724 East 187 Street
Bronx, NY 10458BBL 2-03102-0029Map
Owner of record: Tsjl Realty Corp
724 East 187 Street is a walk-up apartment building built in 1927 in Bronx, 10458. It has 36 residential units across 5 floors. The owner of record is Tsjl Realty Corp. HPD has recorded 356 housing violations here, most recently on June 16, 2026. 7 of the 50 most recent violations are still open. City tax records listed 35 rent-stabilized apartments here in 2024.
- HPD violations
- 356
- DOB violations
- 11
- ECB violations
- 2
- HPD complaints
- 331
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 356
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling and west wall in the 2nd room from north located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
Repair the flushing apparatus and maintain same so as to flush effectively the water closet .. in the bathroom located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at north wall in the bathroom located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles at water closet in the bathroom located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
And dept. rules and regulations. remove the encumbrance obstructing egress from fire escapes flower pots at north exterior wall at fire escape, 5th story
Jun 16, 2026
Closed — Violation closed - ANon-hazardous
Reset, so as to secure a proper and tight connection, the water closet bowl .. in the bathroom located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - ANon-hazardous
Trace and repair the source and abate the visible mold condition... less than 10 sqft at ceiling in the bathroom located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 9, 3rd story, 1st apartment from south at west
Jun 16, 2026 · Apt 9
Closed — Violation dismissed
Show 40 more ↓
- CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective latch at door in the entrance located at apt apt6, 2nd story, 1st apartment from east at south
May 29, 2026 · Apt APT6
Closed — Violation closed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at all walls and ceiling in the 3rd room from north located at apt apt6, 2nd story, 1st apartment from east at south
May 29, 2026 · Apt APT6
Closed — Violation closed - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt apt6, 2nd story, 1st apartment from east at south
May 29, 2026 · Apt APT6
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective latch and its assembly at door in the entrance located at apt apt6, 2nd story, 1st apartment from east at south
May 29, 2026 · Apt APT6
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the private hallway located at apt 12, 4th story, 1st apartment from south at west
Mar 12, 2026 · Apt 12
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket at refrigerator door, in the kitchen located at apt 12, 4th story, 1st apartment from south at west
Mar 12, 2026 · Apt 12
Closed — Violation dismissed - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor .. at public hall, 1st story
Mar 12, 2026
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 30, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 6heati, 2nd story, 1st apartment from east at south
Jan 30, 2026 · Apt 6HEATI
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 6heati, 2nd story, 1st apartment from east at south
Jan 30, 2026 · Apt 6HEATI
Closed — Violation closed - ANon-hazardous
Replace with new the defective flush pipe of water closet at water closet in the bathroom located at apt 15, 5th story, 2nd apartment from west at north
Aug 12, 2025 · Apt 15
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective electrical outletat north and south walls in the kitchen located at apt 15, 5th story, 2nd apartment from west at north
Aug 12, 2025 · Apt 15
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 4th story, 1st apartment from west at north
Jan 22, 2025 · Apt 4
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system doors locked at boiler room
Jan 22, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 1st apartment from west at north
Jan 3, 2025 · Apt 4
Open — Nov sent out - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 3, 2025
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Jan 3, 2025 · Apt 2
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing frame at public hall, 1st story
Dec 30, 2024
Closed — Violation dismissed - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building.
Dec 24, 2024
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Dec 17, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing in the entire apartment located at apt 2, 1st story, 1st apartment from east at south
Dec 17, 2024 · Apt 2
Closed — Violation dismissed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechical heavy duty lock and latch set at door from street to vestibule at 1st story public hall
Feb 12, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an unacceptable electromagnetic locking device installed at door from street to vestibule at 1st story public hall
Feb 12, 2024
Closed — Violation closed - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective [hinge] door at street to vestibule at 1st story public hall
Feb 12, 2024
Closed — Violation closed - CImmediately hazardous
Properly repair or replace the broken or defective cracked glass at window at west wall at 2nd story intermediate landing
Feb 12, 2024
Closed — Violation closed - BHazardous
Provide security in the event of a power outage by means of an acceptable mechanicle heavy duty lock and latch set at building front entrance door
Jan 21, 2024
Closed — Violation dismissed - CImmediately hazardous
Remove the illegal fastening consisting of an a unacceptable eletromagnetic locking device installed at building front entrance door
Jan 21, 2024
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water tempture exceeding 130 degrees at plumbing fixtures in kitchen and bathroom in the entire apartment located at apt 9, 3rd story, 1st apartment from south at west
Jan 21, 2024 · Apt 9
Closed — Violation closed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 21, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 9, 3rd story, 1st apartment from south at west
Jan 21, 2024 · Apt 9
Closed — Violation dismissed - CImmediately hazardous
M/d law abate the nuisance consisting of hot water tempture exceeding 130 degrees at plumbing fixtures in kitchen and bathroom in the entire apartment located at apt 4, 2nd story, 1st apartment from west at north
Jan 21, 2024 · Apt 4
Closed — Violation dismissed - CImmediately hazardous
Provide ready access to buildings heating system door locked at boiler room
Jan 21, 2024
Closed — Violation dismissed - CImmediately hazardous
Provide an adequate supply of heat for the apartment in the entire apartment located at apt 4, 2nd story, 1st apartment from west at north
Jan 21, 2024 · Apt 4
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 12, 4th story, 1st apartment from south at west
Sep 1, 2023 · Apt 12
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at south and west walls in the bathroom located at apt 15, 5th story, 2nd apartment from south at west
Aug 25, 2023 · Apt 15
Closed — Violation dismissed - BHazardous
Repair or replace the smoke detector missing located at apt 15, 5th story, 2nd apartment from south at west
Aug 25, 2023 · Apt 15
Closed — Violation dismissed - BHazardous
Repair or replace the carbon monoxide detecting device(s). missing located at apt 15, 5th story, 2nd apartment from south at west
Aug 25, 2023 · Apt 15
Closed — Violation dismissed - BHazardous
Repair the leaky and/or defective faucets at wash basin in the bathroom located at apt 15, 5th story, 2nd apartment from south at west
Aug 25, 2023 · Apt 15
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective entrance door in the 1st room from north located at apt 15, 5th story, 2nd apartment from south at west
Aug 25, 2023 · Apt 15
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective glass pane at upper sash window in the 1st room from north located at apt 15, 5th story, 2nd apartment from south at west
Aug 25, 2023 · Apt 15
Open — Nov sent out
DOB building violations · 11
- Low pressure boiler boiler required
Violation issued-failure to file 2018 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2019 external low pressure inspection
Jun 20, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2017 inspection report
Nov 8, 2019
Dob violation - dismissed - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2016 inspection report
Apr 6, 2018
Dob violation - active - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Dec 28, 2016
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 31, 2005
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 13, 2004
Dob violation - dismissed
Show 1 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed
ECB violations · 2
- Class - 1
Work w/o permit. on 10/6/16 at 11:40am in the basement apt i observed gas work done,that supplies the basement apts stove. utility locked the service to the stove due to not having its own gas meter,it was bein
Oct 6, 2016 · Penalty $1,600
Resolve - Non-hazardous
19a/.
Apr 11, 2001 · Penalty $180
Active
Complaints
- Water leak
Slow leak
Jun 10, 2026 · Apt 9
Close - Flooring/stairs
Floor
Jun 10, 2026 · Apt 9
Close - Plumbing
Toilet
Jun 10, 2026 · Apt 9
Close - Door/window
Door
Apr 21, 2026 · Apt APT6
Close - Appliance
Electric/gas range
Apr 21, 2026 · Apt APT6
Close - Paint/plaster
Ceiling
Apr 21, 2026 · Apt APT6
Close - Heat/hot water
Apartment only
Jan 26, 2026 · Apt 6HEATI
Close - Heat/hot water
Entire building
Jan 23, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 16, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 4, 2026 · Apt BLDG
Close
Show 40 more ↓
- Heat/hot water
Entire building
Jan 2, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Nov 17, 2025 · Apt BLDG
Close - Paint/plaster
Wall
Jul 17, 2025 · Apt 15
Close - Plumbing
Toilet
Jul 17, 2025 · Apt 15
Close - Safety
Smoke detector
Jul 17, 2025 · Apt 15
Close - Flooring/stairs
Floor
Jul 17, 2025 · Apt 15
Close - Flooring/stairs
Floor
Jul 17, 2025 · Apt 15
Close - Flooring/stairs
Floor
Jul 17, 2025 · Apt 15
Close - Door/window
Window frame
Jul 17, 2025 · Apt 15
Close - Heat/hot water
Entire building
Feb 19, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Feb 18, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 23, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 21, 2025 · Apt 4
Close - Heat/hot water
Entire building
Jan 2, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 30, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 28, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 25, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 22, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 16, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 14, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 9, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 6, 2024 · Apt BLDG
Close - Heat/hot water
Apartment only
Nov 29, 2024 · Apt 16
Close - Heat/hot water
Entire building
Jan 18, 2024 · Apt 4
Close - Heat/hot water
Entire building
Nov 22, 2023 · Apt 11
Close - Heat/hot water
Entire building
Jun 5, 2023 · Apt BLDG
Close - Paint/plaster
Ceiling
Apr 12, 2023 · Apt 14
Close - Plumbing
Basin/sink
Apr 12, 2023 · Apt 14
Close - Plumbing
Bathtub/shower
Apr 12, 2023 · Apt 14
Close - Flooring/stairs
Floor
Apr 12, 2023 · Apt 14
Close - Plumbing
Bathtub/shower
Apr 5, 2023 · Apt 13
Close - Water leak
Heavy flow
Apr 5, 2023 · Apt 13
Close - Flooring/stairs
Floor
Feb 21, 2023 · Apt 5
Close - Water leak
Damp spot
Feb 21, 2023 · Apt 5
Close - Flooring/stairs
Floor
Feb 21, 2023 · Apt 5
Close - Unsanitary condition
Mold
Feb 21, 2023 · Apt 5
Close - Paint/plaster
Wall
Feb 21, 2023 · Apt 5
Close - Plumbing
Bathtub/shower
Feb 21, 2023 · Apt 5
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C7)
- Year built
- 1927
- Floors
- 5
- Residential units
- 36
- Building area
- 28,000 ft²
- Lot area
- 7,000 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3102 / 29
- Assessed value
- $798,750
- Landmark / historic district
- No
HPD registration #214554, last renewed Jul 24, 2025.
Questions about 724 East 187 Street
Who owns 724 East 187 Street?
The owner of record in NYC Department of City Planning PLUTO data is Tsjl Realty Corp.
Does 724 East 187 Street have violations?
Yes. NYC HPD has recorded 356 housing violations at this property.
Is 724 East 187 Street rent stabilized?
NYC Department of Finance tax bills listed 35 rent-stabilized units here in 2024 (about 97% of its 36 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 724 East 187 Street built?
City records list 1927 as the year it was built.
How many apartments are in 724 East 187 Street?
It has 36 residential units and 41 units in total.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.