2060 Grand Concourse
Bronx, NY 10457BBL 2-03156-0003Map
Owner of record: 2060 Assoc LLC
2060 Grand Concourse is a walk-up apartment building built in 1923 in Bronx, 10457. It has 40 residential units across 5 floors. The owner of record is 2060 Assoc LLC. HPD has recorded 1,640 housing violations here, most recently on September 17, 2026. 35 of the 50 most recent violations are still open. City tax records listed 6 rent-stabilized apartments here in 2024.
- HPD violations
- 1,640
- DOB violations
- 4
- ECB violations
- 2
- HPD complaints
- 2,101
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,640
- BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes household items at 3rd, and 2nd story balconies at 1st fire escape from north at west exterior wall at fire escape
Sep 17, 2026
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from west at north wall, north wall, west wall in the 4th room from east located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) east wall in the 5th room from east at south located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st window frame from east at south wall in the kitchen located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard-paint that is peeling or on a deteriorated subsurface and either tested inconclusive for lead content at 0.5mg/cm2 or tested positive for lead content on a metal or ceramic substrate as set forth in (28 rcny §11-07(b)) using work practices set forth in 28 rcny §11-06(b)(2). 1st riser from east at south wall in the 5th room from east at north located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 2nd private hallway from east located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall in the 1st private hallway from east located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, east wall in the foyer located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Certification postponment granted - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at 1st closet from west at north wall shelf in the 1st private hallway from east located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Nov sent out - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 2, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 2d, 3rd story, 1st apartment from south at west , section at south
Jun 22, 2026 · Apt 2D
Open — Not complied with
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinge in the entrance located at apt 3d, 4th story, 1st apartment from south at west , section ''south''
Jun 21, 2026 · Apt 3D
Closed — Violation closed - BHazardous
Remove all encumbrances consisting of construction material at 1st public hall bulkhead from north, 5th story, section ''south''
Jun 21, 2026
Open — Nov sent out - BHazardous
Provide adequate light of not less than 60 watts incandescent or equivalent illumination at ceiling at public hall at , 3rd story
Jun 21, 2026
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective cracked concrete window sill at the south wall windows at 2nd, and 3rd stories public hall stair case (south section), causing a falling object hazard
Jun 16, 2026
Closed — Violation closed - BHazardous
Provide adequate lighting for at fixtures, at all stories 1-5 at 1st public hall stairs from north
Jun 16, 2026
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Jun 16, 2026
Open — Nov sent out - ANon-hazardous
Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page
Jun 16, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 2D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0, wg to replace = 0, wg to repair = 2 in the entire apartment located at apt 2d, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 1st room from east located at apt 2d, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective protruding ceramic floor tile causing a tripping hazard in the bathroom located at apt 2d, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 2D
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet ,, in the bathroom located at apt 3g, 4th story, 1st apartment from east at south
Jun 3, 2026 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 4th story, 1st apartment from east at south
Jun 3, 2026 · Apt 3G
Open — Notice of issuance sent to tenant - IInformation / order
Property registration was filed with false or incomplete information related to the property contacts. file with this department a true registration statement for the building.
May 6, 2026
Open — Info nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective wood door at entrance in the 1st room from east located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color atceiling in the bathroom located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Closed — Violation dismissed - ANon-hazardous
Properly repair with similar material the broken or defective vinyl tiles at floor in the 3rd room from east located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the south wall, baseboard at south wall, 1st door from south at west wall, west wall, baseboard at south wall, 1st door from south at west wall, south wall, west wall, south wall, baseboard at south wall, west wall, 1st door from south at west wall in the 1st room from east located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2d, 3rd story, 1st apartment from south at west
Apr 29, 2026 · Apt 2D
Open — Notice of issuance sent to tenant - BHazardous
Properly repair or replace the broken or defective rubber gasket at freezer door and refrigerator door in the kitchen located at apt 2d, 3rd story, 1st apartment from south at west
Apr 29, 2026 · Apt 2D
Closed — Violation dismissed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall in the private hallway located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Closed — Violation closed - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door frame from south at west wall, north wall, east wall, 1st window frame from east at south wall in the 1st room from east located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the baseboard at north wall, 1st closet from west at north wall door, 1st closet from west at north wall door, 1st closet from west at north wall door frame in the private hallway located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the kitchen , the 3rd room from east located at apt 2g, 3rd story, 1st apartment from east at south
Apr 29, 2026 · Apt 2G
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3d, 3rd story, 1st apartment from south at west , section at south
Apr 10, 2026 · Apt 3D
Open — Notice of issuance sent to tenant - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north , section ''south''
Apr 8, 2026 · Apt 2B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Apr 8, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north
Apr 8, 2026 · Apt 4B
Closed — Violation closed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4b, 5th story, 1st apartment from west at north
Apr 8, 2026 · Apt 4B
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Apr 8, 2026
Open — Not complied with - CImmediately hazardous
Provide hot water at all hot water fixtures in the entire apartment located at apt 2b, 3rd story, 1st apartment from west at north , section ''south''
Apr 8, 2026 · Apt 2B
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at building north section at public hall, 4th story
Mar 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at building north section at public hall, 2nd story
Mar 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at building north section at public hall, 3rd story
Mar 25, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 3rd story, section ''north''
Mar 9, 2026
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective light fixture at ceiling at public hall, 4th story, section ''north''
Mar 9, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 2c, 3rd story, 2nd apartment from south at west
Jan 22, 2026 · Apt 2C
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 2c, 3rd story, 2nd apartment from south at west
Jan 22, 2026 · Apt 2C
Closed — Violation dismissed
DOB building violations · 4
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Apr 29, 2021
Dob violation - dismissed - Construction other optional
.due to fire
Jan 11, 2020
Dob violation - dismissed - Failure to benchmark none
Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4
May 3, 2019
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed
ECB violations · 2
- Class - 3
Failure to provide access to heating system as per hmc 27-2033.; misc-27
Dec 20, 2023 · Penalty $250
Resolve - Class - 3
Front fire escape egress path blocked by window ac unit at first tier,, repair and or replace
Dec 14, 2023 · Penalty $250
Resolve
Complaints
- Unsanitary condition
Pests
Sep 11, 2026 · Apt 2E
Close - Unsanitary condition
Pests
Sep 11, 2026 · Apt 2E
Close - Unsanitary condition
Pests
Aug 31, 2026 · Apt 2F
Open - Unsanitary condition
Pests
Aug 31, 2026 · Apt 2F
Open - Plumbing
Bathtub/shower
Jul 19, 2026 · Apt APT3F
Open - Electric
No lighting
Jun 15, 2026 · Apt 2G
Close - Appliance
Electric/gas range
Jun 10, 2026 · Apt 4D
Close - Appliance
Electric/gas range
Jun 9, 2026 · Apt 2D
Close - Flooring/stairs
Floor
Jun 9, 2026 · Apt 2D
Close - Appliance
Electric/gas range
Jun 8, 2026 · Apt 2D
Close
Show 40 more ↓
- Appliance
Refrigerator
May 1, 2026 · Apt 2D
Close - Heat/hot water
Apartment only
May 1, 2026 · Apt 3G
Close - Plumbing
Water supply
May 1, 2026 · Apt 3G
Close - Flooring/stairs
Floor
Apr 27, 2026 · Apt QG
Close - Paint/plaster
Ceiling
Apr 27, 2026 · Apt QG
Close - Appliance
Refrigerator
Apr 27, 2026 · Apt 2D
Close - Door/window
Window frame
Apr 27, 2026 · Apt QG
Close - Heat/hot water
Entire building
Apr 20, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt 2B
Close - Heat/hot water
Entire building
Apr 9, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 9, 2026 · Apt 3D
Close - Heat/hot water
Entire building
Apr 8, 2026 · Apt BLDG
Close - Plumbing
Water supply
Apr 8, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Apr 8, 2026 · Apt 3D
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 1D
Close - Heat/hot water
Apartment only
Apr 7, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Apr 7, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Apr 5, 2026 · Apt B
Close - Heat/hot water
Entire building
Mar 30, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Mar 29, 2026 · Apt 1A
Close - Heat/hot water
Entire building
Mar 28, 2026 · Apt BLDG
Close - Electric
Power outage
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 24, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2026 · Apt BLDG
Close - Electric
No lighting
Mar 7, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Mar 7, 2026 · Apt 3G
Close - Heat/hot water
Entire building
Mar 7, 2026 · Apt 2B
Close - Heat/hot water
Apartment only
Feb 7, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Feb 1, 2026 · Apt B
Close - Heat/hot water
Entire building
Jan 30, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 28, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 26, 2026 · Apt BLDG
Close - Heat/hot water
Apartment only
Jan 23, 2026 · Apt 2C
Close - Heat/hot water
Apartment only
Jan 20, 2026 · Apt 2C
Close - Paint/plaster
Wall
Jan 20, 2026 · Apt 2C
Close - Flooring/stairs
Floor
Jan 20, 2026 · Apt 2C
Close - Door/window
Window frame
Jan 20, 2026 · Apt 2C
Close - Heat/hot water
Entire building
Jan 18, 2026 · Apt 2B
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1923
- Floors
- 5
- Residential units
- 40
- Building area
- 34,506 ft²
- Lot area
- 9,954 ft²
- Zoning
- R8
- Community board
- 205
- Council district
- 15
- Block / lot
- 3156 / 3
- Assessed value
- $1,120,500
- Landmark / historic district
- No
HPD registration #204280, last renewed Jun 23, 2026.
Questions about 2060 Grand Concourse
Who owns 2060 Grand Concourse?
The owner of record in NYC Department of City Planning PLUTO data is 2060 Assoc LLC.
Does 2060 Grand Concourse have violations?
Yes. NYC HPD has recorded 1,640 housing violations at this property.
Is 2060 Grand Concourse rent stabilized?
NYC Department of Finance tax bills listed 6 rent-stabilized units here in 2024 (about 15% of its 40 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2060 Grand Concourse built?
City records list 1923 as the year it was built.
How many apartments are in 2060 Grand Concourse?
It has 40 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.