2265 Hughes Avenue
Bronx, NY 10457BBL 2-03071-0055Map
Owner of record: 2265 Realty LLC
2265 Hughes Avenue is an elevator apartment building built in 2015 in Bronx, 10457. It has 16 residential units across 7 floors. The owner of record is 2265 Realty LLC. HPD has recorded 28 housing violations here, most recently on November 5, 2024. 20 of the 28 most recent violations are still open. City tax records listed 16 rent-stabilized apartments here in 2024.
- HPD violations
- 28
- DOB violations
- 3
- ECB violations
- 28
- HPD complaints
- 30
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 28
- BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the private hallway located at apt 6b, 6th story, 2nd apartment from east at south
Nov 5, 2024 · Apt 6B
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
§ 329, m/d law and dept. rules and regs. provide a completed certificate of inspection visits in a proper frame at or near mailboxes, bottom edge of frame between 48-62 inches above floor missing at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Post sign on wall of entrance story bearing name, address including apartment number if any, and telephone number of superintendent, janitor or housekeeper. at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of smoke detector requirements, in a form approved by the commissioner, at or near the mail box missing at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Post a proper notice of carbon monoxide detecting device requirements, in a form approved by the commissioner, in a common area of a class a multiple dwelling near inspection certificate or provide notice to tenants in a private dwelling.
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at west wall at public hall , 1st story
Nov 5, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from north located at apt 6b, 6th story, 2nd apartment from east at south
Nov 5, 2024 · Apt 6B
Open — Nov sent out - BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the 3rd room from north located at apt 6b, 6th story, 2nd apartment from east at south
Nov 5, 2024 · Apt 6B
Open — Nov sent out
Show 18 more ↓
- BHazardous
Properly repair the source and abate the evidence of a water leak at ceiling in the private hallway located at apt 6b, 6th story, 2nd apartment from east at south
Nov 5, 2024 · Apt 6B
Open — Nov sent out - ANon-hazardous
Post a sign indicating hours of collection and method of collection of waste material where dumbwaiter service is not provided. at public hall, 6th story
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Post, in a form approved by the commissioner, and maintain a notice in a common area of the building regarding the procedures that should be followed when a gas leak is suspected at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - ANon-hazardous
Post and maintain a proper notice on wall of the entrance story in english and spanish on the availability of the agencys housing information guide. a sample notice can be found at www.nyc.gov/hpd. at public hall, 1st story
Nov 5, 2024
Open — Nov sent out - BHazardous
Properly repair with similar material the broken or defective fire retardant material at west wall at building vestibule , 1st story
Nov 5, 2024
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the private hallway located at apt 6b, 6th story, 2nd apartment from east at south
Oct 19, 2023 · Apt 6B
Open — Nov sent out - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at the ceiling in the 1st room from north located at apt 6b, 6th story, 2nd apartment from east at south
Oct 19, 2023 · Apt 6B
Open — Nov sent out - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective door at vestibule to 1st story at public hall
Oct 19, 2023
Open — Nov sent out - ANon-hazardous
Post and maintain a proper sign on wall of entrance story showing the registration number assigned by the department and the address of the building. at public hall
Oct 19, 2023
Open — Nov sent out - CImmediately hazardous
Post notice, in form approved by the department, stating the name and location of the person designated by the owner to have key to buildings heating system missing at public hall
Oct 19, 2023
Open — Nov sent out - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Mar 31, 2023
Closed — Violation dismissed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 20, 2021
Closed — Violation dismissed - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Oct 31, 2016
Closed — Violation dismissed - CImmediately hazardous
Properly repair with similar material the broken or defective ceilling and south wall at public hall, 3rd story
Oct 31, 2013
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department paint ceiling and south wall. at public hall, 3rd story
Oct 31, 2013
Closed — Violation closed - CImmediately hazardous
Replace with new the broken or defective window glass lower sash at public hall, 2nd story
Aug 5, 2013
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant ceiling at public hall, 1st story
Aug 5, 2013
Closed — Violation closed - ANon-hazardous
Paint with light colored paint to the satisfaction of this department ceiling at public hall, 1st story
Aug 5, 2013
Closed — Violation closed
DOB building violations · 3
- Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Sep 2, 2020
Dob violation - dismissed - Construction other optional
C-construction other optional
Jun 14, 2017
Vpw*-violation unserved ecb-work without permit-dismissed - Fail to certify class 1 none
Failure to certify correction on immediately hazardous (class 1) ecb violation
Oct 7, 2015
Dob violation - dismissed
ECB violations · 28
- Class - 2
Failure to maintain bldg exterior facade and appurtenances. note: at time of inspection i observed exp #1 east-cracked, spalling cmu by garage entry 1st fl.-exo #4 north-cracked cementitous coating at roof deck
Mar 24, 2026 · Penalty $2,500
Active - Class - 1
Failure to submit the required parking structure initial observation report for an existing parking structure documenting the conditions of psid#x0003759 by the august 1,2024 deadline.to date,the department has
Oct 1, 2024 · Penalty $2,500
Active - Class - 1
Bc 3303.7.2 failure to provide fire extinguishers as per code.at time of my inspection i observed a 7 story active jobsite. the jobsite standpipe was not active as per,vasilios zervoulias,person present onsite
Feb 24, 2020 · Penalty $2,500
Resolve - Class - 1
27-860 failure to extend chimney of smaller building.at the time of myinspection i observed the chimney from the 2 story neighboring property at exposure 4 had not been extended 3 above the taller/jobsite as re
Feb 24, 2020
Resolve - Class - 2
Stair and/or floor identification signs missing at the time of my inspection i observed that there was no floor signs identification signs installed at any of the floor levels, an either of the 2 stairwells at
Feb 24, 2020 · Penalty $312
Resolve - Class - 1
Failure to institute/maintain safety equipment measures or temporary construction-no handrails.at time of my inspection i observed no handrails installed from ground floor up to roof level in any of the stairwe
Feb 24, 2020 · Penalty $2,500
Resolve - Class - 2
Failure to safeguard all persons and property affected by constructionoperations.at time of my inspection i observed a temporary door with nails petruding and door swinging into the pubic which poses a struck b
Feb 24, 2020 · Penalty $5,000
Resolve - Class - 1
Construction superintendent failed to perform duties as per rule.at the time of my inspection i observed work was in progress at 2265 hughesave while there was no cs or competent person(designated)daily log boo
Feb 24, 2020
Resolve - Class - 1
Sidewalk shed where required.at the time of inspection of 7 story building at rood level.construction work in progress.some workers were working on job site .i observed there were no sidewlak shed provided as r
Feb 20, 2019 · Penalty $10,000
Resolve - Class - 1
Handrails-at the time of inspection of a 7 story building at roof level.construction work in progress.some workers working on job site,i observed missing handrails from 1st floor to 7th floor thorughout creatin
Feb 2, 2019
Resolve
Show 18 more ↓
- Class - 1
Bc3314.1 supported scaffold specification at time of inspection observed supported scaffold in place not built to code specifications, 1-noguardrails; 2-planks not tied down; 3-inadequate netting; 4-improper
Jan 23, 2019 · Penalty $2,500
Resolve - Class - 2
Bc3307.1 failure to provide/temporary standpipe light. at the time ofinspection i observed sidewalk shed in place w/o standpipe lightening.rmdy: provide standpipe light.
Jan 23, 2019
Resolve - Class - 2
Bc3301.9.1.1 failure to provide project information panel. as noted: at time of inspection, active site. i observed that there is no project information panel provided at exp #1 (hughes ave side). rem: comply w
Aug 29, 2018
Resolve - Class - 2
Construction super failed to perform duties per code.at time of inspection it was obserced that while under the supervision of william fernandez,he allowed violating conditions to occur at the site.there was a
Jun 22, 2018 · Penalty $2,500
Resolve - Class - 1
Bc28-407.1:welders license reqd.at time of inspection it was observed that aperson was welding on site.when i asked the person if he ahad a license to weld he stated no.none of the persons onsite had a license
Jun 22, 2018
Resolve - Class - 1
No guardrails.note @ time of inspection,of a proposed 7 story @ 6 story phase i observed open permits @ exp 1 & 3 with no guardrails.this creates a potential hazard for personnel below from falling materials.re
Mar 12, 2018 · Penalty $2,500
Resolve - Class - 1
Failure to protect adjoining purption during construction:note @ time of inspection of a i observe that yard and mechanical equipment not protected @ expo 4.i observe concrete evidence in equipment & level.stop
Mar 12, 2018 · Penalty $1,250
Resolve - Class - 1
3301.2.safety measures.note @ time of inspection,of a proposed 7 storynew building @ 6 story phase.i observe there is no overhead for personnal entering & exiting site with work anobr.this creates a potential f
Mar 12, 2018 · Penalty $2,500
Resolve - Class - 1
No guardrails.note @ time of inspection of a proposed 7 story new building @ 6 story phase.i observe no handrails installed @ stairs going from 1st fl to 2nd to 3 to 4 to 5 to 6.this creates a potential fall ha
Mar 12, 2018 · Penalty $2,500
Resolve - Class - 1
Work without permit.note at time of inspection of a proposed 7 story new building at ground floor level active site with cmu block and (resos)installation.no valid new building permit in bis.permit revised
Jun 14, 2017 · Penalty $1,600
Resolve - Class - 1
3307.7 fences:not at time of inspection of a proposed 7 story new building at ground floor with (cru )rebars in progress.i observed that there were missing fence panels at expo 2,3 and 4 failure to maintain
Jun 14, 2017 · Penalty $1,600
Resolve - Class - 2
Job site fence not constructed pursuant to subsection. at time of in spection noted a construction site at foundation stage. during inspection observed that the construction fence was collapsing and missing a
Mar 23, 2017
Resolve - Class - 2
Temp const equipment on site-expired permit.noted:@time of insp permitfor the const fence expired on 12/03/16.rem:renew the permit.
Jan 20, 2017
Resolve - Class - 2
Sec: 3307.7.7. failure to maintain construction fence. note: @ time of insp several panels for construction fence partially reached. nails &screws are sticking out. rem: maintain construction fence in a sound c
Aug 5, 2016 · Penalty $400
Resolve - Class - 2
Sec: 3307.6.4.4. failure to protect vertical beams for sidewalk shed on the driveway. noted: @ time of insp vertical beams for sidewalk shed that installed on driveway are not protected from displacement of id
Aug 5, 2016 · Penalty $800
Resolve - Class - 1
Failure to safeguard all persons & property affected by construction operations.as noted,new bldg being constructed no overhead protection @exp2 adjacent bldg & exp1.construction fence @ site has opening on exp
Jul 6, 2015 · Penalty $2,400
Resolve - Class - 1
Bc2104.6 masonry construction bracing in accordance w/ tms602/aci530.1/asce6section33e,the contractor shall design,provide,& install bracingthat will assure stability of all masonry during construction.as noted
Jul 6, 2015 · Penalty $1,600
Resolve - Class - 2
Project info panel/sidewalk shed parapet panel/const sign not providedor not in compliance w/section.fence viewing panel not provided or notin compliance w/section @ const site.@ time of insp noted that jobsite
Aug 18, 2014
Resolve
Complaints
- Heat/hot water
Entire building
Jul 17, 2025 · Apt 5B
Close - Heat/hot water
Entire building
Jan 22, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Oct 15, 2024 · Apt BLDG
Close - Water leak
Slow leak
Oct 5, 2024 · Apt 6B
Close - Heat/hot water
Entire building
Oct 19, 2023 · Apt BLDG
Close - Heating
Heat related
Oct 26, 2013 · Apt 2
Close - Electric
Electric-supply
Aug 1, 2013 · Apt 2
Close - Heating
Heat related
Mar 6, 2013 · Apt 2
Close - Heating
Heat related
Feb 10, 2013 · Apt 2
Close - Heating
Heat related
Feb 9, 2013 · Apt 2
Close
Show 20 more ↓
- General
Mailbox
Feb 9, 2013 · Apt 2
Close - Electric
Bell-buzzer/intercom
Feb 9, 2013 · Apt 2
Close - Heating
Heat related
Dec 25, 2012 · Apt 2
Close - Heating
Heat related
Nov 30, 2012 · Apt 2
Close - General
Mold
May 22, 2007 · Apt 3
Close - Paint/plaster
Wall
May 22, 2007 · Apt 3
Close - General
Ceramic-tile
May 22, 2007 · Apt 3
Close - General
Floor
Feb 9, 2007 · Apt 3
Close - Paint/plaster
Wall
Feb 9, 2007 · Apt 3
Close - Paint/plaster
Wall
Feb 9, 2007 · Apt 3
Close - Electric
Wiring
Feb 9, 2007 · Apt 3
Close - Paint/plaster
Wall
Feb 9, 2007 · Apt 3
Close - General
Mold
Feb 9, 2007 · Apt 3
Close - Nonconst
Vermin
Feb 9, 2007 · Apt 3
Close - Heating
Heat related
Feb 9, 2007 · Apt 3
Close - Heating
Heat related
Feb 9, 2007 · Apt 3
Close - General
Windows
Feb 9, 2007 · Apt 2
Close - Heating
Heat related
Feb 9, 2007 · Apt 2
Close - Heating
Heat-plant
Feb 6, 2007 · Apt 3
Close - Heating
Heat related
Feb 6, 2007 · Apt 3
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Elevator apartment building (D1)
- Year built
- 2015
- Floors
- 7
- Residential units
- 16
- Building area
- 21,730 ft²
- Lot area
- 5,000 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3071 / 55
- Assessed value
- $1,367,100
- Landmark / historic district
- No
HPD registration #228304, last renewed Sep 26, 2025.
Questions about 2265 Hughes Avenue
Who owns 2265 Hughes Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2265 Realty LLC.
Does 2265 Hughes Avenue have violations?
Yes. NYC HPD has recorded 28 housing violations at this property.
Is 2265 Hughes Avenue rent stabilized?
NYC Department of Finance tax bills listed 16 rent-stabilized units here in 2024 (about 100% of its 16 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2265 Hughes Avenue built?
City records list 2015 as the year it was built.
How many apartments are in 2265 Hughes Avenue?
It has 16 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.