall, 2nd story

    Oct 8, 2026

    Open — Nov sent out
  • B

    Properly repair or replace the broken or defective saddle at entrance in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective ceramic tiles at east wall in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Notice of issuance sent to tenant
  • B

    Properly repair or replace the broken or defective electrical outlet at west wall in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • B

    Properly secure the loose washbasin at west wall in the kitchen located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at south wall, west wall, 1st door frame from east at south wall in the kitchen located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
Show 40 more ↓
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Nov sent out
  • A

    Trace and repair the source and abate the visible mold condition... less than 10sq ft at ceiling and east wall in the bathroom located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Notice of issuance sent to tenant
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 2j, 2nd story, 1st apartment from west at north

    Oct 8, 2026 · Apt 2J

    Open — Notice of issuance sent to tenant
  • B

    Repair the broken or defective plastered surfaces and paint in a uniform color at north wall and ceiling in the 1st room from north located at apt 5a, 5th story, 3rd apartment from south at west

    Sep 2, 2026 · Apt 5A

    Open — Nov certified on time
  • A

    Repair the broken or defective plastered surfaces and paint in a uniform color at south wall in the foyer located at apt 5a, 5th story, 3rd apartment from south at west

    Sep 2, 2026 · Apt 5A

    Open — Nov sent out
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the 1st room from north located at apt 3g, 3rd story, 1st apartment from south at west

    Aug 26, 2026 · Apt 3G

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, west wall in the 2nd room from north located at apt 3g, 3rd story, 1st apartment from south at west

    Aug 26, 2026 · Apt 3G

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, west wall in the 2nd room from north located at apt 3g, 3rd story, 1st apartment from south at west

    Aug 26, 2026 · Apt 3G

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling in the 1st room from north located at apt 3g, 3rd story, 1st apartment from south at west

    Aug 26, 2026 · Apt 3G

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper chute door at compactor closet at public hall, 4th story

    Aug 26, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hopper chute door at compactor closet at public hall, 3rd story

    Aug 26, 2026

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling at public hall, 6th story, section at south

    Aug 26, 2026

    Open — Nov certified on time
  • A

    Trace and repair the source and abate the visible mold condition... at ceiling less then 10 sq ft at public hall, 6th story, section at south

    Aug 26, 2026

    Open — Nov certified on time
  • B

    Repair the roof so that it will not leak over ceiling at public hall, 6th story, section at south

    Aug 26, 2026

    Open — Nov certified on time
  • A

    Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from north at east wall door in the foyer located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the 1st window frame from east at south wall in the 4th room from north located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the bathroom located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st closet from north at east wall door frame in the foyer located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling in the bathroom located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • A

    Paint with light colored paint to the satisfaction of this department the baseboard at west wall in the foyer located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • A

    Properly repair with similar material the broken or defective vynil tiles at floor in the private hallway located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Properly repair or replace the broken or defective gasket at freezer door and refrigerator door in the kitchen located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • B

    Properly repair with similar material the broken or defective porcelain enamel finish glaze at bathtub in the bathroom located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Open — Civ14 mailed
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Aug 3, 2026

    Open — Nov certified on time
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) baseboard at south wall, 1st door from west at north wall, 1st door frame from west at north wall in the 4th room from north located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from north at east wall in the bathroom located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st closet from east at south wall door, 1st closet from east at south wall door frame in the private hallway located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st door frame from north at east wall in the kitchen located at apt 4d, 4th story, 2nd apartment from east at south

    Aug 3, 2026 · Apt 4D

    Closed — Violation closed
  • B

    Properly secure the loose handrail at north wall at public hall stairs at north , 2nd story

    May 13, 2026

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective latch at vestibule , 1st story

    Dec 28, 2025

    Closed — Violation closed
  • B

    Remove all encumbrances consisting of flower pots at 3rd story balcont at 1st fire escape from south at east exterior wall at fire escape

    Aug 13, 2025

    Closed — Violation closed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at door at compactor closet, 4th story

    Aug 4, 2025

    Closed — Violation closed
  • B

    Properly repair or replace the broken or defective latchset at door at compactor closet, 4th story

    Aug 4, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective latchset at door at compactor closet, 1st story

    Aug 4, 2025

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective latchset at door at compactor closet, 1st story

    Aug 4, 2025

    Closed — Violation dismissed
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Mar 31, 2025

    Closed — Violation closed
  • C

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the at north yard

    Mar 31, 2025

    Closed — Violation dismissed

DOB building violations · 31

  • Construction other optional

    Failure to maintain building in code compliant manner. observed the following defected conditions: crack masonry and open joint at building entrance front. spalling bricks at exposure 4 parapet area remedy: repair and/or replace

    Jul 1, 2026

    Dob violation - active
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Dec 1, 2024

    Dob violation - active
  • Hazardous condition (facade) facade required

    Cycle 9b unsafe report filed

    Feb 21, 2023

    Dob violation - active
  • Construction other optional

    Emergency work order to secure and repair unsafe facade note:provide safety measures@t exposure#1 east elev.(creston ave)due to severly cracked-spalled brickwork observed in multiple floors(the most severe- unsafe conditon located between 1st/22nd floor remedy:remove &secure all loose materials,secure the area and provide safety measures on esp

    Nov 4, 2022

    Dob violation - active
  • Immediate emergency anythingoptional

    Erect sidewalk shed at entire exposure#1 and set back(creston avenue) approximately 150 linear feet to protect the public and the property

    Nov 3, 2022

    Dob violation - dismissed
  • Construction other optional

    Failure to maintain building in code compliant manner. at time of inspection observed at exposure #1 facade in complete disrepair severe bulging & cracks at all levels. steels lintels with severe corrosion along with deflection at all levels. masonry brick work has a potential of dislodging & falling onto public sidewalk & exit/entry to

    Nov 2, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Dec 10, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 27, 2017

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 8, 2016

    Dob violation - resolved
Show 21 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 15, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 13, 2014

    Dob violation - resolved
  • Elevator affirmation of correction elevatorrequired

    Vio issued to elevator - fail to correct defects on 2012 cat 1 insp/tst

    May 30, 2014

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 2, 2013

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 13, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 14, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 20, 2009

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 3, 2008

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Aug 6, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 9, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 28, 2006

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jan 6, 2006

    Dob violation - active
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 29, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 14, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    2p1952

    Apr 23, 2003

    Dob violation - resolved
  • Elevator elevatorrequired

    2p1952

    Jul 11, 2001

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 7, 2000

    Dob violation - active
  • Elevator elevatorrequired

    2p1952

    Dec 13, 1999

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 16, 1999

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Feb 10, 1997

    Dob violation - active
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Aug 29, 1995

    Dob violation - active

ECB violations · 21

  • Class - 1

    Failure to provide unobstructed exit passageway. note: at the time of inspection observed items stored at fire escape landing at exposure 1 4th floor. remedy: remove egress obstruction.

    Jul 1, 2026 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances. note: at the time of inspection observed broken/cracked glass panels of elevator room at the maon roof. remedy: maintain exterior building facade

    Jan 2, 2025

    Resolve
  • Class - 2

    Failure to maintain exterior building facade and appurtenances. note: observed at exposure 2, south elevation, spalling bricks at parapet level. at exposure 3 west elevation, observed a cracked window glass and

    Oct 25, 2024 · Penalty $625

    Resolve
  • Class - 2

    Failure to file acceptable amended cycle 9b report indicating correction of unsafe conditions described in initial facades report required by 28.302.5 for control #919152. remedy: file acceptable report.

    Jan 16, 2024

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order in dob violation vio22-04080 / 110222cer05d, dated 11/2/2022. respondent was required to submit an engineer's report concerning structurally deficient conditions.

    Oct 11, 2023 · Penalty $2,500

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances.note:at time of inspection observed exp #1 east elevation brickwork separating from 2nd & 3rd fl level(south facing) & step cracked at multiple locations.ex

    Jan 20, 2023 · Penalty $1,250

    Resolve
  • Class - 1

    Failure to maintain building exterior walls or appurtenances.note:at time of inspection observed unsafe brickwork separating from face btw 1st & 2nd floor at exp #1 east elevation (creston ave) observed step cr

    Nov 4, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to maintain building in code compliant manner. at time of inspection observed fire escape landings at multiple levels used to store household items. exposure #2 egress pathway obstructed by combustible

    Nov 2, 2022 · Penalty $625

    Resolve
  • Class - 1

    Failure to maintain building wall(s) and appurtenances. at time of inspection observed at exposure #1 facade in complete disrepair severe bulging & cracks at all levels. steels lintels with severe corrosion alo

    Nov 2, 2022 · Penalty $2,500

    Resolve
  • Class - 1

    Failure to comply with the commissioner's order in dob violation vio22-04080/110222cer05d,dated 11/2/2022.respondent was required to submit an engineer's report concerning structurally deficient conditions.as o

    Nov 1, 2022

    Resolve
Show 11 more ↓
  • Class - 1

    Cu-08v01, cu-05l10. 02l10,16d06,39o02,40o02,70o02,41m07,60i10,61t11, 56q03,56y10,68m07,68m07. 08-floor stops excessively off level 4"; 05-car door beaming out of saddle must repair; 02-alarm defective repair

    Jul 30, 2015

    Resolve
  • Class - 2

    32h10.14i11.15m07.08v10.53h11.16l10.40i10.40p16.32h10 top & bottom car shoes worn repair 14i11 car mirror damaged replace 15m07 car certif. frame missing provide new oner 08v10 adjust fl stops where needed 53h

    Sep 15, 2008 · Penalty $500

    Resolve
  • Non-hazardous

    5i11/20i11/58v1/66o2/85bb6/.5i11-replace damaged car door vision glass.20i11-replace damaged hoistway doors vision glass where necessary.58v1-adjust brake in order for car to stop level.66o2-clean pit.85bb5-fil

    Sep 10, 2007

    Resolve
  • Non-hazardous

    05i11,20i11,58v01,66o02,85bb05.05i11-replace damaged car door vision glass.20i11-replace damaged hoistway doors vision glass where necessary.58v01-adjust brakes in order for car car to stop level.66o02-clean pi

    Aug 6, 2007 · Penalty $350

    Resolve
  • Non-hazardous

    Failure to provide elevator landing.sign that shall read:in case of fire use stairs,unless otherwise instructed-at the elevator bank on fl 2to 6.remedy:install sign as per local law 16 1984.

    Apr 9, 2007

    Resolve
  • Non-hazardous

    8v1,27h11,20i11,12l10,10h11,5k11,84h11,16b1,39p7,19q3,33y2,33o2,32o2,66o2,12d6. 20-4th flr. 12-exp wires for car light . 5-cab door. 84-car door saddle. 16-6th flr. 19-base 12-light under car

    Aug 28, 2003

    Resolve
  • Non-hazardous

    73o02/08v01/09h12/10d06/05l11/57p17//05- closes,jumping on track

    Feb 22, 2002

    Resolve
  • Non-hazardous

    5d6/5#1/8v1/11q3/24h12/57o2. 5- loose car door adjust. 5- gap on car door when closed. 8-new level with landing 1- unguarded car light 24- worn car door danger and roller. 5- per sirty.

    Feb 11, 2002

    Resolve
  • Non-hazardous

    17i12,5j1,30o02,25q3,31m7,35l12,73u16,57o2,31m7,58o2,59o2.3-exposed wire under provide cover.73-provide city i.d.tags on device.31-exoed wires top of car provide cover.35-replace borken window in mottor rm.

    Nov 1, 2000

    Resolve
  • Non-hazardous

    17m2,8v1,11m7,24h11,9m7,57o2. 17-no glass. 8-not leveled. 11-no light fixture. 24-car door rollers worn. 9-missing gibbs. 57-pit dirty.

    Jan 19, 1999 · Penalty $180

    Resolve
  • Non-hazardous

    Failure to maintain plumbing and /or appurtenances, in that con ed discovered a gas leak in the piping to apt. 6c & shut of hte heater & it has not been fixed yet. if was shut march 4, 1998. remedy: maintain

    Apr 7, 1998

    Resolve

Complaints

  • Appliance

    Electric/gas range

    Sep 21, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2026 · Apt 2J

    Close
  • Electric

    Outlet/switch

    Sep 21, 2026 · Apt 2J

    Close
  • Plumbing

    Basin/sink

    Sep 21, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Pests

    Sep 21, 2026 · Apt 2J

    Close
  • Unsanitary condition

    Mold

    Sep 21, 2026 · Apt 2J

    Close
  • Appliance

    Refrigerator

    Sep 21, 2026 · Apt 2J

    Close
  • Appliance

    Refrigerator

    Aug 31, 2026 · Apt 5A

    Close
  • Appliance

    Electric/gas range

    Aug 31, 2026 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Aug 31, 2026 · Apt 5A

    Close
Show 40 more ↓
  • Plumbing

    Bathtub/shower

    Aug 31, 2026 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Aug 31, 2026 · Apt 5A

    Close
  • Water leak

    Slow leak

    Aug 12, 2026 · Apt APT2J

    Close
  • Electric

    No lighting

    Aug 12, 2026 · Apt APT2J

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt APT2J

    Close
  • Unsanitary condition

    Pests

    Aug 12, 2026 · Apt APT2J

    Close
  • Paint/plaster

    Ceiling

    Aug 12, 2026 · Apt APT2J

    Close
  • Flooring/stairs

    Floor

    Jul 24, 2026 · Apt 4D

    Close
  • Paint/plaster

    Door/frame

    Jul 24, 2026 · Apt 4D

    Close
  • Appliance

    Refrigerator

    Jul 24, 2026 · Apt 4D

    Close
  • Appliance

    Electric/gas range

    Jul 24, 2026 · Apt 4D

    Close
  • Paint/plaster

    Wall

    Jul 24, 2026 · Apt 4D

    Close
  • Plumbing

    Water supply

    Jun 29, 2026 · Apt BLDG

    Close
  • Paint/plaster

    Door/frame

    Mar 9, 2026 · Apt 1C

    Close
  • Safety

    Carbon monoxide detector

    Mar 9, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Mar 9, 2026 · Apt 1C

    Close
  • Door/window

    Window frame

    Mar 9, 2026 · Apt 1C

    Close
  • Safety

    Smoke detector

    Mar 9, 2026 · Apt 1C

    Close
  • Unsanitary condition

    Pests

    Mar 9, 2026 · Apt 1C

    Close
  • Heat/hot water

    Apartment only

    Feb 10, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Feb 10, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 10, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 9, 2026 · Apt 2B

    Close
  • Plumbing

    Water supply

    Feb 8, 2026 · Apt 5H

    Close
  • Heat/hot water

    Apartment only

    Jan 31, 2026 · Apt 4D

    Close
  • Heat/hot water

    Entire building

    Jan 31, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Dec 26, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Oct 29, 2025 · Apt 3C

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jul 27, 2025 · Apt BLDG

    Close
  • General

    Bell/buzzer/intercom

    Jul 27, 2025 · Apt BSMT

    Close
  • Unsanitary condition

    Sewage

    Jul 27, 2025 · Apt BSMT

    Close
  • Safety

    Carbon monoxide detector

    Jul 27, 2025 · Apt BSMT

    Close
  • Water leak

    Slow leak

    Jul 27, 2025 · Apt BSMT

    Close
  • Paint/plaster

    Wall

    Jul 27, 2025 · Apt BSMT

    Close
  • Unsanitary condition

    Pests

    Jul 27, 2025 · Apt BSMT

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 30, 2025 · Apt BLDG

    Close
  • Safety

    Fire escape

    Mar 30, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2025 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Jan 4, 2025 · Apt BLDG

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1939
Floors
6
Residential units
55
Building area
49,896 ft²
Lot area
15,004 ft²
Zoning
R8
Community board
205
Council district
14
Block / lot
3170 / 40
Assessed value
$901,350
Landmark / historic district
No

HPD registration #206331, last renewed Aug 30, 2025.

Questions about 2191 Creston Avenue

Who owns 2191 Creston Avenue?

The owner of record in NYC Department of City Planning PLUTO data is 25 Realty Associates, LLC.

Does 2191 Creston Avenue have violations?

Yes. NYC HPD has recorded 310 housing violations at this property.

Is 2191 Creston Avenue rent stabilized?

NYC Department of Finance tax bills listed 54 rent-stabilized units here in 2024 (about 98% of its 55 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 2191 Creston Avenue built?

City records list 1939 as the year it was built.

How many apartments are in 2191 Creston Avenue?

It has 55 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.