921 East 180 Street
Bronx, NY 10460BBL 2-03128-0001Map
Owner of record: Daly 180 Housing Dev. Fund Corporation
921 East 180 Street is an elevator apartment building built in 1997 in Bronx, 10460. It has 84 residential units across 7 floors. The owner of record is Daly 180 Housing Dev. Fund Corporation. HPD has recorded 159 housing violations here, most recently on June 25, 2026. 10 of the 50 most recent violations are still open. City tax records listed 84 rent-stabilized apartments here in 2024.
- HPD violations
- 159
- DOB violations
- 44
- ECB violations
- 11
- HPD complaints
- 272
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 159
- BHazardous
Properly repair or replace the broken or defective mortice door lock at door in the entrance located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
M/d law abate the nuisance consisting of vinyl floor tiles lifting creating a trip hazard in the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the leaky and/or defective water supply pipe at sink base cabinet ( cold line ) in the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective lower sash glass cracked in the 3rd room from north located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective counter top at south base cabinet in the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective upper cabinet at north and south wall in the kitchen located at apt 4f, 4th story, 2nd apartment from east at south
Jun 25, 2026 · Apt 4F
Open — Nov sent out - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a wood wedge holding the vestibule door open , 1st story
Jun 2, 2022
Closed — Violation dismissed - CImmediately hazardous
Remove device preventing door from being self-closing consisting of a wood wedge holding the entrance door to the building open , 1st story
Jun 2, 2022
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Properly repair the broken or defective intercom and return buzzer system from building entrance to apt 3g located at apt 3g, 3rd story, 3rd apartment from east at south
Jun 2, 2022 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Replace with new the missing vinyl cove baseboard moulding at the east wall in the private hallway located at apt 6e, 6th story, 1st apartment from south at west
Nov 2, 2020 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). (defective) located at apt 6e, 6th story, 1st apartment from south at west
Nov 2, 2020 · Apt 6E
Closed — Violation dismissed - BHazardous
Replace with new the missing metal covers at baseboard radiators thru-out in the entire apartment located at apt 6e, 6th story, 1st apartment from south at west
Nov 2, 2020 · Apt 6E
Closed — Violation dismissed - BHazardous
Replace with new the missing electric wall outlets covers thru-out in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
Nov 2, 2020 · Apt 3G
Closed — Violation dismissed - BHazardous
Replace with new the missing metal covers at baseboard radiators thru-out in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
Nov 2, 2020 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department the ceilings & walls thru-out in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
Nov 2, 2020 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector (defective) located at apt 3g, 3rd story, 3rd apartment from east at south
Nov 2, 2020 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). (defective) located at apt 3g, 3rd story, 3rd apartment from east at south
Nov 2, 2020 · Apt 3G
Closed — Violation dismissed - CImmediately hazardous
Arrange and make self-closing the doors ,, in the entrance located at apt 3g, 3rd story, 3rd apartment from east at south
Nov 2, 2020 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector (defective) located at apt 6e, 6th story, 1st apartment from south at west
Nov 2, 2020 · Apt 6E
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the private hallway located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls in the 4th room from east located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... at ceiling approx 3 sq. ft in the 4th room from east located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - BHazardous
Replace with new the broken or defective wood door in the bathroom located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - CImmediately hazardous
Arrange and make self-closing the doors (defective hinges) in the entrance located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - BHazardous
Replace with new the broken or defective wood door in the 3rd room from east located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - ANon-hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 2nd room from east located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - BHazardous
Replace with new the broken or defective wood door in the 2nd room from east located at apt 6e, 6th story, 1st apartment from south at west
Sep 9, 2020 · Apt 6E
Closed — Violation closed - BHazardous
Abate the infestation consisting of vermin ants in the entire apartment located at apt 4j, 4th story, 6th apartment from south at west
Sep 9, 2020 · Apt 4J
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department public hall west wall , 3rd story
Mar 21, 2020
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective fire retardant material at public hall west wall , 3rd story
Mar 21, 2020
Closed — Violation dismissed - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
Jul 3, 2019 · Apt 3G
Open — Not complied with - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
Jul 3, 2019 · Apt 3G
Closed — Violation closed - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling (approx 10 sq. ft.) in the bathroom located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Open — Defect letter issued - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the 2nd room from north located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the foyer located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the kitchen located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchenette located at apt 3g, 3rd story, 3rd apartment from east at south
Apr 22, 2019 · Apt 3G
Closed — Violation dismissed - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected
Jul 15, 2018
Closed — Violation dismissed - ANon-hazardous
Post and maintain a street number on the front of the dwelling plainly visible from the sidewalk.
Jul 15, 2018
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective door in the 2nd room from north at east located at apt 5c, 5th story, 3rd apartment from west at north
Mar 19, 2018 · Apt 5C
Closed — Violation dismissed - BHazardous
Replace with new the missing door knob in the 2nd room from north at east located at apt 5c, 5th story, 3rd apartment from west at north
Mar 19, 2018 · Apt 5C
Closed — Violation dismissed - CImmediately hazardous
Install the missing or repair/replace the defective window guard(s) in accordance with the specifications of the new york city health code section 24 rcny chapter 12. wg to install = 0; wg to replace = 0; wg to repair = 2; windows missing one-way screws in the entire apartment located at apt 5c, 5th story, 3rd apartment from west at north
Mar 19, 2018 · Apt 5C
Closed — Violation dismissed - BHazardous
Replace with new the broken or defective door in the 1st room from north at east located at apt 5c, 5th story, 3rd apartment from west at north
Mar 19, 2018 · Apt 5C
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall beneath sink in the kitchen located at apt 5c, 5th story, 3rd apartment from west at north
Mar 19, 2018 · Apt 5C
Closed — Violation dismissed
DOB building violations · 44
- Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2024 external low pressure inspection
Nov 14, 2025
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2021 external low pressure inspection
Jun 30, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued-failure to file 2022 external low pressure inspection
Apr 25, 2023
Dob violation - dismissed
Show 34 more ↓
- Failure to post energy grade/score none
Failure to display energy efficiency score and energy efficiency grade as per adcode sec. 28-309.12.3
Dec 1, 2021
Dob violation - dismissed - Elevator affirmation of correction elevatorrequired
Vio issued to elevator - fail to correct defects on 2017 cat 1 insp/tst tst
Sep 6, 2019
Dob violation - dismissed - Failure to submit eer none
Failure to submit an eer per ad. code sec. 28-308.4 in 2018
Mar 18, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - dismissed - Facade safety program facade required
Fisp-facade safety program facade required
Mar 15, 2018
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Dec 15, 2016
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 16, 2015
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2014
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 17, 2014
Dob violation - resolved - No report and / or late filing (facade) facade required
Failed to file fisp cycle 7b technical report by 08/21/2012
Aug 30, 2013
Dob violation - dismissed - Facade facade optional
Cycle 7 unsafe report filed
Feb 19, 2013
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 15, 2012
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 16, 2011
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2010
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 20, 2008
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Jul 26, 2007
Dob violation - resolved - Elevator elevatorrequired
E-elevator elevatorrequired
Mar 30, 2005
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Nov 19, 2004
Dob violation - dismissed - Elevator elevatorrequired
E-elevator elevatorrequired
Feb 25, 2004
Dob violation - resolved - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Elevator elevatoroptional
Ll1081-local law 10/81 - elevator elevatoroptional
Jan 20, 1999
Dob violation - dismissed
ECB violations · 11
- Class - 1
Responding to a 311 elevator complaint, one of two elevators is found to be out of service, this car service all floors, make it has to be a class 1 violation, remedy; repair then notify the nycdob, of car rest
Sep 19, 2025 · Penalty $1,280
Resolve - Class - 1
Cease use items: 1) inoperative zone lock restrictor. 2) worn/misaligned left brake pads; gaps at top and bottom. 125% brake test and plus sealing and tagging of adjustments as per code is required for reinspec
May 13, 2024 · Penalty $1,250
Resolve - Class - 1
Failure to provide adequate protection for pedestrians.at time of inspection observed c-hook suspended scaffold attached to building parapetwall at exposure #1&missing inadequate sidewalk shed in order to prote
Oct 24, 2019 · Penalty $12,500
Resolve - Class - 2
Failur eto maintain exterior bldg facade & appurtenances.west elevation exp#2, observed step cracks/cracks @masonry brick parapet wall @rooflevel.east elevation exp#4,observedd cracks @masonry brick roof parape
Jul 9, 2018 · Penalty $1,250
Resolve - Class - 2
B254,36. 36-found teledyne laar gas boiler model #pw1430iw09 btu 1,430,000 not registered with this dept as per dob records.
Jun 14, 2018 · Penalty $625
Resolve - Class - 2
B254, 36. 35-found teledyne larr gas boiler model pn14305009 btu1,430,000 not registered with this dept as per dob records.
Jun 14, 2018 · Penalty $625
Resolve - Class - 1
Failure to take provide safety measure,such as sidewalk shed's,fence,etc. where require to protect & secure public safety from documented unsafe facade as per 1rcny 103-04. facade technical report file"unsafe"
Mar 16, 2018 · Penalty $10,000
Resolve - Class - 2
Partial swo issued for facade work pursuant 28-207.2 and posted on premises. work w/o permit. noted: at time of inspection facade permit is expired on 4/13/14. job site is active. men working on suspended scaff
Aug 8, 2014
Resolve - Class - 2
Failed to obtain a temporary construction permit prior to inspection of sidewalk shed. noted:upon inspection sidewalk shed in place @exp1 and exp2 with an expired permit. rmdy: comply w/code/obtain permit.
Feb 28, 2014
Resolve - Class - 2
17h11,39o02,61t07,67x10,68m07,73o02,74o02,81m07.(17h11)replace hoistway door gibbs where necessary.(61t07)provide company sticker for line switch box.(67x10)repair communication in car(telephone).
Jun 14, 2011 · Penalty $500
Resolve
Show 1 more ↓
- Class - 2
35q03,39o02,61t07,67x10,68m07,73o02,74o02,81m07.(35q03)install cover for electrical box top of car.(61t07)provide company sticker for main line switch box.(67x10)repair communication in car(telephone).
Jun 14, 2011 · Penalty $500
Resolve
Complaints
- Plumbing
Water supply
Sep 1, 2026 · Apt 6D
Close - Plumbing
Water supply
Aug 31, 2026 · Apt 6
Close - General
Cabinet
Jun 17, 2026 · Apt 4F
Close - Paint/plaster
Ceiling
Jun 17, 2026 · Apt 4F
Close - Door/window
Window frame
Jun 17, 2026 · Apt 4F
Close - Appliance
Refrigerator
Jun 17, 2026 · Apt 4F
Close - Door/window
Door
Mar 25, 2026 · Apt 4F
Close - General
Cabinet
Mar 20, 2026 · Apt 4F
Close - Paint/plaster
Cabinet
Mar 19, 2026 · Apt 4F
Close - Plumbing
Toilet
Mar 19, 2026 · Apt 4F
Close
Show 40 more ↓
- Door/window
Window frame
Mar 19, 2026 · Apt 4F
Close - Plumbing
Bathtub/shower
Mar 19, 2026 · Apt 4F
Close - Door/window
Door
Mar 19, 2026 · Apt 4F
Close - Water leak
Heavy flow
Mar 13, 2024 · Apt 6D
Close - Unsanitary condition
Pests
Mar 13, 2024 · Apt 6D
Close - Unsanitary condition
Pests
Mar 13, 2024 · Apt 6D
Close - Heat/hot water
Apartment only
Dec 25, 2022 · Apt 2H
Close - Plumbing
Radiator
Dec 8, 2021 · Apt 5I
Close - Safety
Smoke detector
Dec 8, 2021 · Apt 5I
Close - Appliance
Refrigerator
Dec 8, 2021 · Apt 5I
Close - Appliance
Electric/gas range
Dec 8, 2021 · Apt 5I
Close - Plumbing
Radiator
Nov 19, 2021 · Apt 5I
Close - Safety
Smoke detector
Nov 19, 2021 · Apt 5I
Close - Appliance
Refrigerator
Nov 19, 2021 · Apt 5I
Close - Appliance
Electric/gas range
Nov 19, 2021 · Apt 5I
Close - Safety
Smoke detector
Oct 30, 2021 · Apt 5I
Close - Heat/hot water
Entire building
Jul 14, 2021 · Apt 5L
Close - Appliance
Refrigerator
Jul 7, 2021 · Apt 5C
Close - Heat/hot water
Entire building
Feb 1, 2021 · Apt 7G
Close - Heat/hot water
Entire building
Dec 18, 2020 · Apt 6E
Close - Door/window
Door
Nov 11, 2020 · Apt 4I
Close - General
Bell/buzzer/intercom
Nov 11, 2020 · Apt 4I
Close - Unsanitary condition
Pests
Nov 11, 2020 · Apt 4H
Close - Unsanitary condition
Mold
Nov 11, 2020 · Apt 4H
Close - Unsanitary condition
Pests
Sep 5, 2020 · Apt 4J
Close - Paint/plaster
Ceiling
Sep 4, 2020 · Apt 6E
Close - Paint/plaster
Ceiling
Sep 4, 2020 · Apt 6E
Close - Plumbing
Bathtub/shower
Sep 4, 2020 · Apt 6E
Close - Water leak
Heavy flow
Aug 9, 2020 · Apt 7K
Close - Plumbing
Bathtub/shower
Jul 2, 2020 · Apt 3C
Close - Unsanitary condition
Garbage/recycling storage
Mar 19, 2020 · Apt BLDG
Close - Appliance
Refrigerator
Aug 24, 2019 · Apt 6E
Close - Unsanitary condition
Garbage/recycling storage
Apr 23, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 23, 2019 · Apt 7M
Close - Heat/hot water
Apartment only
Mar 23, 2019 · Apt 4J
Close - Heat/hot water
Entire building
Mar 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 22, 2019 · Apt BLDG
Close - Heat/hot water
Entire building
Mar 21, 2019 · Apt 7I
Close - Heat/hot water
Apartment only
Jan 25, 2019 · Apt 4D
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D7)
- Year built
- 1997
- Floors
- 7
- Residential units
- 84
- Building area
- 98,141 ft²
- Lot area
- 28,100 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3128 / 1
- Assessed value
- $2,931,750
- Landmark / historic district
- No
HPD registration #223222, last renewed Mar 26, 2026.
Questions about 921 East 180 Street
Who owns 921 East 180 Street?
The owner of record in NYC Department of City Planning PLUTO data is Daly 180 Housing Dev. Fund Corporation.
Does 921 East 180 Street have violations?
Yes. NYC HPD has recorded 159 housing violations at this property.
Is 921 East 180 Street rent stabilized?
NYC Department of Finance tax bills listed 84 rent-stabilized units here in 2024 (about 100% of its 84 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 921 East 180 Street built?
City records list 1997 as the year it was built.
How many apartments are in 921 East 180 Street?
It has 84 residential units and 88 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.