2120 Crotona Avenue
Bronx, NY 10457BBL 2-03096-0052Map
Owner of record: Bronx 2120 Crotona Avenue L.p.
2120 Crotona Avenue is a walk-up apartment building built in 1914 in Bronx, 10457. It has 35 residential units across 5 floors. The owner of record is Bronx 2120 Crotona Avenue L.p.. HPD has recorded 1,273 housing violations here, most recently on October 20, 2026. 50 of the 50 most recent violations are still open. City tax records listed 32 rent-stabilized apartments here in 2018.
- HPD violations
- 1,273
- DOB violations
- 7
- ECB violations
- 26
- HPD complaints
- 1,288
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 1,273
- BHazardous
Properly repair or replace the broken or defective window latch in the 4th room from east located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations defective in the entire apartment located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules defective in the entire apartment located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Repair the leaky and/or defective faucets at bathtub in the bathroom located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - ANon-hazardous
Properly repair or replace the broken or defective recaulk the base of bath tub in the bathroom located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective porcelain glaze at bathtub in the bathroom located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wash basin reset on wood base cabinet in the bathroom located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at stove top in the entire apartment located at apt 15, 3rd story, 1st apartment from west at north
Oct 20, 2026 · Apt 15
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 8, 2nd story, 2nd apartment from south at west
Oct 2, 2026 · Apt 8
Open — Nov sent out - BHazardous
Provide an adequate supply of gas to the fixtures at gas range in the kitchen located at apt 8, 2nd story, 1st apartment from west at north
Sep 22, 2026 · Apt 8
Open — Nov sent out
Show 40 more ↓
- CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the entire apartment located at apt 11, 2nd story, 1st apartment from east at south
Sep 11, 2026 · Apt 11
Open — Nov sent out - BHazardous
Provide sufficient, proper and separate metal receptacles for the deposit of garbage, rubbish and other waste material and arrange for collection and disposal of such material.
Sep 11, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the entire apartment located at apt 15, 3rd story, 1st apartment from south at west
Sep 11, 2026 · Apt 15
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective baseboard of base cabinet in the kitchen located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Replace the broken or defective bathtub in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Provide adequate supply of hot water for the fixtures wash basin in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... at ceiling and walls in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Notice of issuance sent to tenant - BHazardous
Replace with new the missing escutcheon plate at riser pipe in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color ceiling and west wall in the kitchen located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the kitchen located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - ANon-hazardous
And dept. rules and regulations. scrape and remove rust scales and paint with 2 coats of paint all stories, all balconies, and all components at building front at first and second stack at fire escape
Sep 2, 2026
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 1st room from east located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Properly secure the loose radiator in the 1st room from east located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational smoke detecting device, installed in accordance with department of buildings rules and regulations missing in the entire apartment located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Repair, replace or provide an approved and operational carbon monoxide detecting device, installed in accordance with applicable law and rules in the entire apartment located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the entire apartment located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Remove all encumbrances consisting of range in public hall at public hall, 1st story
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Notice of issuance sent to tenant - CImmediately hazardous
Abate the infestation consisting of mice in the entire apartment located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Notice of issuance sent to tenant - BHazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the garbage bags and furniture at east court yard
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Properly secure the loose metal tread, 8th from bottom, at stairs to south court yard
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures entire building
Sep 2, 2026
Open — Nov sent out - CImmediately hazardous
M/d law abate the nuisance consisting of lock on door leading to fire escape in the 1st room from east located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the 2nd room from east at north located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the bathroom located at apt 17, 3rd story, 3rd apartment from west at north
Sep 2, 2026 · Apt 17
Open — Nov sent out - CImmediately hazardous
Provide an adequate supply of gas to the fixtures range in the entire apartment located at apt 16, 3rd story, 2nd apartment from west at north
Sep 2, 2026 · Apt 16
Open — Nov sent out - BHazardous
Fire escape defective. adjust the dropladder so that it will slide easily in the guide rods second story balcony south at east side of building at fire escape, 2nd story
Jul 22, 2026
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the foyer located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - CImmediately hazardous
Correct the lead-based paint hazard - paint that tested positive for lead content and that is peeling or on a deteriorated subsurface - using work practices set forth in 28 rcny §11-06(b)(2) north wall, south wall, east wall in the kitchen located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the west wall in the kitchen located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective wood floor in the kitchen located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - BHazardous
Trace and repair the source and abate the visible mold condition... more than 1o square feet at the south wall and the ceiling in the bathroom located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department all peeling paint surfaces in the 2nd room from east, the bathroom , the foyer located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair or replace the broken or defective spring balances at upper sash of window in the bathroom located at apt 9, 2nd story, 1st apartment from west at north
Jun 23, 2026 · Apt 9
Open — Nov sent out - CImmediately hazardous
Abate the infestation consisting of roaches in the entire apartment located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Notice of issuance sent to tenant - BHazardous
Repair the broken or defective connection wasteline at the wash basin in the bathroom located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at the east wall in the bathroom located at apt 6, 1st story, 3rd apartment from north at east
Jun 23, 2026 · Apt 6
Open — Nov sent out
DOB building violations · 7
- Construction other optional
Structure rendered non-compliant. at time of inspection observed at exposure#3 vertical crack at 1st floor traveling up to 5th floor with separation. structural stability potentially compromised.
Jun 11, 2026
Dob violation - active - Construction other optional
At time of inspection observed cracks, missing mortar on exterior of exp 1 near fire escape at 3rd & 4th floor. also cracks, missing mortar at exp 3 above 1st floor window. and at exp 4 exit passageway observed shear crack approximately half inch.
May 29, 2025
Dob violation - active - Construction other optional
Structure rendered non compliant-at time of inspction observed damaged and deterirated angle irons below stairs and landings at 5th , 3rd and 2nd sty. also cracked marble landing at 4th story . also observed cra cks at exp. #2,3 & 4. missing bricks at 5th story level at exp.#2
May 31, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2014 inspection report
Oct 1, 2015
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 26
- Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed structural conditions at exposure 3 and 4, floors 2-5 at windows running vertical cracks. also observed at all exposures and
Jul 30, 2026 · Penalty $6,280
Active - Class - 2
- failure to maintain building in code-compliant manner. at time of inspection observed at rear yard large pile of debris black bags & construction debris, at interior hallways landings 3,4 & bulkhead miscellan
Jul 30, 2026 · Penalty $1,280
Active - Class - 1
Unlawful acts. failure to comply with commissioner's order. as per compliant# # 2442900, violation# vio26-01542, 6/11/2026, request for engineers report not in compliance. owner had within 10 days addressing al
Jul 30, 2026 · Penalty $2,530
Active - Class - 1
Failure to maintain building walls/appurtenances. at time of inspection observed at exposure#3 severe vertical crack with separation at 1st traveling up to 5th floor. also severe spalling to masonry brick work.
Jun 11, 2026 · Penalty $5,030
Active - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection - key locking device was observed installed at rm door leading to fire escape window in apts 28 & 35: obstructing emergency eg
Apr 23, 2026 · Penalty $12,500
Active - Class - 1
Contrary to dob/official records which indicates 28 class 'a' apts: at time of inspection - apts 28 & 35 were observed created & occupied as transient occupancy sro's: each apt observed with key locks at bdrm e
Apr 23, 2026 · Penalty $25,000
Active - Class - 1
Removed or defaced a written posted vacate order. noted: at time of inspection - vacate sticker posted at building front entry door was observed removed., comply with code
Apr 23, 2026 · Penalty $25,000
Active - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. noted: at time of inspection - contrary to active vacate order issued 4/10/2024 - 4th flr apt 28 was observed occupied by male & female occupan
Apr 23, 2026 · Penalty $25,000
Active - Class - 1
At the time of inspection, the egress passageway on the exposure 2 side of the five-story building was observed to be partially obstructed. the metal gate door was chained and padlocked, creating an unsafe cond
Nov 26, 2025 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code-compliant manner. at time of inspection observed cracks, missing mortar on exp 1 near fire escape at 3rd & 4th floor. also cracks, missing mortar at exp 3 above 1st floor wi
May 29, 2025 · Penalty $12,500
Active
Show 16 more ↓
- Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4. noted at time of inspection apartment #28 on the 4th floors under. vacateorder #x98/2024 continues to be occupied by a family of 3. previous vi
May 12, 2025 · Penalty $25,000
Active - Class - 2
I found a federal fst-60 steam boiler with missing dawgs and nuts/boiler door not seal propely/missing body drain on safety valve/water pipe not supported/ correct all violating condition/submit certificate of
Mar 19, 2025 · Penalty $6,250
Active - Class - 1
Summons issued for failure to maintain due to multiple cracks in the facade between the 2nd and 3rd floors of the facade., repair and/replace
Dec 16, 2024 · Penalty $6,250
Active - Class - 1
Failure to obey a vacate order from the commissioner per 28-207.4.noted at time of inspection apartment#28 on the 4th floor under vacate order#x98/2024 was occupied by 1 mode.rem:comply with vacate order.
Dec 9, 2024 · Penalty $24,000
Active - Class - 2
A8 failure to maintain building in a code compliant manner. premises is a five story m/d in which front exterior walls at exposures 1,2,3,4,have cracks in various loctaions, repair and/or replace
Aug 4, 2024 · Penalty $3,125
Active - Class - 1
At time of inspection observed damaged and deteriorating angle irons below stair treds and landings at 5th, 3rd and 2nd stories. also cracked marble landing at 4th sty. remedy: repair/replace.
May 31, 2024 · Penalty $6,250
Active - Class - 1
At time of inspection observed vertical crack, at multiple locations of exp. 2, 3 and 4. also missing bricks at 5th sty. height of exp. 2. remedy: maintain exterior building wall.
May 31, 2024 · Penalty $12,500
Active - Class - 2
Failure to maintain building walls. observed at exposure#1,2 and 3 step cracks in numerous locations near fire escape., maintain exterior building wall
May 30, 2024 · Penalty $6,250
Active - Class - 1
Contrary to dob/official records which indicates apt 28 as a class 'a' apt: at time of inspection - apt was observed converted & occupied as 4 sro's with obstructed emergency egress and no natural light & venti
Apr 10, 2024 · Penalty $12,500
Active - Class - 2
W/o a permit. noted: at 4th flr apt 28 - full height partition walls & swing door erected at living rm to create an addl't bdrm., obtain all permits
Apr 10, 2024 · Penalty $6,250
Active - Class - 1
Failure to maintain building in code compliant manner. noted: at time of inspection - interior common stair window between 3rd & 4th flrs: observed badly broken with shard edges creating a cut hazard; window bo
Apr 10, 2024 · Penalty $3,125
Resolve - Class - 1
Failure to maintain building in code compliant manner: use of prohibited door and/or hardware per bc 1008.1.8; 27-371(j). noted: at time of inspection at apt 28 - key locking device actively used at rm door lea
Apr 10, 2024 · Penalty $1,250
Resolve - Class - 2
In public stairwell, metal landings have separations and rusting of angle irons,also noted stress cracks in stairwell., repair and/or replace
Jan 23, 2024 · Penalty $3,125
Active - Class - 1
Observed rear yard metal fence exit gate locked with padlock and storage debris on fire escape baskets at expo # 02 & 03 and storage motor bike in front of building entrance which partially obstructing emergenc
Jun 15, 2023 · Penalty $1,250
Active - Class - 1
At time of inspection observed plumbing work in progress including floor excavation, plumbing cast iron drain pipes and hardware installation. no dob permit on file., obtain permit; stop all plumbing work at ba
Dec 21, 2022 · Penalty $2,500
Active - Class - 3
At time of inspection observed electronic items televisions stored on 3rd floor public hallway between apt # 19 & 20., repair and or replace
Nov 17, 2022 · Penalty $500
Active
Complaints
- Heat/hot water
Entire building
Oct 20, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 19, 2026 · Apt BLDG
Close - General
Cooking gas
Oct 19, 2026 · Apt BLDG
Close - Plumbing
Water supply
Oct 19, 2026 · Apt BLDG
Close - General
Cooking gas
Oct 19, 2026 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 19, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 17, 2026 · Apt BLDG
Close - Unsanitary condition
Garbage/recycling storage
Oct 15, 2026 · Apt BLDG
Close - General
Cooking gas
Oct 15, 2026 · Apt 15
Close - General
Cooking gas
Oct 15, 2026 · Apt 15
Close
Show 40 more ↓
- Plumbing
Water supply
Oct 15, 2026 · Apt 15
Close - Plumbing
Water supply
Oct 15, 2026 · Apt 15
Close - Paint/plaster
Ceiling
Oct 5, 2026 · Apt 8
Close - Flooring/stairs
Floor
Oct 5, 2026 · Apt 8
Close - Paint/plaster
Wall
Oct 5, 2026 · Apt 8
Close - General
Cooking gas
Oct 5, 2026 · Apt 8
Close - General
Cooking gas
Oct 2, 2026 · Apt 16
Close - General
Cooking gas
Sep 27, 2026 · Apt 16
Close - Appliance
Electric/gas range
Sep 23, 2026 · Apt 16
Close - General
Cooking gas
Sep 17, 2026 · Apt 8
Close - General
Cooking gas
Sep 11, 2026 · Apt 16
Close - Electric
Power outage
Sep 11, 2026 · Apt BLDG
Close - General
Cooking gas
Sep 5, 2026 · Apt 15
Close - Appliance
Electric/gas range
Sep 4, 2026 · Apt 11
Close - Electric
No lighting
Sep 4, 2026 · Apt 11
Close - Unsanitary condition
Garbage/recycling storage
Sep 1, 2026 · Apt 15
Close - General
Cooking gas
Sep 1, 2026 · Apt BLDG
Close - General
Cooking gas
Aug 30, 2026 · Apt BLDG
Close - General
Cooking gas
Aug 28, 2026 · Apt 17
Close - General
Cooking gas
Aug 26, 2026 · Apt 16
Close - Appliance
Electric/gas range
Aug 24, 2026 · Apt 15
Close - General
Cooking gas
Aug 24, 2026 · Apt BLDG
Close - General
Mailbox
Aug 18, 2026 · Apt 16
Close - Electric
No lighting
Aug 18, 2026 · Apt 16
Close - General
Bell/buzzer/intercom
Aug 18, 2026 · Apt 16
Close - Door/window
Door
Jul 30, 2026 · Apt BUILDI
Close - Unsanitary condition
Garbage/recycling storage
Jul 30, 2026 · Apt BUILDI
Close - Electric
No lighting
Jul 30, 2026 · Apt BUILDI
Close - Unsanitary condition
Pests
Jul 30, 2026 · Apt BUILDI
Close - General
Bell/buzzer/intercom
Jul 30, 2026 · Apt BUILDI
Close - General
Bell/buzzer/intercom
Jul 26, 2026 · Apt 16
Close - General
Bell/buzzer/intercom
Jul 25, 2026 · Apt 16
Close - Plumbing
Water supply
Jul 25, 2026 · Apt 16
Close - Water leak
Slow leak
Jun 17, 2026 · Apt 6
Close - Flooring/stairs
Floor
Jun 17, 2026 · Apt 6
Close - Paint/plaster
Ceiling
Jun 17, 2026 · Apt 6
Close - Unsanitary condition
Mold
Jun 17, 2026 · Apt 6
Close - Water leak
Slow leak
Jun 15, 2026 · Apt 6
Close - Paint/plaster
Ceiling
Jun 15, 2026 · Apt 9
Close - Water leak
Damp spot
Jun 15, 2026 · Apt 9
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1914
- Floors
- 5
- Residential units
- 35
- Building area
- 24,540 ft²
- Lot area
- 6,635 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3096 / 52
- Assessed value
- $896,400
- Landmark / historic district
- No
HPD registration #209889, last renewed Aug 24, 2025.
Questions about 2120 Crotona Avenue
Who owns 2120 Crotona Avenue?
The owner of record in NYC Department of City Planning PLUTO data is Bronx 2120 Crotona Avenue L.p..
Does 2120 Crotona Avenue have violations?
Yes. NYC HPD has recorded 1,273 housing violations at this property.
Is 2120 Crotona Avenue rent stabilized?
NYC Department of Finance tax bills listed 32 rent-stabilized units here in 2018 (about 91% of its 35 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2120 Crotona Avenue built?
City records list 1914 as the year it was built.
How many apartments are in 2120 Crotona Avenue?
It has 35 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.