roofy

253 East 181 Street

Bronx, NY 10457BBL 2-03149-0118Map

Owner of record: 181 Ventures LLC

253 East 181 Street is an elevator apartment building built in 1939 in Bronx, 10457. It has 37 residential units across 6 floors. The owner of record is 181 Ventures LLC. HPD has recorded 661 housing violations here, most recently on September 21, 2026. 14 of the 50 most recent violations are still open. City tax records listed 38 rent-stabilized apartments here in 2024.

HPD violations
661
DOB violations
32
ECB violations
18
HPD complaints
966

What to know

Concern
1 open Class C

Immediately hazardous issues among recent violations are still open.

Watch
Last violation Sep 21, 2026

Date of the most recent HPD inspection that found a problem.

Good
No unpaid ECB fines

No balance due on recent ECB violations.

Rent stabilization

Rent-stabilized units in 2024
38
About 100% of the building's 37 apartments
Up from 37 in 2018

Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.

Stabilized units by tax-bill year

Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.

Violations

Most recent first. Showing up to 50 per agency.

HPD housing violations · 661

  • A

    Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story

    Sep 21, 2026

    Open — Nov sent out
  • A

    Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story

    Sep 21, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of construction material at public hall, 1st story

    Sep 21, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    Sep 21, 2026

    Open — Nov sent out
  • B

    Remove all encumbrances consisting of household items at public hall, 2nd story

    Sep 21, 2026

    Open — Nov sent out
  • B

    Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.

    Sep 2, 2026

    Open — Nov sent out
  • A

    Post a proper notice regarding rent stabilization law, in a form approved by the commissioner, in a conspicuous location within the common area at the buildings entrance. for more information about signage requirements, please visit: https://www.nyc.gov/site/hpd/services-and-information/required-signage.page

    May 9, 2026

    Open — Nov certified on time
  • A

    Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story

    May 9, 2026

    Open — Nov certified on time
  • A

    Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story

    May 9, 2026

    Open — Nov certified on time
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at center rear court yard

    May 9, 2026

    Closed — Violation closed
Show 40 more ↓
  • B

    Properly secure the loose 13th tread from bottom up at public hall stairs, 6th story

    May 9, 2026

    Closed — Violation closed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder secured with appropriate nuts and bolts at 1st fire escape from south at east exterior wall at fire escape

    May 9, 2026

    Open — Nov certified on time
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage at rear center court yard

    May 9, 2026

    Closed — Violation closed
  • C

    Abate the nuisance consisting of evidence of rats and all underlying causes creating the pest infestations, by using integrated pest management (ipm), eliminate all burrow entry and passageways, pest nests, holes, gaps or cracks in walls, ceilings, floors, fixing leaks and managing garbage in public areas. evidence found at evidence of burrows court

    May 9, 2026

    Open — Not complied with
  • B

    And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes air conditioning unit and household items at fire escape, 6th story

    May 9, 2026

    Closed — Violation closed
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling near elevator at public hall, 6th story

    Mar 25, 2026

    Closed — Violation dismissed
  • A

    § 53, 187, 231 m/d law and department rules and regulations. provide a shoe properly secured to bottom of string of dropladder 1st stack from north at west at building rear at fire escape

    Mar 8, 2026

    Closed — Violation closed
  • C

    Provide ready access to buildings heating system door locked at boiler room

    Feb 11, 2026

    Closed — Violation dismissed
  • C

    Provide hot water at all hot water fixtures in the entire apartment located at apt 1d, 2nd story, 1st apartment from east at south

    Feb 11, 2026 · Apt 1D

    Closed — Violation closed
  • B

    Trace and repair the source and abate the visible mold condition... greater than 10 sq ft at west and south wall in the bathroom located at apt 1d, 2nd story, 1st apartment from east at south

    Feb 11, 2026 · Apt 1D

    Closed — Violation dismissed
  • C

    Provide an adequate supply of heat for the apartment in the entire apartment located at apt 1d, 2nd story, 1st apartment from east at south

    Feb 11, 2026 · Apt 1D

    Closed — Violation dismissed
  • B

    Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the floor yard at north

    Aug 3, 2025

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of discarded range (with doors attached) at public hall, 1st story

    Aug 3, 2025

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at vestibule at public hall, 1st story

    Aug 3, 2025

    Open — Nov sent out
  • A

    Cleanse to the satisfaction of this department the floor yard at north

    Aug 3, 2025

    Open — Nov sent out
  • B

    Properly repair with similar material the broken or defective fire retardant material at ceiling at vestibule at public hall, 1st story

    Aug 3, 2025

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 4c, 5th story, 2nd apartment from north at east

    Mar 18, 2025 · Apt 4C

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 4c, 5th story, 2nd apartment from north at east

    Mar 18, 2025 · Apt 4C

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) south wall in the 1st room from east located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, east wall in the kitchen located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the south wall in the 1st room from east located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the east wall in the bathroom located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation dismissed
  • A

    Paint with light colored paint to the satisfaction of this department the west wall in the private hallway located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation dismissed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, south wall, east wall in the 4th room from east located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) west wall in the private hallway located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) east wall in the bathroom located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - presumed lead paint that is peeling or on a deteriorated subsurface using work practices set forth in 28 rcny §11-06(b)(2) ceiling, east wall in the kitchen located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department the ceiling, south wall, east wall in the 4th room from east located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation dismissed
  • B

    Properly repair or replace the broken or defective electrical outlet at east wall in the bathroom located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation dismissed
  • C

    M/d law abate the nuisance consisting of refrigerator with doors attached at 2nd story public hallway

    Mar 5, 2025

    Closed — Violation dismissed
  • C

    Replace or repair the self-closing doors that is missing or defective hinges at ddoor in the entrance located at apt 1d, 2nd story, 1st apartment from east at south

    Mar 5, 2025 · Apt 1D

    Closed — Violation closed
  • C

    Abate the infestation consisting of roaches in the entire apartment located at apt 5a, 6th story, 1st apartment from south at west

    Feb 26, 2025 · Apt 5A

    Closed — Violation dismissed
  • C

    Abate the infestation consisting of mice in the entire apartment located at apt 5a, 6th story, 1st apartment from south at west

    Feb 26, 2025 · Apt 5A

    Closed — Violation dismissed
  • B

    Properly repair the source and abate the evidence of a water leak at ceiling at vestibule , 1st story

    Feb 13, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department at ceiling at vestibule , 1st story

    Feb 13, 2025

    Closed — Violation closed
  • A

    Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the bathroom , the foyer , the 4th room from east, the kitchen located at apt 1d, 2nd story, 1st apartment from east at south

    Feb 13, 2025 · Apt 1D

    Open — Not complied with
  • C

    Properly repair with similar material the broken or defective approximately 8 sq. ft. unkeyed fire retardant material at ceiling at vestibule , 1st story

    Feb 13, 2025

    Closed — Violation closed
  • C

    Certify compliance with lead-based paint hazard control requirements during period of unit vacancy by performing activities necessary to abate tested lead-based paint from required window and/or door friction surfaces for apartment and make floors smooth and cleanable, positive lead-based paint in an apartment with a child under six located at apt 4c, 5th story, 2nd apartment from north at east

    Feb 13, 2025 · Apt 4C

    Closed — Violation closed
  • C

    Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) 1st door from south at west wall, 1st door frame from south at west wall in the foyer located at apt 4c, 5th story, 2nd apartment from north at east

    Feb 13, 2025 · Apt 4C

    Closed — Violation closed
  • C

    Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 1, wg to replace = 0, wg to repair = 0 in the entire apartment located at apt 4c, 5th story, 2nd apartment from north at east

    Feb 13, 2025 · Apt 4C

    Closed — Violation dismissed

DOB building violations · 32

  • Low pressure boiler boiler required

    Violation issued-failure to file 2019 external low pressure inspection

    Jun 20, 2023

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 2, 2022

    Dob violation - dismissed
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 9a technical report by 02/21/2022

    Feb 22, 2022

    Dob violation - dismissed
  • Failure to post energy grade/score none

    Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3

    Apr 29, 2021

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    Aug 3, 2020

    Dob violation - dismissed
  • Failure to benchmark none

    Failure to file benchmarking report of energy use as per ad. code sec. 28-309.4

    May 3, 2020

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 6, 2019

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 13, 2018

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 8a technical report by 02/21/2017

    May 31, 2018

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Oct 10, 2017

    Dob violation - resolved
Show 22 more ↓
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 9, 2015

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jun 2, 2014

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 26, 2013

    Dob violation - resolved
  • No report and / or late filing (facade) facade required

    Failed to file fisp cycle 7a technical report by 02/21/2012

    Jan 31, 2013

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 14, 2012

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 15, 2011

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Mar 19, 2008

    Dob violation - resolved
  • Facade facade optional

    Ll1198-local law 11/98 - facade facade optional

    Nov 30, 2007

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jul 23, 2007

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Nov 14, 2006

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Jan 7, 2006

    Dob violation - resolved
  • Elevator elevatoroptional

    Ll1081-local law 10/81 - elevator elevatoroptional

    Oct 1, 2005

    Dob violation - dismissed
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    May 25, 2005

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Feb 14, 2004

    Dob violation - resolved
  • Elevator elevatorrequired

    E-elevator elevatorrequired

    Apr 29, 2003

    Dob violation - resolved
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Mar 19, 2003

    Dob violation - dismissed
  • Elevator elevatorrequired

    2p1881

    Jul 12, 2001

    Dob violation - resolved
  • Facade facade optional

    Ll10/80-local law 10/80 - facade facade optional

    Mar 29, 2000

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    May 4, 1998

    Dob violation - dismissed
  • Boilers boiler required

    Ll6291-local law 62/91 - boilers boiler required

    Jun 9, 1994

    Dob violation - dismissed
  • Elevator elevatorrequired

    (74)secure smoke hole grating.(74)replace missing splice box covr where necessary.(74)cover hand holes on inside of hoistway doors

    Oct 12, 1990

    Dob violation - resolved
  • Elevator elevatorrequired

    (51)renew first fl.saddle.(52)clean car top(53)replace missing splice box covers wher necessary(54)properly fuse controller(55) secure smoke hole grateing.(56)file a bn appl.for illegally installed controller & car panels to be tested inspected & approved by an insp from this dept

    Sep 29, 1988

    Dob violation - resolved

ECB violations · 18

  • Class - 2

    Failure to submit an acceptable required cycle 6,7a,8a,and 9a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#912399.rem:submit acceptabl

    Dec 2, 2022 · Penalty $1,250

    Resolve
  • Class - 2

    Failure to submit an acceptable required cycle 8a report of critical examination documenting condition of exterior wall and appurtenances required by 28-302.4 for control#808019.agg1 prior nov 37011073p under 2

    Apr 1, 2021 · Penalty $1,250

    Resolve
  • Class - 2

    02x10,26d06,53u07,52u07,40o02,70o02,34d06. 02-repair two-way communication; 26-secured top emergency exit; 59-provide data tag; 52-provide data tag; 40-clean machine room; 70-clean pit; 34-secure traveler on

    May 23, 2019

    Resolve
  • Class - 2

    Unapproved,unsafe,unsuitable electrical equipment,apparatus,materials,devices appliances or wiring in use apt 5a:defective light defective receptacles outlets are in use,10 bedrooms,kitchen:rem:comply with ec c

    Jan 22, 2019 · Penalty $400

    Resolve
  • Class - 2

    Failure to submit acceptable 8th round report of critical examination documenting condition of exterior walls and appurtenances required by 28-302.4 for control#808019. remedy: submit required technical report

    May 18, 2018 · Penalty $1,250

    Resolve
  • Class - 2

    Electrical closet not dedicated to electrical distribution equipment only. observed lots of debris, furnitures, appliances in electrical closet. (observed no chronic problem in apt 31) rmdy: comply with ec

    Feb 20, 2018

    Resolve
  • Class - 2

    Failure to file an acceptable cycle 7 technical report in compliance with code provisions: periodic inspection of exterior walls & appurtenances as required by article 28-302 & the dept of bldgs rules & regulat

    May 27, 2014 · Penalty $4,000

    Resolve
  • Class - 2

    39m07,97m07,70y02,71i10,40o02,41d10,97m07,02b10. 39m07-according to controller data tag.there should be a top of car run box and stop switch97m07-fire signs missing do not use in case of fire;70y02-pit full of

    Dec 6, 2013 · Penalty $500

    Resolve
  • Class - 2

    Failure to maintain building wall(s) or appurtenances/noted:cracked bricks observed below 6th,5th,4th, &3rd floor windows,@center courtyard southeast wall.rem:maintain bldg.

    Feb 13, 2013

    Resolve
  • Class - 2

    03m11/ 56y13/ 67m07/ 70y02/ 03 - replace missing hand rail in car 67- provide communication in car (telephone ) 70 - clean oil from elecatorpit

    Nov 15, 2011

    Resolve
Show 8 more ↓
  • Class - 2

    56/y/13,43/q/03,58/f/10,42/q/03,70/o/02,70/z/09/71/x/10,08/v/10-70-remove water & clean pit (sump pump not working)08-repair lobby flr stop

    Sep 1, 2010

    Resolve
  • Class - 1

    Failure to provide unobstructed exit passageway noted stored passenger vehicle under drop ladder from fire escape at side court yard ofproperty partially blocking secondary means of egress (fire escape exit)

    Dec 23, 2008 · Penalty $6,000

    Resolve
  • Class - 2

    Illegal use in residential district r7-1 (general residence district) noted stored passenger vehicle w/o license plates and registration at side court yard under drop ladder from fire escape creating unsafe

    Dec 23, 2008 · Penalty $400

    Resolve
  • Class - 2

    100u05.10m10.58#10 100u05 current 2yr gov tag 58#10 repair excessive motor bearing noise

    Nov 25, 2008 · Penalty $2,500

    Resolve
  • Non-hazardous

    59x10,40t07,40w06,64i11,25r09,63m15,16r09,33p16.25-replace as per code.16-hand hole & replace w/push plates as per code.33-key holes missing.

    Aug 13, 2007 · Penalty $180

    Resolve
  • Hazardous

    Failure to file an amended round five report acceptable to this department pursuant to rule r.c.n.y.32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report. remedy: file an

    Jan 26, 2001 · Penalty $1,000

    Resolve
  • Hazardous

    Failure to file an amend round five report acceptable to this dept. pursuant to rule r.c.n.y. 32-03b(5), indicating correction of hazardous conditions described in initial ll10/80 report.remedy:file an amend

    Jun 5, 2000 · Penalty $400

    Resolve
  • Non-hazardous

    Failure to maintain exterior building wall. noted at west and south elevations parapet brick masonry spalled, cracked, step cracked and with open mortar joints throughout. remedy: provide proper protection

    Apr 19, 2000

    Resolve

Complaints

  • Water leak

    Slow leak

    Sep 22, 2026 · Apt A

    Close
  • Unsanitary condition

    Sewage

    Sep 22, 2026 · Apt A

    Close
  • Appliance

    Electric/gas range

    Sep 11, 2026 · Apt 2F

    Close
  • Paint/plaster

    Wall

    Aug 13, 2026 · Apt A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Aug 13, 2026 · Apt A

    Close
  • Door/window

    Window pane

    Apr 29, 2026 · Apt 4A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Mar 6, 2026 · Apt 5A

    Close
  • Water leak

    Heavy flow

    Mar 6, 2026 · Apt 5A

    Close
  • Paint/plaster

    Ceiling

    Mar 6, 2026 · Apt 5A

    Close
  • Electric

    No lighting

    Mar 6, 2026 · Apt 5A

    Close
Show 40 more ↓
  • Unsanitary condition

    Pests

    Mar 6, 2026 · Apt 5A

    Close
  • Plumbing

    Water supply

    Mar 6, 2026 · Apt 5A

    Close
  • Appliance

    Refrigerator

    Mar 6, 2026 · Apt 5A

    Close
  • Appliance

    Electric/gas range

    Mar 6, 2026 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Mar 6, 2026 · Apt 5A

    Close
  • Paint/plaster

    Ceiling

    Feb 26, 2026 · Apt 5A

    Close
  • Water leak

    Slow leak

    Feb 26, 2026 · Apt 5A

    Close
  • Paint/plaster

    Ceiling

    Feb 26, 2026 · Apt 5A

    Close
  • Paint/plaster

    Ceiling

    Feb 26, 2026 · Apt 5A

    Close
  • Water leak

    Slow leak

    Feb 26, 2026 · Apt 1B

    Close
  • Appliance

    Refrigerator

    Feb 26, 2026 · Apt 5A

    Close
  • Appliance

    Electric/gas range

    Feb 26, 2026 · Apt 5A

    Close
  • Heat/hot water

    Apartment only

    Feb 12, 2026 · Apt 5E

    Close
  • Heat/hot water

    Entire building

    Feb 12, 2026 · Apt BLDG

    Close
  • Plumbing

    Water supply

    Feb 11, 2026 · Apt BLDG

    Close
  • Heat/hot water

    Entire building

    Feb 9, 2026 · Apt BLDG

    Close
  • Safety

    Fire escape

    Jan 9, 2026 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jan 9, 2026 · Apt 5A

    Close
  • Unsanitary condition

    Garbage/recycling storage

    Jan 9, 2026 · Apt 5A

    Close
  • Flooring/stairs

    Floor

    Jan 9, 2026 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jan 9, 2026 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Oct 30, 2025 · Apt 5A

    Close
  • Electric

    No lighting

    Jul 21, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jul 8, 2025 · Apt 5A

    Close
  • Unsanitary condition

    Pests

    Jul 8, 2025 · Apt 5A

    Close
  • General

    Mailbox

    Jun 20, 2025 · Apt 5A

    Close
  • Door/window

    Door

    Jun 20, 2025 · Apt 5A

    Close
  • General

    Bell/buzzer/intercom

    Jun 20, 2025 · Apt 5A

    Close
  • Heat/hot water

    Entire building

    Jun 9, 2025 · Apt BLDG

    Close
  • Plumbing

    Bathtub/shower

    Jun 7, 2025 · Apt 5F

    Close
  • Appliance

    Refrigerator

    Jun 7, 2025 · Apt 5F

    Close
  • Plumbing

    Basin/sink

    Jun 7, 2025 · Apt 5F

    Close
  • Unsanitary condition

    Pests

    Jun 7, 2025 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Jun 7, 2025 · Apt 5A

    Close
  • Paint/plaster

    Wall

    Jun 7, 2025 · Apt 5F

    Close
  • Heat/hot water

    Entire building

    Jun 6, 2025 · Apt BLDG

    Close
  • Plumbing

    Water supply

    May 11, 2025 · Apt 3B

    Close
  • Water leak

    Heavy flow

    May 5, 2025 · Apt A

    Close
  • Plumbing

    Water supply

    May 2, 2025 · Apt BLDG

    Close
  • Door/window

    Door

    Feb 20, 2025 · Apt 5D

    Close

Sales history

No recorded sales in our data

Sales come from the NYC Department of Finance rolling sales file.

Building details

Building type
Elevator apartment building (D1)
Year built
1939
Floors
6
Residential units
37
Building area
32,175 ft²
Lot area
6,319 ft²
Zoning
R7-1
Community board
205
Council district
15
Block / lot
3149 / 118
Assessed value
$1,041,750
Landmark / historic district
No

HPD registration #208339, last renewed Sep 4, 2025.

Questions about 253 East 181 Street

Who owns 253 East 181 Street?

The owner of record in NYC Department of City Planning PLUTO data is 181 Ventures LLC.

Does 253 East 181 Street have violations?

Yes. NYC HPD has recorded 661 housing violations at this property.

Is 253 East 181 Street rent stabilized?

NYC Department of Finance tax bills listed 38 rent-stabilized units here in 2024 (about 100% of its 37 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.

When was 253 East 181 Street built?

City records list 1939 as the year it was built.

How many apartments are in 253 East 181 Street?

It has 37 residential units.

Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.