2019 Hughes Avenue
Bronx, NY 10457BBL 2-03069-0099Map
Owner of record: 2019 Bb8 LLC
2019 Hughes Avenue is a walk-up apartment building built in 1931 in Bronx, 10457. It has 9 residential units across 4 floors. The owner of record is 2019 Bb8 LLC. HPD has recorded 721 housing violations here, most recently on August 28, 2026. 28 of the 50 most recent violations are still open. City tax records listed 8 rent-stabilized apartments here in 2024.
- HPD violations
- 721
- DOB violations
- 14
- ECB violations
- 3
- HPD complaints
- 259
What to know
Immediately hazardous issues among recent violations are still open.
Date of the most recent HPD inspection that found a problem.
No balance due on recent ECB violations.
Rent stabilization
Counts come from owners' rent-stabilization filings shown on NYC Department of Finance tax bills, as extracted by JustFix. They tell you a building has stabilized apartments, not which ones.
Think your apartment is stabilized? Request its rent history from HCR (free), then check your renewal with the renewal calculator.
Violations
Most recent first. Showing up to 50 per agency.
HPD housing violations · 721
- BHazardous
Discontinue use of rooms for living, disconnect plumbing fixtures and properly seal pipe connections creating a full bathroom at cellar
Aug 28, 2026
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective stucco 4th story south wall at north yard
Aug 20, 2026
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective stucco 4th story south wall at building front yard
Aug 20, 2026
Open — Not complied with - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the house hold items and garbage at cellar
Aug 20, 2026
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective window sill 4th and 3rd story all window at building front
Aug 20, 2026
Open — Not complied with - CImmediately hazardous
Remove the accumulation of refuse and/or rubbish and maintain in a clean condition the bike and garbage at rear yard
Aug 20, 2026
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective roof covering
Aug 20, 2026
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the interior circumfrence of bulkhead sky light at 1st public hall bulkhead from north at center
Aug 12, 2026
Open — False certification - CImmediately hazardous
Properly repair with similar material the broken or defective roof membrane of entire roof
Aug 12, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7, 4th story, 1st apartment from east at south
Jul 20, 2026 · Apt 7
Closed — Violation dismissed
Show 40 more ↓
- BHazardous
Remove all encumbrances consisting of bikes chained to stair rail at public hall, 1st story
Jul 20, 2026
Open — False certification - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Properly repair or replace the broken or defective rubber gasket refrigerator door in the kitchen located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Properly repair with similar material the broken or defective vinyl floor tiles in the entire apartment located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 5th room from east located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective roof covering material
Jun 27, 2026
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 5th room from east located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation closed - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 7, 4th story, 1st apartment from south at west
Jun 27, 2026 · Apt 7
Closed — Violation closed - CImmediately hazardous
M/d law abate the nuisance consisting of metal gate errected at stairwell at public hall, 4th story
Jun 9, 2026
Open — Not complied with - BHazardous
Remove all encumbrances consisting of bicycles and sheetroke at public hall, 1st story
Jun 9, 2026
Open — Not complied with - CImmediately hazardous
Replace or repair the self-closing doors that is missing or defective hinges in the entrance located at apt 7, 4th story, 1st apartment from south at west
Jun 9, 2026 · Apt 7
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective plaster at the west wall in the kitchen located at apt 4, 2nd story, 2nd apartment from south at west
May 29, 2026 · Apt 4
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair with similar material the broken or defective sub floor in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
May 29, 2026 · Apt 4
Open — First no access to re- inspect violation - CImmediately hazardous
Properly repair the source and abate the evidence of a water leak at the ceiling in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
May 29, 2026 · Apt 4
Closed — Violation closed - CImmediately hazardous
Repair the broken or defective plastered surfaces and paint in a uniform color the ceiling in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
May 29, 2026 · Apt 4
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective ceramic floor tiles in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
May 29, 2026 · Apt 4
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 3rd room from east located at apt 7, 4th story, 1st apartment from south at west
May 15, 2026 · Apt 7
Open — Not complied with - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 3rd room from east located at apt 7, 4th story, 1st apartment from south at west
May 15, 2026 · Apt 7
Closed — Violation closed - BHazardous
Properly repair with similar material the broken or defective fire retardant plaster at ceiling through out ceiling at cellar
May 15, 2026
Open — Not complied with - CImmediately hazardous
Properly repair or replace the broken or defective metal ceiling at boiler room
May 15, 2026
Open — First no access to re- inspect violation - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 7, 4th story, 1st apartment from south at west
May 15, 2026 · Apt 7
Open — Not complied with - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the 4th room from east located at apt 7, 4th story, 1st apartment from south at west
May 15, 2026 · Apt 7
Open — Not complied with - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the kitchen located at apt 7, 4th story, 1st apartment from south at west
May 15, 2026 · Apt 7
Open — Not complied with - CImmediately hazardous
Repair the roof so that it will not leak over ceiling in the kitchen located at apt 7, 4th story, 1st apartment from south at west
May 15, 2026 · Apt 7
Closed — Violation closed - ANon-hazardous
File annual bedbug report in accordance with hpd rule as described on the back of this notice of violation or as described on hpds website, www.nyc.gov\hpd, search bed bugs.
Apr 30, 2026
Closed — Violation dismissed - CImmediately hazardous
Properly repair or replace the broken or defective lock at building entrance door at public hall, 1st story
Mar 4, 2026
Closed — Violation closed - CImmediately hazardous
Replace with new the missing 1 wood baluster at bulkehead at public hall stairs, 4th story
Mar 4, 2026
Closed — Violation closed - CImmediately hazardous
Properly repair with similar material the broken or defective bricks and mortar at exterior parapet wall at building front , 1st story
Mar 4, 2026
Open — Not complied with - ANon-hazardous
Paint with light colored paint to the satisfaction of this department at ceiling and all walls at bulkhead at public hall, 4th story
Mar 4, 2026
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective fire retardant material at ceiling at bulkhead at public hall, 4th story
Mar 4, 2026
Open — Not complied with - CImmediately hazardous
Properly repair with similar material the broken or defective marble saddle at door in the bathroom located at apt 5, 3rd story, 1st apartment from south at west
Mar 4, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Replace the broken or defective sink in the kitchen located at apt 5, 3rd story, 1st apartment from south at west
Mar 4, 2026 · Apt 5
Closed — Violation closed - CImmediately hazardous
Provide a safe and adequate supply of electric service to the fixtures at ceiling in the foyer located at apt 5, 3rd story, 1st apartment from south at west
Mar 4, 2026 · Apt 5
Closed — Violation closed - IInformation / order
The premises has been selected to participate in the alternative enforcement program which may result in building-wide inspections, fees, and extensive repair work to correct violations and underlying conditions. charges for repair work done pursuant to this order, if not paid, will become liens on the property
Feb 2, 2026
Open — Info nov sent out - IInformation / order
And is therefore subject to civil penalties, prohibited from certifying violations, and denied the right to recover possession of premises for nonpayment of rent until a valid registration statement is filed.
Nov 17, 2025
Closed — Violation dismissed - BHazardous
Repair the broken or defective plastered surfaces and paint in a uniform color at ceiling in the 4th room from east located at apt 4, 2nd story, 2nd apartment from south at west
Sep 24, 2025 · Apt 4
Closed — Violation closed - BHazardous
Properly repair or replace the broken or defective base cabinet at sink in the kitchen located at apt 4, 2nd story, 2nd apartment from south at west
Sep 24, 2025 · Apt 4
Open — Not complied with - BHazardous
Properly repair with similar material the broken or defective ceramic tiles at east wall and floor in the bathroom located at apt 4, 2nd story, 2nd apartment from south at west
Sep 24, 2025 · Apt 4
Open — Not complied with
DOB building violations · 14
- Low pressure boiler boiler required
Violation issued-failure to file 2023 external low pressure inspection
Sep 23, 2024
Dob violation - active - Low pressure boiler boiler required
Violation issued-failure to file 2020 external low pressure inspection
Jun 30, 2023
Dob violation - active - Low pressure boiler boiler required
Violation issued for failure to file annual boiler 2012 inspection report
May 15, 2014
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 19, 2007
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jan 6, 2006
Dob violation - active - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 27, 2001
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 7, 2000
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Mar 16, 1999
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 4, 1998
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Sep 16, 1997
Dob violation - dismissed
Show 4 more ↓
- Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Feb 10, 1997
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Aug 29, 1995
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
Jun 9, 1994
Dob violation - dismissed - Boilers boiler required
Ll6291-local law 62/91 - boilers boiler required
May 17, 1993
Dob violation - dismissed
ECB violations · 3
- Hazardous
Failure to maintain exterior building wall. noted: displaced, protruding masonry windowsill at 4th fl, east elevation in danger of becoming dislodged. 3rd fl windowsill at east elev. displaced w/missing mortal
Nov 20, 2001 · Penalty $800
Active - Non-hazardous
Occupancy contrary to that allowed by the building department records.nb.224-1909 open cellar-now occupied as a social club throughout. remedy; discontinue illegal use forthwith.
Sep 17, 1992 · Penalty $1,000
Active - Non-hazardous
Illegal use in a residential district social xlub at cellar with 2 pool tables refrigerator 2 commericial and candy in a r7-1 district. remedy: discontinued illegal use forthwith.
Sep 17, 1992 · Penalty $500
Active
Complaints
- Plumbing
Basin/sink
Mar 2, 2026 · Apt 5
Close - Door/window
Window pane
Mar 2, 2026 · Apt 5
Close - Electric
Lighting
Mar 2, 2026 · Apt 5
Close - Unsanitary condition
Pests
Mar 2, 2026 · Apt 5
Close - Plumbing
Basin/sink
Feb 27, 2026 · Apt 5
Close - Door/window
Window frame
Feb 27, 2026 · Apt 5
Close - Electric
No lighting
Feb 27, 2026 · Apt 5
Close - Plumbing
Basin/sink
Feb 26, 2026 · Apt 5
Close - Door/window
Window frame
Feb 26, 2026 · Apt 5
Close - Electric
No lighting
Feb 26, 2026 · Apt 5
Close
Show 40 more ↓
- Paint/plaster
Ceiling
Feb 26, 2026 · Apt 5
Close - Plumbing
Basin/sink
Oct 6, 2025 · Apt 5
Close - Electric
No lighting
Oct 6, 2025 · Apt 5
Close - Flooring/stairs
Floor
Sep 22, 2025 · Apt 4
Close - Paint/plaster
Wall
Sep 22, 2025 · Apt 4
Close - Flooring/stairs
Floor
Sep 22, 2025 · Apt 4
Close - Paint/plaster
Ceiling
Sep 22, 2025 · Apt 4
Close - Unsanitary condition
Mold
Sep 22, 2025 · Apt 4
Close - Plumbing
Basin/sink
Sep 22, 2025 · Apt 4
Close - Plumbing
Basin/sink
Sep 15, 2025 · Apt 5
Close - Paint/plaster
Ceiling
Sep 15, 2025 · Apt 5
Close - Electric
No lighting
Sep 15, 2025 · Apt 5
Close - Paint/plaster
Ceiling
Sep 15, 2025 · Apt 5
Close - Heat/hot water
Entire building
Mar 2, 2025 · Apt 8
Close - Heat/hot water
Entire building
Feb 21, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Jan 15, 2025 · Apt BLDG
Close - Unsanitary condition
Pests
Jan 14, 2025 · Apt 6
Close - Paint/plaster
Ceiling
Jan 14, 2025 · Apt 4
Close - Unsanitary condition
Mold
Jan 14, 2025 · Apt 5
Close - Unsanitary condition
Pests
Jan 14, 2025 · Apt 8
Close - Heat/hot water
Entire building
Jan 12, 2025 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 31, 2024 · Apt BLDG
Close - Heat/hot water
Entire building
Dec 24, 2024 · Apt 5
Close - Heat/hot water
Apartment only
Dec 24, 2024 · Apt 4
Close - Unsanitary condition
Mold
Dec 24, 2024 · Apt 8
Close - Unsanitary condition
Pests
Dec 24, 2024 · Apt 7
Close - Safety
Smoke detector
Dec 24, 2024 · Apt 7
Close - Safety
Carbon monoxide detector
Dec 24, 2024 · Apt 7
Close - Heat/hot water
Entire building
Dec 21, 2024 · Apt BLDG
Close - Safety
Carbon monoxide detector
Dec 20, 2024 · Apt 5
Close - Safety
Fire escape
Dec 20, 2024 · Apt 4
Close - Safety
Smoke detector
Dec 20, 2024 · Apt 5
Close - Unsanitary condition
Pests
Dec 20, 2024 · Apt 4
Close - Door/window
Door
Dec 20, 2024 · Apt 4
Close - Safety
Smoke detector
Dec 20, 2024 · Apt 4
Close - Safety
Carbon monoxide detector
Dec 20, 2024 · Apt 4
Close - Unsanitary condition
Mold
Dec 20, 2024 · Apt 4
Close - Unsanitary condition
Pests
Dec 20, 2024 · Apt 6
Close - Safety
Smoke detector
Dec 20, 2024 · Apt 6
Close - Safety
Carbon monoxide detector
Dec 20, 2024 · Apt 6
Close
Sales history
No recorded sales in our data
Building details
- Building type
- Walk-up apartment building (C1)
- Year built
- 1931
- Floors
- 4
- Residential units
- 9
- Building area
- 8,513 ft²
- Lot area
- 2,793 ft²
- Zoning
- R7-1
- Community board
- 206
- Council district
- 15
- Block / lot
- 3069 / 99
- Assessed value
- $761,850
- Landmark / historic district
- No
HPD registration #205656, last renewed Nov 26, 2025.
Questions about 2019 Hughes Avenue
Who owns 2019 Hughes Avenue?
The owner of record in NYC Department of City Planning PLUTO data is 2019 Bb8 LLC.
Does 2019 Hughes Avenue have violations?
Yes. NYC HPD has recorded 721 housing violations at this property.
Is 2019 Hughes Avenue rent stabilized?
NYC Department of Finance tax bills listed 8 rent-stabilized units here in 2024 (about 89% of its 9 apartments). To confirm a specific apartment, request its rent history from NYS Homes and Community Renewal.
When was 2019 Hughes Avenue built?
City records list 1931 as the year it was built.
How many apartments are in 2019 Hughes Avenue?
It has 9 residential units.
Source: NYC Open Data (DCP PLUTO, HPD, DOB, ECB/OATH, DOF). Records can lag the city's systems. Data refreshed weekly.