2554 Creston Avenue
Bronx, NY 10468BBL 2-03167-0040Map
Owner of record: 2554 Creston Associates, LLC.
2554 Creston Avenue is a walk-up apartment building built in 1919 in Bronx, 10468. It has 52 residential units across 5 floors. The owner of record is 2554 Creston Associates, LLC.. HPD has recorded 458 housing violations here, most recently on June 23, 2026. 7 of the 50 most recent violations are still open. City tax records listed 52 rent-stabilized apartments here in 2024.
- HPD violations
- 458
- DOB violations
- 3
- ECB violations
- 1
- HPD complaints
- 1,122
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 458
- CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) baseboard at east wall, ceiling in the 1st room from east at south located at apt 2e, 2nd story, 2nd apartment from north at east
Jun 23, 2026 · Apt 2E
Open — Defect letter issued - CImmediately hazardous
M/d law abate the nuisance consisting of cracked vinyl tile at floor that is creating a potential trip hazard in the kitchen located at apt 1d, 1st story, 2nd apartment from north at east
Jun 11, 2026 · Apt 1D
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic tile at west wall in the bathroom located at apt 1d, 1st story, 2nd apartment from north at east
Jun 11, 2026 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sq.ft at south wall in the bathroom located at apt 1d, 1st story, 2nd apartment from north at east
Jun 11, 2026 · Apt 1D
Closed — Violation dismissed - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 2e, 2nd story, 2nd apartment from north at east
Jun 11, 2026 · Apt 2E
Open — Civ14 mailed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2e, 2nd story, 2nd apartment from north at east
Jun 11, 2026 · Apt 2E
Closed — Violation dismissed - BHazardous
Trace and repair the source and abate the visible mold condition... less than 30 sq.ft at ceiling, east south and west walls in the bathroom located at apt 2e, 2nd story, 2nd apartment from north at east
Jun 11, 2026 · Apt 2E
Open — Invalid certification - BHazardous
Nyc fire code § 703.1.3; nyc fire code § 703.2: adjust door to prevent gaps between the top and side edges of door and door jamb exceeding the maximum allowable clearance of 1/8 of an inch and maximum allowable clearance of 3/4 of an inch between the door bottom and sill at at door in the entrance located at apt 1d, 1st story, 2nd apartment from north at east
Jun 11, 2026 · Apt 1D
Open — Civ14 mailed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 5e, 5th story, 2nd apartment from north at east
Apr 12, 2026 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at all electrical fixtures in the entire apartment located at apt 5e, 5th story, 2nd apartment from north at east
Apr 12, 2026 · Apt 5E
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
M/d law abate the nuisance consisting of large bed blocking fire escape window in the 1st room from east at south located at apt 5e, 5th story, 2nd apartment from north at east
Apr 12, 2026 · Apt 5E
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 5e, 5th story, 2nd apartment from north at east
Apr 12, 2026 · Apt 5E
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of double cylinder lock at room door to fire escape window in the 1st room from east at south located at apt 5e, 5th story, 2nd apartment from north at east
Apr 12, 2026 · Apt 5E
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Mar 12, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges at door from street to vestibule , 1st story, section ''2554''
Feb 28, 2026
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective wood sub-floor (near sink base cabinet) in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north
Feb 15, 2026 · Apt 2C
Closed — Violation closed - ANon-hazardous
No decorating in 3 years. paint with light colored paint to the satisfaction of this department ceiling walls trims and baseboard moldings including inside of closets throughout in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Feb 15, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Feb 15, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north
Jan 30, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of discarded range with doors intact at public hall, 2nd story, section ''2554''
Jan 23, 2026
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 23, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules improperly installed in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 23, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations improperly installed in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 23, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all walls ceiling and trim throughout in the entire apartment located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door frame in the entrance located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Remove all obstructions and repair all defects in wasteline drain pipe at sink in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective (defective latch of the lock on the door) in the entrance located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl tile floor covering in the 1st room from north located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of gas to the fixtures at range in the kitchen located at apt 2c, 2nd story, 1st apartment from west at north , section ''2554''
Jan 14, 2026 · Apt 2C
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... more than 10 sq ft at east wall in the 1st room from east at south located at apt 2e, 2nd story, 2nd apartment from north at east
Oct 8, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective at ceramic saddle in the bathroom located at apt 2e, 2nd story, 2nd apartment from north at east
Jul 24, 2025 · Apt 2E
Closed — Violation dismissed - BHazardous
Provide adequate supply of hot water for the fixtures at wash basin in the bathroom located at apt 1d, 1st story, 2nd apartment from north at east , section ''2554''
Jul 24, 2025 · Apt 1D
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective wood wall cabinet at north wall in the kitchen located at apt 2e, 2nd story, 2nd apartment from north at east
Jul 24, 2025 · Apt 2E
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling , south and west walls in the bathroom located at apt 2e, 2nd story, 2nd apartment from north at east
Jul 24, 2025 · Apt 2E
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective at vinyl floor tile in the kitchen located at apt 2e, 2nd story, 2nd apartment from north at east
Jul 24, 2025 · Apt 2E
Closed — Violation closed - CImmediately hazardous
Trace and repair the source and abate the visible mold condition... greater than 10 sqft at ceiling , south and west walls in the bathroom located at apt 2e, 2nd story, 2nd apartment from north at east original violation 18118851 issued 24-jul-25 has been upgraded to class c per administrative code 27-2017.3a(5)(a) or (b).
Jul 24, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Fire escape defective. replace with new the broken, defective and/or missing 4 rungs up from bottom , at the drop ladder at the 1st fire escape from south at east exterior wall
Jul 24, 2025
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east , section ''2554''
Jul 24, 2025 · Apt 1D
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 1d, 1st story, 2nd apartment from north at east , section ''2554''
Jul 24, 2025 · Apt 1D
Closed — Violation closed - BHazardous
Provide adequate supply of cold water for the fixtures at wash basin in the bathroom located at apt 1d, 1st story, 2nd apartment from north at east , section ''2554''
Jul 24, 2025 · Apt 1D
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall in the 1st room from east at south located at apt 2e, 2nd story, 2nd apartment from north at east
Jul 8, 2025 · Apt 2E
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east at south located at apt 2e, 2nd story, 2nd apartment from north at east
Jul 8, 2025 · Apt 2E
Closed — Violation closed - ANon-hazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 1c, 1st story, 1st apartment from south at west
Jun 27, 2025 · Apt 1C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling and east wall in the 2nd room from east located at apt 1c, 1st story, 1st apartment from south at west
Jun 27, 2025 · Apt 1C
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective concrete floor in the bathroom located at apt 1c, 1st story, 1st apartment from south at west
Jun 27, 2025 · Apt 1C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3a, 3rd story, 1st apartment from north at east
Jun 27, 2025 · Apt 3A
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective bell and buzzer return intercom system building entrance to in the kitchen located at apt 1c, 1st story, 1st apartment from south at west
Jun 27, 2025 · Apt 1C
Closed — Violation dismissed
DOB building violations · 3
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 1
- Class - 2
Failure to maintain bldg wall(s)or appurtenances.noted:@ roof level parapet wall @ west side,has slight bowing also noted brick mortar @ multiple locations is missing & gaps occurr.rem:maintain exterior wall.
Dec 31, 2014 · Penalty $500
Resolve
Complaints
- Unsanitary condition
Mold
Sep 25, 2026 · Apt 1D
Open - Electric
Power outage
Apr 10, 2026 · Apt 5E
Close - General
Cooking gas
Apr 10, 2026 · Apt 5E
Close - Electric
Power outage
Mar 17, 2026 · Apt 4A
Close - Water leak
Heavy flow
Mar 11, 2026 · Apt 2C
Close - Door/window
Door
Mar 11, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Mar 11, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Mar 11, 2026 · Apt 2C
Close - Flooring/stairs
Floor
Mar 11, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Feb 14, 2026 · Apt 2C
Close
Show 40 more ↓
- Unsanitary condition
Pests
Feb 14, 2026 · Apt 2C
Close - Plumbing
Toilet
Feb 14, 2026 · Apt 2C
Close - Door/window
Door frame
Feb 14, 2026 · Apt 2C
Close - Paint/plaster
Wall
Feb 14, 2026 · Apt 2C
Close - Plumbing
Steam pipe/riser
Jan 29, 2026 · Apt 2C
Close - Door/window
Door
Jan 29, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 24, 2026 · Apt BLDG
Close - Appliance
Electric/gas range
Jan 13, 2026 · Apt 2C
Close - Water leak
Slow leak
Jan 13, 2026 · Apt 2C
Close - Unsanitary condition
Pests
Jan 13, 2026 · Apt 2C
Close - Plumbing
Basin/sink
Jan 13, 2026 · Apt 2C
Close - Door/window
Door
Jan 13, 2026 · Apt 2C
Close - Flooring/stairs
Floor
Jan 13, 2026 · Apt 2C
Close - Paint/plaster
Ceiling
Jan 13, 2026 · Apt 2C
Close - Paint/plaster
Wall
Jan 13, 2026 · Apt 2C
Close - Door/window
Door
Jan 13, 2026 · Apt 2C
Close - Flooring/stairs
Floor
Jun 25, 2025 · Apt 1C
Close - Flooring/stairs
Floor
Jun 25, 2025 · Apt 1C
Close - Paint/plaster
Wall
Jun 25, 2025 · Apt 1C
Close - Flooring/stairs
Floor
Jun 25, 2025 · Apt 1C
Close - Unsanitary condition
Mold
Jun 11, 2025 · Apt 1C
Close - Electric
Power outage
May 14, 2025 · Apt 3A
Close - Electric
Lighting
May 14, 2025 · Apt 3A
Close - Door/window
Door
Dec 23, 2024 · Apt 4C
Close - Water leak
Slow leak
Dec 23, 2024 · Apt 4C
Close - Heat/hot water
Entire building
Nov 25, 2024 · Apt BLDG
Close - Water leak
Slow leak
Nov 6, 2024 · Apt 4C
Close - Paint/plaster
Ceiling
Nov 6, 2024 · Apt 4C
Close - Heat/hot water
Apartment only
Oct 28, 2024 · Apt 3G
Close - Unsanitary condition
Pests
Oct 23, 2024 · Apt 2E
Close - Door/window
Window frame
Oct 23, 2024 · Apt 2E
Close - Plumbing
Basin/sink
Oct 23, 2024 · Apt 2E
Close - Door/window
Door
Oct 23, 2024 · Apt 2E
Close - Paint/plaster
Wall
Oct 23, 2024 · Apt 2E
Close - Flooring/stairs
Floor
Oct 23, 2024 · Apt 2E
Close - Unsanitary condition
Pests
Oct 23, 2024 · Apt 2E
Close - Door/window
Door frame
Oct 23, 2024 · Apt 2E
Close - Unsanitary condition
Mold
Oct 23, 2024 · Apt 2E
Close - Water leak
Slow leak
Oct 5, 2024 · Apt 4C
Close - Flooring/stairs
Floor
Oct 5, 2024 · Apt 4C
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1919
- Floors
- 5
- Residential units
- 52
- Building area
- 40,600 ft²
- Lot area
- 11,528 ft²
- Zoning
- R8
- Community board
- 207
- Council district
- 14
- Block / lot
- 3167 / 40
- Assessed value
- $970,650
- Landmark / historic district
- No
HPD registration #210148, last renewed Jul 14, 2026.
Questions about 2554 Creston Avenue
Who owns 2554 Creston Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2554 Creston Associates, LLC..
Does 2554 Creston Avenue have violations?
Yes. NYC HPD has recorded 458 housing violations at this property.
Is 2554 Creston Avenue rent stabilized?
NYC Department of Finance tax bills listed 52 rent-stabilized units here in 2024 (about 100% of its 52 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2554 Creston Avenue built?
City records list 1919 as the year it was built.
How many apartments are in 2554 Creston Avenue?
It has 52 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.